Changeflow GovPing Environmental & Energy Deep Drilling Screening Directions 2026 - Multi...
Routine Rule Added Final

Deep Drilling Screening Directions 2026 - Multiple Offshore Well Decisions

Favicon for www.gov.uk UK OPRED
Published
Detected
Email

Summary

OPRED issued multiple deep drilling screening direction decisions for UK offshore petroleum operations. Decisions were published for SHEARWATER (Adura Operations Limited), MUNGO (BP Exploration Operating Company Limited), MAGNUS (Enquest Heather Limited), PENGUIN WEST (Adura Operations Limited), CYGNUS (Ithaca (NE) E&P Limited), and CLAIR-RIDGE (BP Exploration Operating Company Limited). These environmental screening decisions authorise drilling producer wells at various North Sea locations. Decision references include DR/2626/0, DR/2647/0, DR/2643/0, DR/2641/0, DR/2634/0, and DR/2642/0.

What changed

OPRED published six screening direction decisions authorising deep drilling operations at various UK North Sea offshore locations. Each decision applies to a specific operator and well location, including SHEARWATER well 22/30b-A20 (Adura Operations Limited), MUNGO well 22/20-A20Z (BP Exploration), MAGNUS well 211/12a-M47 (Enquest Heather Limited), PENGUIN WEST well 211/13a-Adelie (Adura Operations Limited), CYGNUS well 44/12a-AAH (Ithaca (NE) E&P Limited), and CLAIR-RIDGE well 206/08a-S4U3P2 (BP Exploration). These environmental screening decisions are binding on the named operators and must be complied with throughout the drilling operations.

Operators of UK offshore petroleum drilling operations must ensure their activities conform to the conditions specified in their respective screening direction decisions. The decisions are numbered and dated, with dates ranging from 30 March 2026 to 10 April 2026. Operators should maintain records demonstrating compliance with the environmental screening requirements and be prepared for OPRED oversight and potential audit.

What to do next

  1. Ensure compliance with screening direction conditions for approved drilling operations
  2. Maintain documentation for environmental compliance audit purposes
  3. Contact OPRED for accessible format requirements if needed

Archived snapshot

Apr 16, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Decision

Deep Drilling Screening Directions – 2026

Screening Directions

From: Offshore Petroleum Regulator for Environment and Decommissioning Published 14 January 2026 Last updated 10 April 2026
See all updates Get emails about this page

Documents

SHEARWATER, PRODUCER WELL 22/30b-A20, Adura Operations Limited - DR/2626/0 - Decision Date 10/04/2026

PDF, 113 KB, 11 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


MUNGO, Noble Innovator DRILLING PRODUCER WELL 22/20-A20Z - BP Exploration Operating Company Limited - DR/2647/0 - Decision date 07/04/2026

PDF, 116 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M47 - Enquest Heather Limited - DR/2643/0 - Decision date 02/04/2026

PDF, 115 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


PENGUIN WEST, 211/13a- Adelie (R02) - Adura Operations Limited - DR/2641/0 - Decision date 02/04/2026

PDF, 115 KB, 11 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


Cygnus drilling 44/12a-AAH well - Ithaca (NE) E&P Limited - DR/2634/0 - Decision date 01/04/2026

PDF, 115 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a- S4U3P2 planned well - BP Exploration Operating Company Limited - DR/2642/0 - Decision date 30/03/2026

PDF, 1000 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


HAMILTON NORTH, DRILLING C110/13a-NC - Liverpool Bay CCS Limited - DR/2623/0 - Decision Date 25/03/2026

PDF, 126 KB, 16 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING INJECTOR WELL206/08a- S4U3I1 planned well - BP Exploration Operating Company Limited - DR/2566/2 - Decision Date 25/03/2026

PDF, 115 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


HAMILTON A PLATFORM - INJECTOR WELL 110/13-H4 - Liverpool Bay CCS Limited - DR/2604/0 - Decision Date 24/03/2026

PDF, 126 KB, 16 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


ROSEBANK, Deepsea Atlantic DRILLING WELL 213/27a-DDP31 development well - Adura Operations Limited - DR/2633/0 - Decision Date 23/03/2026

PDF, 125 KB, 15 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


ROSEBANK, Deepsea Atlantic DRILLING WELL 213/27a-CCP22 development well - Adura Operations Limited - DR/2632/0 - Decision Date 23/03/2026

PDF, 125 KB, 15 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


ROSEBANK, Deepsea Atlantic DRILLING WELL 213/27a-D213/27a-DP1 development well - Adura Operations Limited - DR/2615/0 - Decision Date 23/03/2026

PDF, 125 KB, 15 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CLAIR RIDGE, Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a- S1U3P1 planned well - BP Exploration Operating Company Limited - DR/2563/3 - Decision Date 20/03/2026

PDF, 116 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


HOTON, Hoton Platform, DRILLING PRODUCER WELL 48/07b- Perenco planned well - Perenco UK Limited - DR/2638/0 - Decision Date 20/03/2026

PDF, 997 KB, 11 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CAPTAIN, Captain WPP'A', DRILLING PRODUCER WELL 13/22a-C10Y - Ithaca Energy (UK) Limited - DR/2586/1 - Decision Date 20/03/2026

PDF, 1000 KB, 13 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


PENGUIN WEST, DRILLING PRODUCER WELL 211/13a- PAC (A06) - Adura Operations Limited - DR/2636/0 - Decision date 18/03/2026

PDF, 114 KB, 11 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


Hamilton A Platform - INJECTOR WELL 110/13-H2 - Liverpool Bay CCS Limited - DR/2605/0 - Decision Date 17/03/2026

PDF, 126 KB, 16 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


JACKDAW - WELL 30/02a-A3Z (JD03s) - Adura Operations Limited - DR/2603/1 - Decision Date 13/03/2026

PDF, 114 KB, 11 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


MARINER - Mariner PDQ Platform - DRILLING PRODUCER WELL 9/11a-AMPB - Adura Operations Limited - DR/2625/0 - Decision Date 13/03/2026

PDF, 113 KB, 14 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


SCOTT, Scott JD Platform, DRILLING PRODUCER WELL 15/22-ST04 planned well - Cnooc Petroleum Europe Limited - DR/2524/2 - Decision Date 09/03/2026

PDF, 117 KB, 13 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-ALPB planned well - Adura Operations Limited - DR/2612/1 - Decision Date 05/03/2026

PDF, 111 KB, 14 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


NEP Expansion – Phase 3, Noble Intrepid DRILLING EXPLORATION WELL C43/30- BC39 planned well - Net Zero North Sea Storage Limited - DR/2630/0 - Decision Date 04/03/2026

PDF, 119 KB, 14 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


HAMILTON - INJECTOR WELL 110/13-H3 - Liverpool Bay CCS Limited - DR/2598/1 - Decision Date 27/02/2026

PDF, 126 KB, 16 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CYGNUS FIELD - 44/12A SLOT 1 PLANNED WELL - Ithaca (NE) E&P Limited - DR/2628/0 - Decision Date - 26/02/2026

PDF, 118 KB, 13 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


PIPER B FIELD - DRILLING PLATFORM PRODUCER WELL 15/17/T (from Donor well 15/17-B12) - NEO Energy Resources UK Limited - DR/2620/0 - Decision Date 11/02/2026

PDF, 110 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CYGNUS, WELL 44/12a- AAJ planned well - Ithaca (NE) E&P Limited - DR/2528/4 - Decision Date 23/01/2026

PDF, 122 KB, 15 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


PENGUIN WEST, PAN NW WELL 211/13a- 21 sidetrack - Adura Operations Limited - DR/2624/0 - Decision Date 22/01/2026

PDF, 116 KB, 12 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


CYGNUS, 44/12a-AAF planned well (renamed 44/12a-A7Z) - Ithaca (NE) E&P Limited - DR/2500/8 - Decision date 13/01/2026

PDF, 141 KB, 17 pages

This file may not be suitable for users of assistive technology.

Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.


Details

Deep Drilling Screening Directions – 2026

Updates to this page

Published 14 January 2026 Last updated 10 April 2026 show all updates
1.
10 April 2026

DR/2626/0 added
2.
8 April 2026

DR/2647/0 Added
3.
2 April 2026

DR/2643/0 uploaded
4.
2 April 2026

DR/2641/0 uploaded
5.
1 April 2026

DR/2634/0 uploaded
6.
31 March 2026

uploaded DR/2642
7.
25 March 2026

DR/2623/0 and DR/2566/2 added
8.
24 March 2026

DR/2604/0 added
9.
23 March 2026

DR/2615/0, DR/2632/0, and DR/2633/0 added
10.
23 March 2026

DR/2563/3 Updated
11.
20 March 2026

New Deep Drilling Screening Direction Added
12.
18 March 2026

DR/2636/0 uploaded
13.
18 March 2026

New Deep Drilling Screening Direction added
14.
13 March 2026

DR-2625-0 and DR-603-1 Added
15.
9 March 2026

DR/2524/2 - uploaded
16.
5 March 2026

New Deep Drilling Screening directions added.
17.
27 February 2026

DR-2628-0 and DR-2598-1 - Permits Added
18.
12 February 2026

DR/2620/0 - uploaded
19.
23 January 2026

New Deep Drilling Screening direction added.
20.
23 January 2026

Addition of new Deep Drilling Screening Direction.
21.
14 January 2026

First published.

Sign up for emails or print this page

Get emails about this page Print this page

Get daily alerts for UK OPRED

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from OPRED.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
OPRED
Published
April 10th, 2026
Instrument
Rule
Legal weight
Binding
Stage
Final
Change scope
Substantive
Document ID
DR/2626/0; DR/2647/0; DR/2643/0; DR/2641/0; DR/2634/0; DR/2642/0

Who this affects

Applies to
Energy companies
Industry sector
2111 Oil & Gas Extraction
Activity scope
Offshore drilling operations Environmental screening compliance Oil and gas well production
Geographic scope
United Kingdom GB

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Environmental Protection

Get alerts for this source

We'll email you when UK OPRED publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!