4.6-Mile I-55 Resurfacing North of Sherman Begins April 20
Summary
The Illinois Department of Transportation announced a 4.6-mile resurfacing project on Interstate 55 from just north of the Sherman interchange to the Logan County line beginning Monday, April 20, 2026. Work includes guardrail replacement, shoulder maintenance and drainage improvements, with lane closures expected but at least two lanes in each direction open during daytime hours. The project is expected to be completed by the end of November.
What changed
IDOT announced a 4.6-mile Interstate 55 resurfacing project beginning April 20, 2026, running from north of the Sherman interchange to the Logan County line. Work includes guardrail replacement, shoulder maintenance and drainage improvements, with at least two lanes open in each direction during daytime hours and one lane open Sunday through Thursday nights from 7 p.m. to 6 a.m.
Motorists should expect delays and consider alternate routes when feasible. Drivers are urged to pay close attention to changed conditions and signs, obey posted speed limits, refrain from mobile devices and be alert for workers and equipment. The project is part of Rebuild Illinois, a $33.2 billion initiative investing in transportation infrastructure statewide.
Archived snapshot
Apr 17, 2026GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.
Interstate 55 resurfacing project north of Sherman begins April 20
April 16, 2026
SPRINGFIELD – The Illinois Department of Transportation announced that a 4.6-mile resurfacing project on Interstate 55 from just north of the Sherman interchange to the Logan County line begins Monday, April 20. Work is expected to be completed by the end of November.
Lane closures are expected, but at least two lanes in each direction will be open except from 7 p.m. to 6 a.m. Sundays through Thursdays, when one lane of traffic in each direction will remain open. Flaggers and barrels will be used to direct traffic through the work zones. Other work includes guardrail replacement, shoulder maintenance and drainage improvements. Benefits of this project include safety improvements and a smoother driving surface.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.
For IDOT District 6 updates, follow us on Twitter at @IDOTDistrict6 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.
Joe Schatteman
Paul Wappel
IDOT
- Paul.wappel@illinois.gov
- (217) 685-0082
Share
Copy URL
Latest stories
Emergency lane closure on Westbound I-80 in Joliet and Rockdale CHICAGO – The Illinois Department of Transportation announced today that the right lane on westbound Interstate 80 at Center Street in Joliet and Rockdale is closed for emergency repairs. illinois-department-of-transportation.prezly.com Resurfacing project on Illinois 32 in Effingham County begins April 22 EFFINGHAM – The Illinois Department of Transportation announced that a $2.8 million patching and resurfacing project on Illinois 32 from the Shelby County/Effingham County line to Illinois 33 begins Wednesday, April 22. The 3.1-mile project is expected to be completed by the end of May. illinois-department-of-transportation.prezly.com Work on U.S. 20 over Galena River begins May 4 GALENA – The Illinois Department of Transportation announced today that weather permitting, construction on the bridge carrying U.S. 20/Illinois 84 across the Galena River will begin Monday, May 4. illinois-department-of-transportation.prezly.com
Related changes
Get daily alerts for IL DOT News
Daily digest delivered to your inbox.
Free. Unsubscribe anytime.
About this page
Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission
Source document text, dates, docket IDs, and authority are extracted directly from IL DOT.
The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.
Classification
Who this affects
Taxonomy
Browse Categories
Get alerts for this source
We'll email you when IL DOT News publishes new changes.
Subscribed!
Optional. Filters your digest to exactly the updates that matter to you.