I-40 Eastbound Flyover Repairs, Lane Closures, April 23-27
Summary
TDOT will perform concrete pavement repairs on I-40 eastbound before the flyover at mile marker 13.6 in Memphis, Tennessee. Nighttime and weekend lane closures are scheduled from Thursday, April 23 through Monday, April 27, 2026, with crews working from 8:00 p.m. to 5:00 a.m. One lane will remain open during the work. May 1-3 are designated as backup dates if weather interferes with the schedule.
About this source
GovPing monitors TN DOT News for new transportation regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 12 changes logged to date.
What changed
TDOT announced planned concrete pavement repairs on I-40 eastbound before the flyover at mile marker 13.6 in Memphis, Tennessee. Lane closures and traffic shifts will begin Thursday, April 23, with full repair operations running from Friday, April 24 at 8 p.m. through Monday, April 27 at 5 a.m. One lane will remain accessible throughout the work period.
Motorists traveling I-40 eastbound in Memphis should anticipate nighttime and weekend delays. Drivers are encouraged to use motorist information tools including TN SmartWay Traffic cameras, dial 511, or follow @myTDOT on X for real-time updates. May 1-3 are designated backup dates in case of weather-related postponement.
This is a Notice with Routine attention level — a standard infrastructure maintenance advisory from a state transportation department, not a regulatory rule or enforcement action.
Archived snapshot
Apr 23, 2026GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.
Newsroom
- All News
- TDOT
- Region 3 Nashville Middle TN
- Non Press Releases
- GIS News & Updates
- Middle Tennessee
- News
TDOT to Perform Roadway Repairs on I-40 Eastbound Flyover
Wednesday, April 22, 2026 | 11:11am Memphis, TN — The Tennessee Department of Transportation (TDOT) will conduct concrete pavement repairs on I‑40 eastbound before the flyover at mile marker 13.6. The work will require nighttime and weekend lane closures to safely complete the repairs.
Crews will begin setting up the work zone on Thursday, April 23, from 8:00 p.m. to 5:00 a.m., including lane closures and traffic shifts.
From Friday, April 24, at 8:00 p.m. through Monday, April 27, at 5:00 a.m., crews will repair the concrete pavement, rebuild the roadway base, place new concrete, and complete finishing work. One lane will remain open. All work is weather-dependent, and May 1-3 will serve as a backup date.
Get the latest construction activity and live-streaming SmartWay traffic cameras from your desktop or mobile device at TN SmartWay Traffic. Travelers can also dial 511 for information or follow us on X @myTDOT for statewide travel, or in West Tennessee, follow @NicLawrenceTDOT.
As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel.
Related changes
Get daily alerts for TN DOT News
Daily digest delivered to your inbox.
Free. Unsubscribe anytime.
About this page
Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission
Source document text, dates, docket IDs, and authority are extracted directly from TDOT.
The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.
Classification
Who this affects
Taxonomy
Browse Categories
Get alerts for this source
We'll email you when TN DOT News publishes new changes.
Subscribed!
Optional. Filters your digest to exactly the updates that matter to you.