Changeflow GovPing Energy Tygart LLC Withdraws Hydroelectric Project Exte...
Routine Notice Removed Final

Tygart LLC Withdraws Hydroelectric Project Extension Request

Favicon for www.regulations.gov Regs.gov: Federal Energy Regulatory Commission
Published
Detected
Email

Summary

Tygart LLC voluntarily withdrew its extension of time request for the Tygart Hydroelectric Project No. 12613 at the Tygart Dam on the Tygart River in Taylor County, West Virginia. The withdrawal became effective April 13, 2026, pursuant to Commission Rule 216(b), terminating the proceeding. No opposition was filed and the Commission took no action to disallow the withdrawal.

Published by FERC on regulations.gov . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

Tygart LLC filed an extension of time request on February 17, 2026, pursuant to Articles 301 and 410 of the license for the Tygart Hydroelectric Project No. 12613. The licensee subsequently withdrew this request on March 27, 2026, and the withdrawal became effective on April 13, 2026, under Rule 216(b) of the Commission's Rules of Practice and Procedure, terminating the proceeding.

This is an administrative closure with no regulatory implications for other parties. The project remains located at the U.S. Army Corps of Engineers' Tygart Dam on federal land administered by the Corps.

Archived snapshot

Apr 21, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Content

On February 17, 2026, Tygart LLC (licensee) filed an extension of time request pursuant to Articles 301 and 410 of the license
for the Tygart Hydroelectric Project No. 12613. (1) On March 27, 2026, the licensee filed a notice of withdrawal of the request. The unconstructed project is located at the U.S.
Army Corps of Engineers' (Corps) Tygart Dam on the Tygart River in the community of Grafton in Taylor County, West Virginia.
The project occupies federal land administered by the Corps.

No motion in opposition to the notice of withdrawal has been filed, and the Commission has taken no action to disallow the
withdrawal. Pursuant to Rule 216(b) of the Commission's Rules of Practice and Procedure, (2) the withdrawal of the extension of time request became effective on April 13, 2026, (3) and this proceeding is hereby terminated.

(Authority: 18 CFR 2.1)

Dated: April 15, 2026. Debbie-Anne A. Reese, Secretary. [FR Doc. 2026-07653 Filed 4-17-26; 8:45 am] BILLING CODE 6717-01-P

Footnotes

(1) Tygart LLC, 155 FERC ¶ 62,076 (2016).

(2) 18 CFR 385.216(b) (2025).

(3) See 18 CFR 385.2007 (2025).

Download File

Download

CFR references

18 CFR 385.216(b) 18 CFR 385.2007

Parties

Get daily alerts for Regs.gov: Federal Energy Regulatory Commission

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from FERC.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
FERC
Published
April 15th, 2026
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Final
Change scope
Minor
Document ID
FR Doc. 2026-07653
Docket
FERC-2026-2251-0001

Who this affects

Applies to
Energy companies
Industry sector
2210 Electric Utilities
Activity scope
Hydroelectric licensing Extension request withdrawal
Geographic scope
United States US

Taxonomy

Primary area
Energy
Operational domain
Regulatory Affairs
Topics
Environmental Protection

Get alerts for this source

We'll email you when Regs.gov: Federal Energy Regulatory Commission publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!