Kankakee Hydroelectric Project Subsequent Minor License Application
Summary
The Federal Energy Regulatory Commission has issued a notice of application filing for the Kankakee Hydroelectric Project (FERC Project No. 8632-023), submitted by the City of Kankakee, Illinois. The project, located on the Kankakee River in Kankakee County, Illinois, comprises a 300-acre reservoir, a 440-foot concrete dam with an inflatable rubber dam, three 400-kilowatt generating units with a total installed capacity of 1.2 megawatts, and associated facilities. The application requests a subsequent minor license to continue operating the project in run-of-river mode, with estimated annual energy production of approximately 1,124 megawatt hours. Resource agencies, Indian Tribes, and interested persons have until June 2, 2026 to file additional study requests and requests for cooperating agency status.
What changed
FERC has published a notice of application filing for the Kankakee Hydroelectric Project, a 1.2-megawatt run-of-river hydroelectric facility on the Kankakee River. The application, submitted by the City of Kankakee, Illinois, seeks a subsequent minor license under the Federal Power Act. Interested resource agencies, Indian Tribes, and persons have a 60-day window from the filing date (April 3, 2026) to request additional scientific studies or cooperating agency status, with a hard deadline of June 2, 2026. The application is not yet ready for environmental analysis; FERC's procedural schedule projects a deficiency letter by July 2026 and readiness for environmental analysis by December 2026. Cooperating agencies should be aware that participation in environmental document preparation precludes intervention in the proceeding.
Archived snapshot
Apr 21, 2026GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.
Content
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 8632-023.
c. Date filed: April 3, 2026.
d. Applicant: City of Kankakee, Illinois.
e. Name of Project: Kankakee Hydroelectric Project (project).
f. Location: The project is located on the Kankakee River in Kankakee County, Illinois.
g. Filed Pursuant to: Federal Power Act 16 U.S.C.791(a)-825(r).
h. Applicant Contact: Mr. Zachary Newton, Utility Superintendent—City of Kankakee, Kankakee Environmental Services Utility—295 North Harrison Ave.,
Kankakee, IL 60901; telephone: 815-933-0454; or email: zjnewton@citykankakee-il.gov.
i. FERC Contact: Laura Washington at (202) 502-6072; or email at laura.washington@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues
that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests
described in item l below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's regulations, if any resource agency, Indian Tribe, or person
believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete
analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with
the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant.
l. Deadline for filing additional study requests and requests for cooperating agency status: on or before 5:00 p.m. Eastern Time on June 2, 2026.
The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency
status using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 10,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy via U.S. Postal
Service to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any other carrier must be addressed to: Debbie Anne A. Reese, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-8632-023.
m. The application is not ready for environmental analysis at this time.
n. The project consists of: (1) a 300-acre reservoir; (2) a 440-foot-long concrete dam topped by a 2-foot-high inflatable rubber dam; (3) a 100-foot-long
intake channel; (4) a powerhouse with three 400-kilowatt generating units with a total installed capacity of 1.2 megawatts;
(5) a 60-foot-long tailrace channel; and (6) appurtenant facilities. The project is operated in a run-of-river mode with an
estimated annual energy production of approximately 1,124 megawatt hours. The applicant proposes to continue to operate the
project in a run-of-river mode.
o. In addition to publishing the full text of this notice in the
Federal Register
, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via the internet through the Commission's Home Page (http://www.ferc.gov) using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access
the document (P-8632). For assistance, contact FERC at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC
Online Support.
p. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact
the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov.
q. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made
as appropriate.
| Milestone | Target date |
|---|---|
| Issue Deficiency Letter and Request Additional Information | July 2026. |
| Issue Acceptance Letter and Notice | October 2026. |
| Issue Scoping Notice | October 2026. |
| Scoping Comments due | November 2026. |
| Issue Ready for Environmental Analysis Notice | December 2026. |
r. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the
notice of ready for environmental analysis.
(Authority: 18 CFR 2.1)
Dated: April 15, 2026. Debbie-Anne A. Reese, Secretary. [FR Doc. 2026-07655 Filed 4-17-26; 8:45 am] BILLING CODE 6717-01-P
Download File
Download
CFR references
Mentioned entities
Citations
Parties
Related changes
Get daily alerts for Regs.gov: Federal Energy Regulatory Commission
Daily digest delivered to your inbox.
Free. Unsubscribe anytime.
Source
About this page
Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission
Source document text, dates, docket IDs, and authority are extracted directly from FERC.
The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.
Classification
Who this affects
Taxonomy
Browse Categories
Get alerts for this source
We'll email you when Regs.gov: Federal Energy Regulatory Commission publishes new changes.
Subscribed!
Optional. Filters your digest to exactly the updates that matter to you.