Night Work on OR 126 Springfield, April 26
Summary
Crews will begin crack sealing on OR 126 between mileposts 10 and 15 in Springfield starting Sunday, April 26, 2026. Work will occur Sunday through Wednesday, 7 p.m. to 5:30 a.m., with intermittent lane closures in both directions and delays expected through the work zone. Drivers should watch for flaggers and pilot cars and plan extra travel time.
“Crews will begin crack sealing on OR 126 between mileposts 10 and 15 in Springfield starting Sunday, April 26.”
About this source
GovPing monitors OR DOT News for new transportation regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 11 changes logged to date.
What changed
The Oregon Department of Transportation is notifying motorists of scheduled crack sealing maintenance on OR 126 between mileposts 10 and 15 in Springfield. Work begins Sunday, April 26, 2026, and will continue Sunday through Wednesday nights from 7 p.m. to 5:30 a.m. until the work is complete.
Motorists should anticipate intermittent lane closures in both directions, expect delays, and watch for flaggers and pilot cars guiding traffic through the work zone. No detours are indicated; travelers are advised to plan for additional time and slow down through the construction area.
Archived snapshot
Apr 23, 2026GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.
Night work begins on OR 126 in Springfield
Oregon Department of Transportation sent this bulletin at 04/22/2026 10:00 AM PDT Having trouble viewing this email? View it as a Web page.
| # Traffic Alert |
Night work begins on OR 126 in Springfield
Drivers should expect delays as crews work
April 22, 2026,
Crews will begin crack sealing on OR 126 between mileposts 10 and 15 in Springfield starting Sunday, April 26.
Work hours are Sunday through Wednesday, 7 p.m. to 5:30 a.m.
Crews will seal cracks in the pavement to help protect the roadway and extend its life.
Traffic impacts:
- Expect intermittent lane closures in both directions.
- Expect delays through the work zone.
Watch for flaggers and pilot cars and follow directions for your safety.
What to expect:Crews will move through the corridor as work progresses.
Equipment and work vehicles will be active along the highway.
Following crack sealing, crews will return to apply permanent striping with minor traffic impacts.
About the work:
Crack sealing is a preventive maintenance treatment that helps keep roads in good condition. Sealing cracks keeps water from getting under the pavement, which reduces potholes and more serious damage and helps avoid costly repairs in the future.
Please slow down, stay alert, avoid distractions and plan extra travel time through the work zone.
For 24/7 road conditions and traffic alerts visit tripcheck.com or call 5-1-1.
For questions about this project contact Mindy McCartt, 503-507-6045. |
| Manage Account Manage Preferences |
Contact Us | Help |
Oregon Department of Transportation
355 Capitol Street NE, MS 11
Salem, OR , 97301-3871 USA
Related changes
Get daily alerts for OR DOT News
Daily digest delivered to your inbox.
Free. Unsubscribe anytime.
About this page
Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission
Source document text, dates, docket IDs, and authority are extracted directly from OR DOT.
The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.
Classification
Who this affects
Taxonomy
Browse Categories
Get alerts for this source
We'll email you when OR DOT News publishes new changes.
Subscribed!
Optional. Filters your digest to exactly the updates that matter to you.