Changeflow GovPing Government General AR 688 Interconnection Rules Phase 2 Rulemaking...
Priority review Consultation Added Consultation

AR 688 Interconnection Rules Phase 2 Rulemaking Opens

Favicon for www.oregon.gov Oregon PUC Rulemakings
Published
Detected
Email

Summary

The Oregon Public Utility Commission has opened Docket AR 688 to update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules, marking Phase 2 of this rulemaking proceeding. The docket was filed on April 3, 2026, and is currently in the Informal Phase per Staff's April 8, 2026 announcement. Public comments are being accepted on the proposed updates to interconnection and net metering requirements that govern small generator connections to the electric grid.

“In the Matter of Rulemaking to Update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules.”

Published by Oregon PUC on apps.puc.state.or.us . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

About this source

GovPing monitors Oregon PUC Rulemakings for new government general regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 7 changes logged to date.

What changed

The Oregon Public Utility Commission has initiated Docket AR 688, Phase 2, to revise Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules. This represents a continuation of regulatory updates affecting small generator operators, utilities, and distributed energy resource providers in Oregon. Affected parties should monitor this docket for draft rule language and opportunities to submit public comments on proposed interconnection and net metering requirement changes.

Archived snapshot

Apr 28, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

| eDockets |

| Docket Summary |
| ****If sending a message to PUC staff, please note that as of March 29, 2021, all emails end with @puc.oregon.gov (instead of @state.or.us).* |

| | Docket No: AR 688 | Docket Name: INTERCONNECTION RULES - PHASE 2 | Submit Public Comment |

| In the Matter of Rulemaking to Update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules. |

| Filing Date: 4/3/2026 | **** | **** |

| Case Manager: TED DRENNAN | Phone: 503-580-6380 | Email: ted.drennan@puc.oregon.gov |

| Staff Contact: REBECCA FEUERLICHT | Phone: 503-510-0288 | Email: rebecca.feuerlicht@puc.oregon.gov |

| Email Service List (semi-colon delimited) Email Service List (comma delimited) |
| | If you experience problems with the above 'Email Service List' links,
please try one of these: | |
| Service List Popup (semi-colon delimited) Service List Popup
(comma delimited)
|

| ACTIONS | SERVICE LIST | SCHEDULE | Public Comments |

| Sort By Date Sort By Type |
| Date: | 4/8/2026 | Action: OTHER FILING/PLEADING | |
| | Description
Informal Phase: Staff's Docket Announcement. Filed by Ted Drennan.

Copies served to AR 683, AR 688, UM 2111, AdminRule Electric, and Electric Service Lists. |
| Date: | 4/3/2026 | Action: INITIAL (APPLICATION, COMPLAINT, PETITION) | |
| | Description
In the Matter of Rulemaking to Update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules. | Docket No: AR 688 | Docket Name: INTERCONNECTION RULES - PHASE 2 | Submit Public Comment | In the Matter of Rulemaking to Update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules. | Filing Date: 4/3/2026 | **** | **** | Case Manager: TED DRENNAN | Phone: 503-580-6380 | Email: ted.drennan@puc.oregon.gov | Staff Contact: REBECCA FEUERLICHT | Phone: 503-510-0288 | Email: rebecca.feuerlicht@puc.oregon.gov | | Email Service List (semi-colon delimited) Email Service List (comma delimited) | If you experience problems with the above 'Email Service List' links,
please try one of these: | Service List Popup (semi-colon delimited) Service List Popup
(comma delimited)
| ACTIONS | SERVICE LIST | SCHEDULE | Public Comments | Sort By Date Sort By Type | Date: | 4/8/2026 | Action: OTHER FILING/PLEADING | | | Description
Informal Phase: Staff's Docket Announcement. Filed by Ted Drennan.

Copies served to AR 683, AR 688, UM 2111, AdminRule Electric, and Electric Service Lists. | Date: | 4/3/2026 | Action: INITIAL (APPLICATION, COMPLAINT, PETITION) | Description
In the Matter of Rulemaking to Update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules. |
| Docket No: AR 688 | Docket Name: INTERCONNECTION RULES - PHASE 2 | Submit Public Comment |

| Filing Date: 4/3/2026 | **** | **** |

please try one of these: |
(comma delimited)](https://apps.puc.state.or.us/edockets/docket_service_list.asp?DocketId=25008&Names=2) |

| | Description
Informal Phase: Staff's Docket Announcement. Filed by Ted Drennan.

Copies served to AR 683, AR 688, UM 2111, AdminRule Electric, and Electric Service Lists. |
| Date: | 4/3/2026 | Action: INITIAL (APPLICATION, COMPLAINT, PETITION) |
| | Description
In the Matter of Rulemaking to Update Division 82 Small Generator Interconnection Rules and Division 39 Net Metering Rules. |

| | New Search |

Get daily alerts for Oregon PUC Rulemakings

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from Oregon PUC.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
Oregon PUC
Published
April 3rd, 2026
Instrument
Consultation
Branch
Executive
Legal weight
Non-binding
Stage
Consultation
Change scope
Substantive
Docket
AR 688

Who this affects

Applies to
Energy companies Government agencies
Industry sector
2210 Electric Utilities
Activity scope
Small generator interconnection Net metering Distributed energy resources
Geographic scope
US-OR US-OR

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Public Utilities Consumer Finance

Get alerts for this source

We'll email you when Oregon PUC Rulemakings publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!