FERC's New York Regional Office issued correspondence to the New York Power Authority regarding the September 16, 2025 underwater inspection of the Low-Level Inlet Structure at the Blenheim-Gilboa Pumped Storage Project (P-2685). The letter communicates inspection findings and any required follow-up actions to the hydropower facility operator.

What changed

FERC issued a correspondence letter to the New York Power Authority regarding the underwater inspection of the Low-Level Inlet Structure at the Blenheim-Gilboa Pumped Storage Project conducted on September 16, 2025. The letter documents the inspection findings under FERC's hydropower program.

Affected parties including hydropower project operators and energy companies should monitor for any follow-up requirements or remediation requests from FERC related to the inspection findings. Compliance with FERC safety and operational inspection requirements is essential for maintaining project licensure.

What to do next

  1. Review FERC inspection letter for required follow-up actions
  2. Respond to any deficiencies identified in the underwater inspection
  3. Maintain documentation of compliance with inspection requirements

Archived snapshot

Apr 9, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Document Info for Accession Number: 20260409-3031

Details Document: 04/09/2026
Filed: 04/09/2026
Posted: 04/09/2026 11:13:06 AM
First Received Date: 04/09/2026 10:47:17 AM
Security Level: Public
Official: Yes
E-filing: No
Non-decisional: No
Category: Issuance
Library: Hydro
Aperture: 0
File Type:
Description* :** Letter to New York Power Authority regarding the 09/16/2025 Underwater Inspection of the Low-Level Inlet Structure at the Blenheim-Gilboa Pumped Storage Project under P-2685.
File List

| Docket | Sub-Docket | Type |
| --- | --- | --- |
| P-2685 | 000 | On Document |

| Document Class | Document Type |
| --- | --- |
| FERC Correspondence With Applicant | General Correspondence |
| Order/Opinion | Delegated Order |

| Correspondent | Last Name | First Name | MI | Role/Org |
| --- | --- | --- | --- | --- |
| RECIPIENT | Knowlton | R | | NEW YORK POWER AUTHORITY |
| AUTHOR | SPAIN | J | | NEW YORK REGIONAL OFFICE |

Get daily alerts for FERC eLibrary: Hydropower Orders

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from FERC.

What's AI-generated?

The plain-English summary, classification, and "what to do next" steps are AI-generated from the original text. Cite the source document, not the AI analysis.

Last updated

Classification

Agency
FERC
Published
April 9th, 2026
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor
Document ID
P-2685
Docket
P-2685

Who this affects

Applies to
Energy companies Government agencies
Industry sector
2210 Electric Utilities
Activity scope
Hydropower project inspection Infrastructure safety review
Geographic scope
New York US-NY

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Environmental Protection Government Contracting

Get alerts for this source

We'll email you when FERC eLibrary: Hydropower Orders publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.