Changeflow GovPing Banking & Finance Record of decision for currency production faci...
Routine Notice Added

Record of decision for currency production facility construction and operation

Favicon for www.federalregister.gov FR: Engraving and Printing Bureau
Detected
Email

Summary

Record of decision for currency production facility construction and operation

Published by BEP on federalregister.gov . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

Archived snapshot

Mar 14, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Legal Status This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.

The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to About the Federal Register on NARA's archives.gov.

The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.

Legal Status

Notice

Record of Decision for the Proposed Construction and Operation of a Currency Production Facility Within the National Capital Region

A Notice by the Engraving and Printing Bureau on 10/21/2021

  • 1.

1.

Enhanced Content - Public Comments
- Regulations.gov Data Enhanced Content - Regulations.gov Data Additional information is not currently available for this document.

Enhanced Content - Regulations.gov Data

- Sharing Enhanced Content - Sharing Shorter Document URL https://www.federalregister.gov/d/2021-22909 Email Email this document to a friend Enhanced Content - Sharing

  • Print Enhanced Content - Print
  • Document Statistics Enhanced Content - Document Statistics Document page views are updated periodically throughout the day and are cumulative counts for this document. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.

Page views 293
as of
03/14/2026 at 4:15 pm EDT Enhanced Content - Document Statistics
- Other Formats Enhanced Content - Other Formats This document is also available in the following formats:

JSON Normalized attributes and metadata XML Original full text XML MODS Government Publishing Office metadata More information and documentation can be found in our developer tools pages.

Enhanced Content - Other Formats
- Public Inspection Public Inspection This PDF is FR Doc. 2021-22909 as it appeared on Public Inspection on
10/20/2021 at 8:45 am.

It was viewed
3
times while on Public Inspection.

If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.

Public Inspection
Published Document: 2021-22909 (86 FR 58393) This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Document Headings Document headings vary by document type but may contain
the following:

  1. the agency or agencies that issued and signed a document
  2. the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to
  3. the agency docket number / agency internal file number
  4. the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details.
Department of the Treasury
Bureau of Engraving and Printing

AGENCY:

Bureau of Engraving and Printing, Department of the Treasury.

ACTION:

Notice of availability (NOA).

SUMMARY:

The U.S. Department of the Treasury (Treasury), Bureau of Engraving and Printing (BEP) announces the availability of the Record of Decision (ROD) for the proposed construction and operation of a Currency Production Facility (CPF) within the National Capital Region (NCR) (Proposed Action). Treasury previously published its Final Environmental Impact Statement (EIS) for the Proposed Action on June 4, 2021.

In accordance with the National Environmental Policy Act (NEPA), the ROD identifies all alternatives Treasury considered for the Proposed Action, identifies the environmentally preferable alternative, states Treasury's decision to implement the Preferred Alternative, and discusses factors balanced by the agency in making its decision. The ROD also adopts all practicable mitigation measures to avoid or minimize environmental harm and commits to monitoring their implementation. The Proposed Action will replace Treasury's insufficient Washington, DC production facility (DC Facility), and will provide Treasury with a modern, scalable, sufficiently sized production facility within the NCR that meets Treasury's needs. Treasury has also signed a Finding of No Practicable Alternative (FONPA) addressing potential impacts on wetlands Executive Order 11990, Protection of Wetlands.

DATES:

Treasury's Acting Assistant Secretary for Management signed the ROD on October 8, 2021.

ADDRESSES:

Electronic copies of the ROD, Final EIS, FONPA, and other related materials are available on the project website at https://www.nab.usace.army.mil/​home/​bep-replacement-project. If you cannot access the materials online, you may request hard copies of the materials via the methods identified in the FOR FURTHER INFORMATION CONTACT section of this NOA.

FOR FURTHER INFORMATION CONTACT:

Please contact Mr. Harvey Johnson, USACE—Baltimore, Programs and Project Management Division: (1) By email to: BEP-EIS@usace.army.mil; (2) by phone at: (410) 977-6733; or (3) by mail to: U.S. Army Corps of Engineers, Baltimore District, ATTN: Bureau of Engraving and Printing (BEP) Project EIS, Michael Schuster, Planning Division, 2 Hopkins Plaza, 10th Floor, Baltimore, MD 21201.

SUPPLEMENTARY INFORMATION:

BEP's mission includes manufacturing U.S. currency notes; research, development, testing, and evaluation of counterfeit deterrents; and development of production automation technologies. Treasury currently operates two production facilities for this purpose: The DC Facility and a facility in Fort Worth, Texas. The DC Facility has been in operation for more than 100 years and is neither able to support modern currency production nor able to support Treasury's, and specifically the BEP's, current and future mission.

Within the DC Facility, manufacturing processes are inefficient and inflexible. The DC Facility's configuration poses safety risks to staff, and the downtown location of the DC Facility prevents Treasury from complying with physical security standards. The condition, configuration, and location of the DC Facility severely limit Treasury's ability to modernize the DC Facility through renovation, rendering modernization of existing facilities an untenable long-term solution.

Over the past 20 years, Treasury has considered several scenarios to address the inadequacy of its current facilities in the NCR, including renovation of the DC Facility and new construction within the NCR. Treasury concluded that construction of a new replacement CPF, as opposed to renovation of the DC Facility, was the most efficient and cost-effective option. As such, Treasury, on behalf of the BEP, proposed to construct and operate a new CPF within the NCR to replace its existing DC Facility. The Proposed Action will provide Treasury with a modern, scalable, sufficiently sized production facility, resulting in more efficient, streamlined currency production, while allowing Treasury to maintain its presence within the NCR.

Treasury's Final EIS analyzed the potential environmental, cultural, and socioeconomic impacts associated with the Proposed Action, including cumulative effects. Minimization of adverse effects through avoidance and environmentally sensitive design will be used to avoid impacts to sensitive resources to the maximum extent practicable. Where these efforts are not sufficient to avoid adverse effects, the Final EIS identified additional mitigation measures that Treasury may implement to further reduce identified adverse impacts. The ROD identifies the mitigation measures that Treasury formally commits to implement and monitor.

In support of the EIS, Treasury, with assistance from USACE, conducted site-specific studies in accordance with federal and state requirements, such as Sections 404/401 of the Clean Water Act (CWA) and Section 106 of the National Historic Preservation Act.

As part of the planning process, Treasury gathered data on numerous potential sites in the NCR that had the potential to support Treasury's initial minimum criteria for construction of a new CPF. Treasury evaluated each potential site against various screening criteria to identify reasonable alternatives. Following an extensive and thorough screening process, Treasury identified one reasonable Action Alternative (the Preferred Alternative) that would meet the purpose of and need for the Proposed Action. This Preferred Alternative is summarized below and analyzed in detail in the Final EIS.

Preferred Alternative: Beltsville Agricultural Research Center (BARC) 200 Area—Former Poultry Research Area

This alternative includes a 104.2-acre parcel of land located in BARC's Central Farm in the 200 Area building cluster (Treasury's proposed parcel). The parcel is located in Prince George's County, Maryland, between Odell Road to the north and Powder Mill Road to the south; Poultry Road runs north to south through the parcel. The parcel, generally ( printed page 58394) consisting of grassland, cropland, scattered trees, and abandoned buildings, is available for redevelopment. Treasury would construct a new entrance road connecting its proposed parcel to Powder Mill Road and would construct several minor modifications to Powder Mill Road in the vicinity of the new intersection. The entrance road and Powder Mill Road modifications require construction activities in an additional 18-acre area, bringing the combined Project Site to a total of approximately 122 acres.

Treasury also carried forward the No Action Alternative for detailed analysis in the Final EIS. While the No Action Alternative would not satisfy the purpose of or need for the Proposed Action, Treasury retained this Alternative to provide a comparative baseline against which to analyze the effects of the Preferred Alternative as required under the Council on Environmental Quality's NEPA regulations (40 Code of Federal Regulations 1502.14 [c]).

Resource areas analyzed in the Final EIS include: Land use; visual resources; air quality; noise; topography and soils; water resources; biological resources; cultural resources; traffic and transportation; utilities; socioeconomics and environmental justice (EJ); hazardous and toxic materials and waste; and human health and safety. Treasury dismissed air space, recreation, and geology from detailed study. Treasury determined the Proposed Action has no potential to cause significant adverse impacts to these resource areas.

Based on the Final EIS analysis, without implementation of mitigation measures, significant adverse impacts could occur to visual resources, water resources, cultural resources, traffic and transportation, and EJ communities (i.e., due to disproportionate adverse traffic impacts). Impacts to all other resource areas would be less-than-significant adverse, negligible, or beneficial. However, in the ROD, Treasury has adopted all practicable means to avoid or minimize environmental harm from the Preferred Alternative. These mitigation measures will further minimize identified potential adverse impacts to each of these resource areas. Importantly, all potential significant adverse impacts will be reduced to less-than-significant levels.

The Preferred Alternative for the Proposed Action will also adversely impact wetlands. Accordingly, Treasury has prepared a FONPA to comply with Executive Order 11990. As described in the Final EIS and ROD, regulatory compliance measures (e.g., permitting under Sections 404/401 of the CWA) and adopted mitigation measures will be implemented to minimize adverse impacts on wetlands.

A Notice of Intent to prepare an EIS for the proposed project was published in the Federal Register on November 15, 2019 (84 FR 62565) and the public scoping period closed on December 15, 2019. Treasury held one public scoping meeting on December 3, 2019. A Notice of Availability of the Draft EIS was published in the Federal Register on November 6, 2020 (85 FR 71074) and the public review and comment period closed on December 21, 2020. Treasury held a Virtual Public Meeting on December 2, 2020. Treasury considered and addressed in the Final EIS comments received on the Draft EIS during the comment period. A Notice of Availability of the Final EIS was published in the Federal Register on June 4, 2021 (86 FR 30040).

Treasury has taken into consideration information and analyses presented in the Final EIS, including potential environmental impacts and recommended mitigation measures; supporting studies; consultation with agencies and Native American Tribes; and the comments received from the public during formal review and comment periods. Treasury has also evaluated our national currency production needs, the BEP's mission requirements, and the purpose of and need for the Proposed Action. Based on these considerations, it is the decision of Treasury to implement the Preferred Alternative and the associated mitigation measures as outlined in the ROD.

Dated: October 15, 2021.

Charles C. Davis,

Project Manager, Bureau of Engraving and Printing.

[FR Doc. 2021-22909 Filed 10-20-21; 8:45 am]

BILLING CODE P

Published Document: 2021-22909 (86 FR 58393)

Get daily alerts for FR: Engraving and Printing Bureau

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from BEP.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
BEP
Instrument
Notice

Get alerts for this source

We'll email you when FR: Engraving and Printing Bureau publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!