Changeflow GovPing Transportation Proposed I-75 Commercial Vehicle Lanes Project ...
Routine Notice Added Consultation

Proposed I-75 Commercial Vehicle Lanes Project Public Comment Period and Public Hearing Open House Events

Favicon for www.dot.ga.gov GA DOT Network
Published
Detected
Email

Summary

Georgia DOT is seeking public comments through May 28, 2026 on the Environmental Assessment (EA) for the proposed I-75 Commercial Vehicle Lanes (CVL) project (P.I. No. 0014203), which would add two northbound commercial vehicle lanes on I-75 from the I-75/I-475 Interchange in Monroe County to near the SR 20 Interchange in Henry County. The CVL project is one of the Major Mobility Investment Program (MMIP) projects designed to improve mobility and safety for freight operators and passenger vehicles across Butts, Henry, Lamar, Monroe, and Spalding counties. Georgia DOT will host two in-person Public Hearing Open House events on May 13, 2026 (12-2 p.m. and 5-7 p.m. at Henry County Administration Building, McDonough) and May 14, 2026 (12-2 p.m. and 5-7 p.m. at GDOT District 3, Area 4 Office, Macon).

“Comments about the proposed project will be accepted until Thursday, May 28, 2026.”

GA DOT , verbatim from source
Published by GA DOT on mailchi.mp . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

About this source

GovPing monitors GA DOT Network for new transportation regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 50 changes logged to date.

What changed

Georgia DOT has opened a public comment period through May 28, 2026 for the Environmental Assessment of the I-75 Commercial Vehicle Lanes project, a Major Mobility Investment Program initiative that proposes two northbound commercial vehicle lanes on I-75 spanning Monroe, Lamar, Spalding, Henry, and Butts counties. The notice announces two in-person Public Hearing Open House events where attendees can review project materials, speak with subject matter experts, and submit formal comments.

Local governments in affected counties, freight operators, trucking companies, and residents along the corridor should review the proposed EA, mitigation measures, and updated concept layouts to provide informed feedback before the May 28 deadline. Comments may be submitted online, by email to 75CVL@dot.ga.gov, by phone at (678) 528-7275, or by mail to Georgia DOT, Attention: Amber Phillips, 600 West Peachtree Street NW, 16th Floor, Atlanta, GA 30308. Printed materials are available at five library locations in the project corridor for 10 days following the last hearing.

Hearing

Date
2026-05-13 at 12:00 – 14:00
Location
Henry County Administration Building, 140 Henry Parkway Connector, McDonough, GA 30253

Archived snapshot

Apr 28, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Campaign URL
- Twitter 0 *tweets*

- RSS

| Please do not reply to NewsReleases@dot.ga.gov. |

| View this email in your browser |

| Butts, Henry, Lamar, Monroe, and Spalding counties... |

| For Immediate Release
Thursday, April 16, 2026 |

| Contact:
mediarequests@dot.ga.gov |

| Proposed I-75 Commercial Vehicle Lanes Project Hosts Public Comment Period and Public Hearing Open House Events
The proposed I-75 Commercial Vehicle Lanes (CVL) project (P.I. No. 0014203) is one of the Major Mobility Investment Program (MMIP) projects advancing across the state to improve mobility and safety for freight operators and passenger vehicles. The project proposes the addition of two, northbound, commercial vehicle lanes along Interstate 75 (I-75) from the I-75/I-475 Interchange in Monroe County ending near the State Route (SR) 20 Interchange in Henry County.

From now through Thursday, May 28, 2026, the public may review and submit feedback on the proposed project’s Environmental Assessment (EA), proposed mitigation measures, and updated concept layouts illustrating features of the Preferred Alternative. To learn more about the proposed project and provide official input, visit: https://tinyurl.com/75CVL-PHOH6

Georgia DOT will also host a series of in-person Public Hearing Open House (PHOH) events during the public comment period at the following locations. The public is invited to attend one of the PHOHs to review project information, speak with project subject matter experts, and provide feedback about the proposed project. There will be no formal presentation.:
- May 13, 2026, 12 p.m. to 2 p.m. and 5 p.m. to 7 p.m. at the Henry County Administration Building, 140 Henry Parkway Connector, McDonough, GA 30253
- May 14, 2026, 12 p.m. to 2 p.m. and 5 p.m. to 7 p.m. at the GDOT District 3, Area 4 Office, 4499 Riverside Drive, Macon, GA, 31210

Materials and displays prepared for the in-person PHOHs are also available on the project website’s virtual meeting room published on the project website: https://tinyurl.com/75CVL-PHOH6

Comments about the proposed project will be accepted until Thursday, May 28, 2026. There are several ways the public can submit comments:
1. Leave a written comment or speak to a court reporter at one of the in-person PHOH events on May 13 and May 14, 2026.
2. Complete the online comment form located on the project website: https://tinyurl.com/75CVL-PHOH6.
3. Email comments to the project email address: 75CVL@dot.ga.gov.
4. Dial the project hotline at (678) 528-7275 to leave a recorded comment (please provide name and contact information).
5. Mail written comments to:
Georgia Department of Transportation
Attention: Amber Phillips, State Environmental Administrator
600 West Peachtree Street, NW – 16th Floor
Atlanta, GA, 30308
Americans with Disabilities Act (ADA) Information: The meeting sites are accessible to persons with disabilities. Accommodations for people with disabilities can be arranged with advance notice by contacting the District Planning and Programming Engineer Harland Smith, at 706-646-7566 or hasmith@dot.ga.gov. In addition to reviewing PHOH displays at the in-person open house events and on the project website, printed versions (including the EA) will be available for 10 days following the last in-person event, at the following locations:
- Georgia DOT District 3, Area 4 Office: 4499 Riverside Drive, Macon, GA 31210
- Henry County Administration Building: 140 Henry Parkway Connector, McDonough, GA 30253
- Flint River Regional Library, 800 Memorial Drive, Griffin, GA, 30223
- Jackson-Butts County Library: 436 E College Street, Jackson, GA 30233
- Milner Community Library: 159 Main Street, Milner, GA 30257
- Monroe County Library: 62 W Main Street, Forsyth, GA 31029

#

The Georgia Department of Transportation plans, constructs and maintains Georgia’s state and federal highways. We’re involved in bridge, waterway, public transit, rail, general aviation, bike and pedestrian programs. And we help local governments maintain their roads. Georgia DOT and its nearly 4,000 employees are committed to delivering a transportation system focused on innovation, safety, sustainability and mobility. The Department’s vision is to boost Georgia’s competitiveness through leadership in transportation. |

| | Follow Us |

| | Like Us |

| | Visit Us |

| | See Us |

| | Watch Us |

| For questions, contact Gina Snider, District Three Communications |

| The information you provide to the Georgia Department of Transportation will be used solely by GDOT. The Department does not sell or offer a subscriber's personal information to third parties for marketing purposes. To no longer receive this e-news letter, please select "unsubscribe from this list" below.

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list |

| Copyright © 2026 Georgia Department of Transportation, All rights reserved.

Georgia Department of Transportation
District Three Office - West Central Georgia
Thomaston, GA 30286 |

Get daily alerts for GA DOT Network

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from GA DOT.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
GA DOT
Published
April 16th, 2026
Comment period closes
May 28th, 2026 (30 days)
Compliance deadline
May 28th, 2026 (30 days)
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Consultation
Change scope
Minor

Who this affects

Applies to
Government agencies Transportation companies
Industry sector
4841 Trucking & Logistics
Activity scope
Highway construction Public infrastructure Environmental review
Geographic scope
US-GA US-GA

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Environmental Protection Government Contracting

Get alerts for this source

We'll email you when GA DOT Network publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!