Changeflow GovPing Transportation U.S. 150/Illinois 78 Resurfacing Begins April 2...
Routine Notice Added Final

U.S. 150/Illinois 78 Resurfacing Begins April 28 in Brimfield and Laura

Favicon for idot.illinois.gov IL DOT News
Published
Detected
Email

Summary

The Illinois Department of Transportation announced resurfacing work on U.S. 150/Illinois 78 from the Interstate 74 exit ramp to U.S. 150 in Brimfield and Laura, beginning April 28, 2026. The project will reduce the roadway to one lane with traffic controlled by flaggers and includes median work, patching, milling, and resurfacing. Motorists should expect delays and are advised to allow extra travel time or use alternate routes when feasible.

“The work will reduce U.S. 150/Illinois 78 to one lane, with traffic controlled by flaggers.”

IL DOT , verbatim from source
Published by IL DOT on illinois-department-of-transportation.prezly.com . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

About this source

GovPing monitors IL DOT News for new transportation regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 38 changes logged to date.

What changed

The Illinois Department of Transportation announced a resurfacing project along U.S. 150/Illinois 78 between Brimfield and Laura, Illinois, commencing April 28, 2026. The work will reduce the highway to one lane with flaggers directing traffic and encompasses median work, patching, milling, and resurfacing operations. Motorists traveling through this corridor should anticipate delays and may want to consider alternate routes. The project is expected to be completed by mid-July 2026.

Archived snapshot

Apr 25, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

District 4, Construction

U.S. 150/Illinois 78 resurfacing begins April 28

April 24, 2026

BRIMFIELD – The Illinois Department of Transportation announced that resurfacing of U.S. 150/Illinois 78 from the Interstate 74 exit ramp to U.S. 150 in Brimfield and Laura begins April 28.

The work will reduce U.S. 150/Illinois 78 to one lane, with traffic controlled by flaggers. The overall project includes median work, patching, milling, and resurfacing and is expected to be completed by mid-July.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For more information on IDOT projects, click here. For IDOT District 4 updates, follow us on Twitter at @IDOTDistrict4 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

Kimberly Hoskins

Communications Outreach Liaison – Region 3 (District 4, District 5), Illinois Department of Transportation
- Kimberly.Hoskins@Illinois.gov
- (309) 370-1743

Paul Wappel

IDOT
- Paul.wappel@illinois.gov
- (217) 685-0082

Share

Copy URL

Latest stories

Westbound I-64 lane closures in St. Clair County for traffic control reconfiguration CASEYVILLE – The Illinois Department of Transportation today announced lane closures on westbound Interstate 64 between Illinois 159 and Illinois 157 for a traffic control reconfiguration beginning at 12 a.m. Sunday, April 26, reducing traffic to one lane. The lanes are expected to reopen by 6 a.m. on Monday, April 27. illinois-department-of-transportation.prezly.com Foster Avenue ramp to outbound Kennedy to close May 4 CHICAGO – The Illinois Department of Transportation announced today that as part of ongoing efforts to rebuild the bridge carrying Foster Avenue over the Kennedy Expressway (Interstate 90), in Chicago, a ramp closure along with overnight lane closures are scheduled to begin, weather permitting, Monday, May 4. illinois-department-of-transportation.prezly.com U.S. 20 in Jo Daviess County reopens 12-day closure aided in $31.6 million reconstruction project illinois-department-of-transportation.prezly.com

Get daily alerts for IL DOT News

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from IL DOT.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
IL DOT
Published
April 24th, 2026
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Transportation companies Drivers Government agencies
Industry sector
9211 Government & Public Administration
Activity scope
Road resurfacing Traffic control Highway maintenance
Geographic scope
Illinois US-IL

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Transportation Public Health

Get alerts for this source

We'll email you when IL DOT News publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!