Changeflow GovPing Transportation I-285/I-20 West Interchange Project Lane Closures
Routine Notice Added Final

I-285/I-20 West Interchange Project Lane Closures

Favicon for www.dot.ga.gov GA DOT Network
Detected
Email

Summary

GA DOT published lane closure information for the I-285/I-20 West Interchange Project covering April 24-26. The traffic impact report provides scheduled lane and ramp closures on the Perimeter West interchange. Road users should plan alternate routes or allow additional travel time during the closure periods.

Published by GA DOT on mailchi.mp . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

About this source

GovPing monitors GA DOT Network for new transportation regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 47 changes logged to date.

What changed

This is a traffic advisory notice from GA DOT listing scheduled lane and ramp closures for the I-285/I-20 West Interchange Project. The document provides closure dates and locations but does not establish new regulatory requirements or compliance obligations.

Affected parties including trucking companies, logistics operators, and general commuters should use this information for travel planning purposes. No compliance deadlines or penalties are associated with this advisory.

Archived snapshot

Apr 27, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Campaign URL
- Twitter 0 *tweets*

- RSS

| View this email in your browser |

| Traffic Impacts Related to The I-285/I-20 West Interchange Project |

| This project will reconstruct and widen several interstate, system-to-system ramps at the I-285/I-20 West Interchange and add a combination of collector-distributor (CD) lanes or connecting lanes and auxiliary lanes along I-20 west and I-285 north of the interchange.

What: Weather permitting, the Georgia Department of Transportation (Georgia DOT) contractors will temporarily close traffic lanes at the areas identified below to perform roadwork activities on the I-285/I-20 West Interchange project. |

| Roadway | Activity | Start Date | End Date | Times |
| I-285 Northbound |
| Cascade Road to Bolton Road | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 9 p.m. – 5 a.m. Nightly |
| Cascade Road to Bolton Road | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 11 p.m. - 5 a.m.
Nightly |
| I-285 Southbound |
| US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. Drive | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 9 p.m. – 5 a.m.
Nightly |
| US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. Drive | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 11 p.m. – 5 a.m.
Nightly |
| SR 280/South Cobb Drive to the I-20 Interchange | Pacing operation, all lanes and shoulders | Monday, April 27 | Thursday, April 30 | 10:30 a.m. - 12 p.m. Daily |
| I-20 Westbound |
| Anderson Avenue underpass to Riverside Parkway | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 9 p.m. – 5 a.m. Nightly |
| Anderson Avenue underpass to Riverside Parkway | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 11 p.m. – 5 a.m. Nightly |
| I-20 Eastbound |
| SR 70/Fulton Industrial Boulevard to the I-285 Interchange | Pacing operation, all lanes and shoulders | Monday, April 27 | Thursday, April 30 | 10:30 a.m. - 12 p.m. Daily |
| Riverside Parkway to the I-285 Interchange | Alternating, single, left-lane, and left-shoulder closure, and single, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 9 p.m. - 5 a.m.
Nightly |
| Riverside Parkway to the I-285 Interchange | Alternating, double, left-lane, and left-shoulder closure, and double, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 11 p.m. - 5 a.m.
Nightly |
| Other Locations |
| SR 70/Fulton Industrial Boulevard SB from Wendell Drive to Shirley Drive | Single, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 8 p.m. - 5 a.m.
Nightly |
| SR 139/MLK Jr. Drive NB from Old Gordon Road to Adamsville Drive | Single, right-lane, and right-shoulder closure | Monday, April 27 | Saturday, May 2 | 8 p.m. - 5 a.m.
Nightly |
| I-285 Northbound to I-20 Westbound |
| Overnight closure and detour (Map)
Motorists traveling on I-285 northbound will continue to US 78/Donald Lee Hollowell Pkwy (Exit 12), turn left, turn on I-285 southbound, and then merge onto I-20 westbound (Exit 10B) | | Wednesday, April 29 | Saturday, May 2 | 9 p.m. until 5 a.m.
Nightly |

| **NOTE: The listed detours will be scheduled so they will not conflict with one another. Closures and detours will be coordinated to ensure proper maintenance of traffic. No more than one ramp in the I-285/I-20 West Interchange will be closed at a time.

Advisory : Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org , or download the Georgia 511 app. |

| |

| |

| |

| The information you provide to the Georgia Department of Transportation will be used solely by Georgia DOT. The Department does not sell or offer a subscriber's personal information to third parties for marketing purposes. To no longer receive this e-newsletter, please select "unsubscribe from this list" below.

If you have any questions or concerns, please feel free to send an email to westinterchange@dot.ga.gov.

Copyright © 2026 Georgia Department of Transportation, All rights reserved.
I-285/I-20 West Interchange Project

Our mailing address is:
Georgia Department of Transportation
600 W Peachtree St NW # 18
Atlanta, GA 30308-3607
Add us to your address book

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list. |

| This email was sent to thenetwork@dot.ga.gov
why did I get this? unsubscribe from this list update subscription preferences
Georgia Department of Transportation · 600 W Peachtree St NW · Atlanta, GA 30308-3607 · USA |

Get daily alerts for GA DOT Network

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from GA DOT.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
GA DOT
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Transportation companies Government agencies Consumers
Industry sector
4841 Trucking & Logistics
Activity scope
Roadway construction Traffic management
Geographic scope
US-GA US-GA

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Public Health Environmental Protection

Get alerts for this source

We'll email you when GA DOT Network publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!