Changeflow GovPing Banking & Finance Draft EIS and FONPA for currency production fac...
Routine Notice Added

Draft EIS and FONPA for currency production facility construction

Favicon for www.federalregister.gov FR: Engraving and Printing Bureau
Detected
Email

Summary

Draft EIS and FONPA for currency production facility construction

Published by BEP on federalregister.gov . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

Archived snapshot

Mar 14, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Legal Status This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.

The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to About the Federal Register on NARA's archives.gov.

The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.

Legal Status

Notice

Draft Environmental Impact Statement (EIS) and Draft Finding of No Practicable Alternative (FONPA) for the Proposed Construction and Operation of a Replacement Currency Production Facility at the Beltsville Agricultural Research Center, Prince George's County, MD

A Notice by the Engraving and Printing Bureau on 11/09/2020

  • 1.

1.

Enhanced Content - Public Comments
- Regulations.gov Data Enhanced Content - Regulations.gov Data Additional information is not currently available for this document.

Enhanced Content - Regulations.gov Data

- Sharing Enhanced Content - Sharing Shorter Document URL https://www.federalregister.gov/d/2020-24826 Email Email this document to a friend Enhanced Content - Sharing

  • Print Enhanced Content - Print
  • Document Statistics Enhanced Content - Document Statistics Document page views are updated periodically throughout the day and are cumulative counts for this document. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.

Page views 390
as of
03/14/2026 at 4:15 pm EDT Enhanced Content - Document Statistics
- Other Formats Enhanced Content - Other Formats This document is also available in the following formats:

JSON Normalized attributes and metadata XML Original full text XML MODS Government Publishing Office metadata More information and documentation can be found in our developer tools pages.

Enhanced Content - Other Formats
- Public Inspection Public Inspection This PDF is FR Doc. 2020-24826 as it appeared on Public Inspection on
11/06/2020 at 8:45 am.

It was viewed
5
times while on Public Inspection.

If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.

Public Inspection
Published Document: 2020-24826 (85 FR 71394) This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Document Headings Document headings vary by document type but may contain
the following:

  1. the agency or agencies that issued and signed a document
  2. the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to
  3. the agency docket number / agency internal file number
  4. the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details.
Department of the Treasury
Bureau of Engraving and Printing

AGENCY:

Bureau of Engraving and Printing, Department of the Treasury.

ACTION:

Notice of availability (NOA).

SUMMARY:

The U.S. Department of the Treasury (Treasury), Bureau of Engraving and Printing (BEP) announces the availability of the Draft Environmental Impact Statement (EIS) for the proposed construction and operation of a replacement Currency Production Facility (CPF) at the Beltsville Agricultural Research Center (BARC) in Prince George's County, Maryland. This is the Proposed Action.

DATES:

Comments must be received by December 21, 2020 to be considered during preparation of the Final EIS.

ADDRESSES:

Written comments may be mailed to: ATTN: Bureau of Engraving and Printing (BEP) Project EIS, U.S. Army Corps of Engineers (USACE), Baltimore District Planning Division, 2 Hopkins Plaza, 10th Floor, Baltimore, MD 21201, or emailed to: BEP-EIS@usace.army.mil. Comments may also be submitted online through the project website (https://www.nab.usace.army.mil/​Home/​BEP-Replacement-Project/) or delivered verbally during the public webinar, described below.

FOR FURTHER INFORMATION CONTACT:

Please contact Mr. Harvey Johnson, USACE-Baltimore, Programs and Project Management Division by email at BEP-EIS@usace.army.mil or 410-977-6733. USACE has established a web page that contains information updates and background on this Draft EIS at https://www.nab.usace.army.mil/​Home/​BEP-Replacement-Project/.

SUPPLEMENTARY INFORMATION:

In accordance with the National Environmental Policy Act (NEPA), the Draft EIS analyzes the potential environmental and socioeconomic impacts, and recommends related mitigation measures, associated with the Proposed Action. The Proposed Action would replace Treasury's existing and obsolete currency production functions located in downtown Washington, DC (DC Facility), and would provide Treasury with a modern, scalable, sufficiently sized production facility within the National Capital Region (NCR) that meets Treasury's needs.

The Proposed Action includes construction and operation of an up to 1 million square-foot CPF within the NCR. The Proposed Action would be implemented over an approximately nine-year period, from 2021 to 2029. This duration includes design, construction, equipment installation, acceptance testing to support full operations, and the sequenced transition of approximately 1,600 personnel from Treasury's DC Facility into the completed CPF. Currency manufacturing at the DC Facility would be phased out. The operational life of the Proposed Action is anticipated to be 50 years. Treasury would incorporate Environmental Protection Measures (EPMs), Regulatory Compliance Measures (RCMs), and Best Management Practices (BMPs) into the Proposed Action to proactively minimize ( printed page 71395) potential adverse environmental impacts and comply with applicable environmental regulatory requirements. Additional mitigation measures are recommended to further reduce adverse impacts.

A Draft Finding of No Practicable Alternative (FONPA) addressing potential impacts on wetlands is included in the Draft EIS for comment.

The BEP's mission includes manufacturing U.S. currency notes; research, development, testing, and evaluation of counterfeit deterrents; and development of production automation technologies. Treasury currently operates two production facilities for this purpose: The DC Facility and a facility in Fort Worth, Texas. The DC Facility has been in operation for more than 100 years and is neither able to support modern currency production nor Treasury's (and specifically the BEP's) current and future mission.

The condition, configuration, and location of the DC Facility severely limit Treasury's ability to modernize the DC Facility through renovation. Within the DC Facility, manufacturing processes are inefficient and increase staff safety risks; the location of the DC Facility does not allow Treasury to comply with modern physical security standards.

Over the past 20 years, Treasury has considered several scenarios to address the inadequacy of its current facilities in the NCR, including renovation of the DC Facility and new construction within the NCR. Treasury concluded that construction of a new replacement CPF, as opposed to renovation of the DC Facility, was the most efficient and cost-effective option. As such, Treasury proposes to construct and operate a new CPF on a minimum 100-acre parcel of federally owned, available land within the NCR to provide Treasury with a modern production facility, resulting in more efficient, streamlined currency production, and allowing Treasury to maintain its presence within the NCR.

The Draft EIS analyzes the potential environmental and socioeconomic impacts associated with the Proposed Action, including cumulative effects. Minimization of adverse effects through avoidance and environmentally sensitive design would be used to avoid impacts to sensitive resources to the maximum extent practicable. Where these efforts are not sufficient to avoid adverse effects, the Draft EIS recommends additional mitigation measures that Treasury may implement to further reduce identified adverse impacts.

In support of the EIS, Treasury, with assistance from USACE, is conducting site-specific studies in accordance with federal and state requirements, such as Sections 404/401 of the Clean Water Act (CWA) and Section 106 of the National Historic Preservation Act. The results of these studies will inform the design process and allow Treasury to minimize potential adverse impacts to the extent feasible.

As part of Treasury's planning process, it gathered data on potential sites in the NCR that could support a new CPF. Treasury evaluated each potential site against various screening criteria to identify reasonable alternatives. Treasury identified one reasonable Action Alternative (the Preferred Alternative) that would meet the purpose of and need for the Proposed Action. This Preferred Alternative is summarized below and analyzed in detail in the Draft EIS.

Preferred Alternative: BARC 200 Area

This alternative includes a 104.2-acre parcel of land located in BARC's Central Farm in the 200 Area building cluster. The parcel is located between Odell Road to the north and Powder Mill Road to the south; Poultry Road traverses the site. The parcel, generally consisting of grassland, cropland, scattered trees, and abandoned buildings, is available for redevelopment. Based on its alternatives screening process, Treasury determined that only this parcel met the purpose of and need for the Proposed Action, as well as the established site screening criteria. The Agriculture Improvement Act of 2018 specifically identified this parcel within the BARC 200 Area and included a Congressional authorization for the U.S. Department of Agriculture to transfer this parcel to Treasury for the purpose of constructing and operating the Proposed Action.

Treasury also carried forward the No Action Alternative for detailed analysis in the Draft EIS. While the No Action Alternative would not satisfy the purpose of or need for the Proposed Action, Treasury retained this Alternative to provide a comparative baseline against which to analyze the effects of the Preferred Alternative as required under the Council on Environmental Quality's regulations (40 Code of Federal Regulations 1502.14 [c]).

Resource areas analyzed in the Draft EIS include: Land use; visual resources; air quality; noise; geology, topography, and soils; water resources; biological resources; cultural resources; traffic and transportation; utilities; socioeconomics and environmental justice (EJ); hazardous and toxic materials and waste; and human health and safety. Treasury dismissed air space and recreation from detailed study; through the public scoping process, Treasury determined the Proposed Action has no potential to cause significant adverse impacts to these resource areas.

Based on the Draft EIS analysis, potentially significant adverse impacts could occur to visual resources, water resources, cultural resources, traffic and transportation, and EJ communities (i.e., from disproportionate adverse traffic impacts). Impacts to all other resource areas would be less-than-significant adverse, negligible, or beneficial. Recommended mitigation measures are presented in the Draft EIS to reduce potential adverse effects.

The Preferred Alternative for the Proposed Action would also adversely impact wetlands. Accordingly, Treasury prepared a Draft FONPA to comply with Executive Order 11990, Protection of Wetlands. As described in the Draft EIS, regulatory compliance measures (e.g., permitting under Sections 404/401 of the CWA) would be implemented to minimize adverse impacts on wetlands.

Government agencies, Native American Tribes, and the public are invited to review and comment on the Draft EIS and Draft FONPA. The public comment period begins with the publication of this Notice of Availability in the Federal Register and will last for 45 days.

The Draft EIS and related materials are available on the project website at https://www.nab.usace.army.mil/​home/​bep-replacement-project. If you cannot access the Draft EIS materials online, please send a request for information via email to: BEP-EIS@usace.army.mil; or via mail to: ATTN: Bureau of Engraving and Printing (BEP) Project EIS, U.S. Army Corps of Engineers, Baltimore District Planning Division, 2 Hopkins Plaza, 10th Floor, Baltimore, MD 21201.

The public comment period also includes a virtual public meeting that will provide an opportunity for the public to learn about the Proposed Action (i.e., Preferred Alternative), No Action Alternative, and environmental impact analysis. This meeting will be held online due to COVID-19 restrictions. The virtual public meeting includes two parts: (1) An online reading room and (2) a public webinar. The online reading room, available for the entire 45-day public comment period at https://bep-eis.consultation.ai/, contains public outreach and interpretive materials for the Draft EIS, as well as the Draft EIS itself. The public webinar will consist of a 2-hour online meeting wherein the BEP will give a brief presentation of the Draft EIS and solicit public comments; the specific details of this webinar, including the date, time, link, phone number, and password, will be announced on the ( printed page 71396) project website and in local media at least two weeks in advance of the webinar.

Following the public comment period, Treasury will consider all public comments and prepare and publish a Final EIS prior to making any decision regarding the Proposed Action. Comments must be received or postmarked by December 21, 2020 to be considered during preparation of the Final EIS.

David F. Eisner,

Assistant Secretary for Management, Department of the Treasury.

[FR Doc. 2020-24826 Filed 11-6-20; 8:45 am]

BILLING CODE 4840-01-P

Published Document: 2020-24826 (85 FR 71394)

Get daily alerts for FR: Engraving and Printing Bureau

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from BEP.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
BEP
Instrument
Notice

Get alerts for this source

We'll email you when FR: Engraving and Printing Bureau publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!