Milwaukee Avenue Bridge Painting Begins April 27
Summary
The Illinois Department of Transportation announced that cleaning and painting of the bridge carrying Milwaukee Avenue (Illinois 21) over Dempster Street (U.S. 14) in Niles will require lane closures beginning Monday, April 27, 2026, weather permitting. At least one lane will remain open in each direction on Dempster Street between Cumberland and Ozark avenues throughout the work, which is anticipated to be completed in early June. Drivers should expect delays and are encouraged to use alternate routes.
“The public can expect delays and should allow extra time for trips through this area. Alternate routes are encouraged.”
About this source
GovPing monitors IL DOT News for new transportation regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 33 changes logged to date.
What changed
The Illinois Department of Transportation issued a notice announcing bridge cleaning and painting work on Milwaukee Avenue (Illinois 21) over Dempster Street (U.S. 14) in Niles, Illinois. Lane closures on Dempster Street will begin April 27, 2026, weather permitting, with at least one lane maintained in each direction. The work is scheduled for completion in early June.
Affected parties include commuters and freight carriers using Dempster Street between Cumberland and Ozark avenues. No compliance actions are required; the notice advises drivers to expect delays, pay attention to flaggers and signs, obey posted speed limits, and consider alternate routes.
Archived snapshot
Apr 24, 2026GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.
Milwaukee Avenue bridge painting begins April 27
April 23, 2026
CHICAGO –The Illinois Department of Transportation announced today that cleaning and painting of the bridge carrying Milwaukee Avenue (Illinois 21) over Dempster Street (U.S. 14) in Niles will require lane closures on Dempster Street beginning, weather permitting, Monday, April 27.
For the duration of the work, the public should expect various lane shifts with at least one lane open in each direction on Dempster Street between Cumberland and Ozark avenues.
The work is anticipated to be completed in early June.
The public can expect delays and should allow extra time for trips through this area. Alternate routes are encouraged. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.
For more information on IDOT projects, click here. Find traffic and road conditions at www.gettingaroundillinois.com. You also can follow IDOT on Facebook and X.
#
Maria Castaneda
IDOT
- maria.c.castaneda@illinois.gov
- (312) 447-1919
Guy Tridgell
IDOT
- guy.tridgell@illinois.gov
- (312) 343-1731
Share
Copy URL
Latest stories
Southwest Highway at Harlem Avenue intersection improvements begin May 4 CHICAGO – The Illinois Department of Transportation announced today that improvements to the intersection of Southwest Highway (Illinois 7) at Harlem Avenue (Illinois 43) in Worth and Chicago Ridge will begin, weather permitting, Monday, May 4. illinois-department-of-transportation.prezly.com Bridge inspection to close eastbound I-64 over Wabash River April 27 GRAYVILLE – The Illinois Department of Transportation today announced that all lanes of eastbound Interstate 64 over the Wabash River near Grayville and the Illinois-Indiana state line will be closed beginning at 7 p.m. Monday, April 27, for a scheduled routine bridge inspection and minor maintenance work. illinois-department-of-transportation.prezly.com U.S. 20-Mill Road intersection work in Cherry Valley begins May 1 Final project in $302.4 million I-39 corridor improvement will replace Kishwaukee River bridges illinois-department-of-transportation.prezly.com
Related changes
Get daily alerts for IL DOT News
Daily digest delivered to your inbox.
Free. Unsubscribe anytime.
About this page
Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission
Source document text, dates, docket IDs, and authority are extracted directly from IL DOT.
The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.
Classification
Who this affects
Taxonomy
Browse Categories
Get alerts for this source
We'll email you when IL DOT News publishes new changes.
Subscribed!
Optional. Filters your digest to exactly the updates that matter to you.