Changeflow GovPing Transportation Bridge Replacement Project Continues at Interse...
Routine Notice Added Final

Bridge Replacement Project Continues at Intersection of Routes 522 and 235 in Spring Township, Snyder County

Favicon for www.pa.gov PA DOT Newsroom
Published
Detected
Email

Summary

PA DOT announces the continuation of a bridge replacement project at the intersection of Routes 522 and 235 in Spring Township, Snyder County. Contractor Glenn O. Hawbaker, Inc. will perform shoulder work beginning the week of April 20, requiring single-lane flagging conditions. The $4.8 million project includes removal and replacement of two bridges with concrete box culverts, with an anticipated completion date of November 2026.

Published by PA DOT on pa.gov . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

PA DOT issued a news release announcing the continuation of an active bridge replacement project at Routes 522 and 235 in Spring Township, Snyder County. The announcement details traffic restrictions including a 10-foot width restriction on Route 522 and a posted detour for vehicles exceeding 30 feet on Route 235 using Troxelville Road and Route 104.

Affected parties—primarily drivers and transportation companies operating commercial vehicles in the project area—should anticipate delays and plan alternate routes accordingly. Drivers are advised to check 511PA for real-time traffic conditions. The project carries no compliance obligations beyond standard traffic safety measures.

Archived snapshot

Apr 17, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Bridge Replacement Project Continues at Intersection of Routes 522 and 235 in Spring Township, Snyder County

April 16, 2026

Keep up with PennDOT on social media

The week of April 20, the contractor, Glenn O. Hawbaker, Inc., will be performing shoulder work on Route 522 and Route 235 in relation to the construction of the temporary road. Drivers can expect single lane conditions with flagging where work is being performed.

Traffic Restrictions:

  • Route 522: A 10-foot width restriction will be in place on Route 522. A 12-foot width restriction will be in place at a later date.
  • Route 235: A posted detour will be in effect on Route 235 for vehicles in excess of 30 feet long for the duration of the project, using Troxelville Road (Route 4018) and Route 104. Drivers should be alert, slow down, expect delays in travel and drive with caution in the area.

Glenn O. Hawbaker, Inc. is the prime contractor for this $4.8 million bridge replacement project. Work on the project includes removal of the existing bridges and replacement with new concrete box culverts and adding a U-channel between the bridges. Work on the project is anticipated to be completed in November 2026, weather permitting.

Drivers can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects. Subscribe to PennDOT news and find transportation results in Tioga, Bradford, Lycoming, Sullivan, Union, Snyder, Northumberland, Montour, and Columbia counties at www.pa.gov/DOTdistrict3.

Find PennDOT news on X, Facebook, Instagram and LinkedIn.

MEDIA CONTACT: Maggie Baker and Kim Smith at ra-pdd03crc@pa.gov

#

Get daily alerts for PA DOT Newsroom

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from PA DOT.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
PA DOT
Published
April 16th, 2026
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Consumers Transportation companies
Industry sector
9211 Government & Public Administration
Activity scope
Road construction Bridge replacement Traffic management
Geographic scope
Pennsylvania US-PA

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Infrastructure Public Health

Get alerts for this source

We'll email you when PA DOT Newsroom publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!