Changeflow GovPing Energy RIIO-3 Associated Documents Modifications Consu...
Priority review Consultation Amended Consultation

RIIO-3 Associated Documents Modifications Consultation

Favicon for www.ofgem.gov.uk UK Ofgem Publications & Decisions
Published April 1st, 2026
Detected April 1st, 2026
Email

Summary

Ofgem published a consultation on proposed modifications to RIIO-3 associated documents, including GD2/GD3 and GT2/GT3 Crossover Guidance documents, an issues log, and NGET NLRE PCD Suite supplementary guidance. The consultation covers methodology and process for making crossover adjustments to allowances for gas distribution, gas transmission, and electricity transmission networks. Comments close 13 May 2026.

What changed

Ofgem is consulting on modifications to RIIO-3 price control associated documents, including four draft guidance documents: GD2/GD3 Crossover Guidance, GT2/GT3 Crossover Guidance, the related issues log, and NGET NLRE PCD Suite Supplementary Guidance (Appendix 7 to PCD Reporting Requirements Version 6). These documents establish scope, principles, methodology, and process for GD2/GD3 and GT2/GT3 crossover adjustments to allowances, including Ofgem's assessment and implementation approach.

Energy networks (gas distribution, gas transmission, and electricity transmission) and interested parties should review the draft documents and submit comments to RIIO3@ofgem.gov.uk by 13 May 2026. The NGET NLRE PCD Suite guidance specifically affects NGET's reporting requirements for three Price Control Deliverables. Non-participation could result in networks being unprepared for crossover adjustment processes when RIIO-3 takes effect.

What to do next

  1. Review draft GD2/GD3 and GT2/GT3 Crossover Guidance documents for impact on network operations
  2. Submit comments to RIIO3@ofgem.gov.uk by 13 May 2026
  3. Assess NGET NLRE PCD Suite supplementary guidance if applicable to electricity transmission operations

Source document (simplified)

Modifications to additional network price control (RIIO-3) associated documents

Publication type: Consultation Publication date:

1 April 2026

Closing date: 13 May 2026 Status: Open Topic: Energy network price controls Subtopic: RIIO-3 Get emails about this page Print this page

Related links

Share the page

  • We are seeking views on the proposed modifications to associated documents for the RIIO-3 price control.

Consultation description

The crossover guidance documents that we are consulting on set out the scope, principles, methodology, and process for making GD2/GD3 and GT2/GT3 crossover adjustments to allowances, including how Ofgem will assess and implement those adjustments. We are also publishing the issues log which sets out our responses to the questions received from networks after our initial consultation.

We propose to include the NGET NLRE PCD Suite Supplementary Guidance as an NGET-specific Appendix 7 to our Price Control Deliverable Reporting Requirements and Methodology: Version 6. It provides direction on reporting requirements for three NGET PCDs.

Who should respond

We welcome responses from:

  • gas distribution networks
  • gas transmission networks
  • electricity transmission networks
  • anyone with an interest in the RIIO-3 price control

How to respond

Submit your response by 13 May 2026 by emailing RIIO3@ofgem.gov.uk.

Consultation documents

Draft GD2 and GD3 Crossover Guidance and Submission Requirements document (clean) [PDF, 153.00KB] Draft GD2 and GD3 Crossover Guidance and Submission Requirements document (tracked changes) [PDF, 207.28KB] Draft GT2 and GT3 Crossover Guidance and Submission Requirements document (clean) [PDF, 154.58KB] Draft GT2 and GT3 Crossover Guidance and Submission Requirements document (tracked changes) [PDF, 182.63KB] GD and GT Crossover Guidance issues log [XLSX, 55.09KB] Draft PCD Reporting Requirements and Methodology document – Appendix 7 NGET NLRE PCD Suite supplementary guidance [PDF, 421.09KB] Get emails about this page Print this page

Related links

Share the page

Named provisions

GD2/GD3 Crossover Guidance GT2/GT3 Crossover Guidance NGET NLRE PCD Suite PCD Reporting Requirements and Methodology

Source

Analysis generated by AI. Source diff and links are from the original.

Classification

Agency
Ofgem
Published
April 1st, 2026
Comment period closes
May 13th, 2026 (42 days)
Instrument
Consultation
Legal weight
Non-binding
Stage
Consultation
Change scope
Substantive

Who this affects

Applies to
Energy companies
Industry sector
2210 Electric Utilities
Activity scope
Network Price Control Crossover Adjustments Allowance Reporting
Geographic scope
United Kingdom GB

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Utilities Regulation Price Controls

Get Energy alerts

Weekly digest. AI-summarized, no noise.

Free. Unsubscribe anytime.

Get alerts for this source

We'll email you when UK Ofgem Publications & Decisions publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.