Changeflow GovPing Transportation Interstate 57 Bridge Replacement at Neoga Inter...
Routine Notice Added Final

Interstate 57 Bridge Replacement at Neoga Interchange Begins April 20

Favicon for idot.illinois.gov IL DOT News
Published
Detected
Email

Summary

IL DOT announces a $54.6 million bridge reconstruction project at the I-57 Neoga interchange in Cumberland County, Illinois. The southbound bridge will be reconstructed in 2026 and the northbound bridge in 2027. Traffic crossovers and ramp closures will be implemented during construction, with a detour posted via U.S. 45 and the I-57 Effingham interchange.

Published by IL DOT on illinois-department-of-transportation.prezly.com . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

The Illinois Department of Transportation announced a $54.6 million bridge reconstruction project at the Interstate 57 Neoga interchange in Cumberland County, Illinois. Construction begins April 20, 2026, with the southbound bridge reconstructed in 2026 and the northbound bridge in 2027. A barrier wall will separate lanes on the northbound bridge, with crossovers directing traffic through the work zone.

Motorists should expect lane restrictions, ramp closures at the Neoga interchange, and traffic crossovers. The southbound off- and on-ramps will be closed during construction phases, with a posted detour utilizing U.S. 45 and the I-57 Effingham interchange. Drivers are advised to pay attention to changed conditions, obey posted speed limits, refrain from mobile device use, and be alert for workers and equipment in the work zone.

Archived snapshot

Apr 18, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

District 7, Construction

Interstate 57 bridge replacement at the Neoga interchange begins April 20

Barrier wall to be constructed in northbound lanes

April 17, 2026

EFFINGHAM – The Illinois Department of Transportation announced a bridge reconstruction project at the Interstate 57 Neoga interchange begins Monday, April 20. This $54.6 million project will consist of the southbound bridge being reconstructed in 2026 and the northbound bridge being reconstructed in 2027. ​

A barrier wall will be constructed on the northbound bridge to separate the driving lane and passing lane. When completed, crossovers will be used to divert southbound traffic to the northbound passing lane. Northbound traffic will use the northbound driving lane. Warning signs and lights, barrels, message boards, and arrow boards will be used to direct traffic through the crossover.

Once the crossovers are in use, the southbound off- and on-ramps will be closed at the Neoga interchange. A detour will be posted utilizing U.S. 45 and the I-57 Effingham interchange.

Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 7 updates, follow us on Twitter at @IDOTDistrict7 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

Joe Schatteman

Paul Wappel

IDOT
- Paul.wappel@illinois.gov
- (217) 685-0082

Share

Copy URL

Latest stories

Eastbound I-74 closure in Knox County GALESBURG – The Illinois Department of Transportation announced this evening that eastbound Interstate 74 in Knox County is closed for emergency pavement repairs to the bridge deck over the Spoon River. Traffic is being detoured to U.S. 150. illinois-department-of-transportation.prezly.com Illinois 31 bridge repairs begin April 28 CHICAGO – The Illinois Department of Transportation announced today that repairs to the Illinois 31 (Richmond Road) bridge over Nippersink Creek (between Harts and Solon roads) in Ringwood will begin, weather permitting, Tuesday, April 28. illinois-department-of-transportation.prezly.com State Street resurfacing begins April 20 CHICAGO – The Illinois Department of Transportation announced today that patching and resurfacing of State Street from Steger Road to Sauk Trail in Steger and South Chicago Heights will require intermittent daytime lane closures beginning, weather permitting, Monday, April 20. illinois-department-of-transportation.prezly.com

Get daily alerts for IL DOT News

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from IL DOT.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
IL DOT
Published
April 17th, 2026
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Transportation companies Consumers
Industry sector
9211 Government & Public Administration
Activity scope
Bridge construction Highway maintenance Traffic management
Geographic scope
Illinois US-IL

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Public Health

Get alerts for this source

We'll email you when IL DOT News publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!