Changeflow GovPing Transportation I-285/I-20 West Interchange Project Lane Closur...
Routine Notice Added Final

I-285/I-20 West Interchange Project Lane Closures, Apr 17

Favicon for www.dot.ga.gov GA DOT Network
Detected
Email

Summary

GA DOT announces scheduled lane closures for the I-285/I-20 West Interchange Project construction work on April 17, 2024. Motorists should expect delays and use caution in the affected area of the Atlanta metro interchange.

Published by GA DOT on mailchi.mp . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

GA DOT issued a lane closure announcement for the I-285/I-20 West Interchange Project specifying temporary lane restrictions scheduled for April 17. The notice provides construction-related traffic impacts for commuters and commercial drivers in the Atlanta metropolitan area.

Affected parties including trucking companies, delivery services, and commuters should monitor real-time traffic updates and consider alternate routes during the specified closure period. No compliance obligations are imposed by this informational notice.

Archived snapshot

Apr 18, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Campaign URL
- Twitter 0 *tweets*

- RSS

| View this email in your browser |

| For Immediate Release
Friday, April 17, 2026 |

| Contact:
mediarequests@dot.ga.gov |

| Fulton and Cobb Counties Interstate Lane Closure Advisory for the I-285/I-20 West Interchange Project |

WHAT: Weather permitting, the Georgia Department of Transportation (Georgia DOT) contractors will temporarily close interstate lanes for the I-285/I-20 West Interchange project. This project will reconstruct and widen several interstate system-to-system ramps at the I-285/I-20 West Interchange and add a combination of collector-distributor lanes or connecting lanes, and auxiliary lanes along I-20 west and I-285 north of the interchange.

Lane Closure(s)
| Roadway | Activity | Start Date | End Date | Times |
| I-285 Northbound |
| Cascade Road to Bolton Road | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 20 | Friday, April 24 | 9 p.m. – 5 a.m. Nightly |
| Cascade Road to Bolton Road | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 20 | Friday, April 24 | 11 p.m. - 5 a.m.
Nightly |
| I-285 Southbound |
| US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. Drive | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 20 | Friday, April 24 | 9 p.m. – 5 a.m.
Nightly |
| US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. Drive | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 20 | Friday, April 24 | 11 p.m. – 5 a.m.
Nightly |
| SR 280/South Cobb Drive to the I-20 Interchange | Pacing operation, all lanes and shoulders | Monday, April 20 | Thursday, April 23 | 10:30 a.m. - 12 p.m. Daily |
| I-20 Westbound |
| Anderson Avenue underpass to Riverside Parkway | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 20 | Sunday, April 26 | 9 p.m. – 5 a.m. Nightly |
| Anderson Avenue underpass to Riverside Parkway | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 20 | Sunday, April 26 | 11 p.m. – 5 a.m. Nightly |
| I-20 Eastbound |
| SR 70/Fulton Industrial Boulevard to the I-285 Interchange | Pacing operation, all lanes and shoulders | Monday, April 20 | Thursday, April 23 | 10:30 a.m. - 12 p.m. Daily |
| Riverside Parkway to the I-285 Interchange | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 20 | Sunday, April 26 | 9 p.m. - 5 a.m.
Nightly |
| Riverside Parkway to the I-285 Interchange | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 20 | Sunday, April 26 | 11 p.m. - 5 a.m.
Nightly |

| Other Locations |
| SR 70/Fulton Industrial Boulevard SB from Wendell Drive to Shirley Drive | Single, right-lane, and right-shoulder closure | Monday, April 20 | Friday, April 24 | 8 p.m. - 5 a.m.
Nightly |
| SR 139/MLK Jr. Drive NB from Old Gordon Road to Adamsville Drive | Single, right-lane, and right-shoulder closure | Monday, April 20 | Friday, April 24 | 8 p.m. - 5 a.m.
Nightly |
| SR 70/Fulton Industrial Boulevard SB from Wendell Drive to Shirley Drive | Single, right-lane, and right-shoulder closure | Friday, April 24 | Monday, April 27 | 8 p.m. - 5 a.m.
Round-the-Clock |
| SR 139/MLK Jr. Drive NB from Old Gordon Road to Adamsville Drive | Single, right-lane, and right-shoulder closure | Friday, April 24 | Monday, April 27 | 8 p.m. - 5 a.m.
Round-the-Clock |
| Harwell Road from Collier Drive to Amhurst Drive | Flagging operation | Saturday, April 25 | Sunday, April 26 | 8 p.m. – 5 a.m.
Overnight |
| I-20 Westbound to I-285 Northbound |
| Overnight closure and detour (Map)
Motorists traveling on I-20 westbound will continue to Fulton Industrial Boulevard (Exit 49), turn left, turn on I-20 eastbound and follow signs onto I-285 northbound (Exit 51B). | | Thursday, April 23 | Sunday, April 26 | 9 p.m. until 5 a.m.
Nightly |
| I-285 Northbound to I-20 Westbound |
| Overnight closure and detour (Map)
Motorists traveling on I-285 northbound will continue to US 78/Donald Lee Hollowell Pkwy (Exit 12), turn left, turn on I-285 southbound, and then merge onto I-20 westbound (Exit 10B) | | Thursday, April 23 | Sunday, April 26 | 9 p.m. until 5 a.m.
Nightly |
| I-285 Southbound to I-20 Westbound |
| Overnight closure and detour (Map)
Motorists traveling on I-285 southbound will continue to SR 139/Martin Luther King Jr. Drive (Exit 9), turn left, turn onto the loop ramp to I-285 northbound, and then merge onto I-20 westbound (Exit 10B) | | Thursday, April 23 | Sunday, April 26 | 9 p.m. until 5 a.m.
Nightly |
| I-285 Northbound to I-20 Westbound |
Motorists traveling on I-285 northbound will continue to US 78/Donald Lee Hollowell Pkwy (Exit 12), turn left, turn on I-285 southbound, and then merge onto I-20 westbound (Exit 10B) | | Wednesday, April 29 | Saturday, May 2 | 9 p.m. until 5 a.m.
Nightly |

| NOTE: The listed detours will be scheduled so they will not conflict with one another. Closures and detours will be coordinated to ensure proper maintenance of traffic. No more than one ramp in the I-285/I-20 West Interchange will be closed at a time.

Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

For additional project information, visit https://0013918-gdot.hub.arcgis.com/ . |

| | Follow Us |

| | Like Us |

| | Visit Us |

| | See Us |

| | Watch Us |

| The information you provide to the Georgia Department of Transportation will be used solely by GDOT. The Department does not sell or offer a subscriber's personal information to third parties for marketing purposes. To no longer receive this e-news letter, please select "unsubscribe from this list" below. |

| Copyright © 2026 Georgia Department of Transportation, All rights reserved.

Our mailing address is:
Georgia Department of Transportation
Office of Communications
600 West Peachtree Street N.W.
Atlanta, GA 30308

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list |

Get daily alerts for GA DOT Network

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from GA DOT.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
GA DOT
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Transportation companies
Industry sector
4841 Trucking & Logistics
Activity scope
Road construction Traffic management
Geographic scope
US-GA US-GA

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Transportation

Get alerts for this source

We'll email you when GA DOT Network publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!