Changeflow GovPing Environmental & Energy Oil & Gas Offshore Decommissioning Guidance, UKCS
Priority review Guidance Added Final

Oil & Gas Offshore Decommissioning Guidance, UKCS

Favicon for www.gov.uk UK OPRED
Published
Detected
Email

Summary

OPRED published guidance on decommissioning offshore oil and gas installations and pipelines on the UK Continental Shelf under the Petroleum Act 1998. Operators must submit decommissioning programmes identifying all equipment, infrastructure, and materials, along with proposed decommissioning solutions for each item. OPRED invites public comments on programmes and has published financial assurance guidance outlining how it assesses operators' financial capability to carry out decommissioning.

What changed

The guidance establishes requirements for owners of offshore oil and gas installations and pipelines to decommission infrastructure at the end of a field's economic life under the Petroleum Act 1998. OPRED has incorporated final Environmental Considerations guidance (Section 12) into the November 2018 Decommissioning Guidance Notes and published Financial Assurance Guidance explaining how the government assesses financial health of operators with interests in offshore fields.

Energy companies with UK Continental Shelf interests must comply with decommissioning programme requirements, including public consultation processes. Operators should review the financial assurance policy to understand how OPRED assesses capability and may exercise statutory powers under the Petroleum Act. Contact OPRED at odu@energysecurity.gov.uk with questions on compliance obligations.

What to do next

  1. Develop decommissioning programmes identifying all equipment, infrastructure, and materials
  2. Submit programmes for public consultation per OPRED requirements
  3. Demonstrate financial capability to fund decommissioning under OPRED financial assurance policy

Archived snapshot

Apr 16, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Guidance

Oil & Gas: decommissioning of offshore installations & pipelines

Decommissioning programmes, including dates, locations, installations decommissioned, method of decommissioning and close-out reports where available.

From: Offshore Petroleum Regulator for Environment and Decommissioning Published 23 January 2013 Last updated 13 April 2026
See all updates Get emails about this page Print this page

Overview

The decommissioning of offshore oil and gas installations and pipelines on the United Kingdom Continental Shelf (UKCS) is controlled through the Petroleum Act 1998.

The responsibility for ensuring that the requirements of the Petroleum Act 1998 are complied with rests with the Offshore Petroleum Regulator for Environment and Decommissioning (OPRED) which sits within the Department for Business, Energy and Industrial Strategy.

Owners of oil and gas installations and pipelines are required to decommission their offshore infrastructure at the end of a field’s economic life and the 1998 Act requires owners to set out the measures to decommission disused installations and/or pipelines in a decommissioning programme.

A decommissioning programme must identify all the items of equipment, infrastructure and materials that have been installed or drilled and describe the decommissioning solution for each.

OPRED aims to be transparent in its consideration of decommissioning programmes. As a result members of the public, other organisations, non-governmental organisations and other government departments or agencies are invited to comment on the proposals set out in a programme.

Details of the current programmes under consideration are noted in the table below.

OPRED provides guidance on the regulatory requirements for decommissioning. Final guidance on the Environmental Considerations for Decommissioning (Section 12) has now been incorporated into the guidance notes Offshore Oil and Gas Decommissioning Guidance Notes November 2018 (PDF, 1.27 MB, 138 pages). Please see Updates to Offshore Oil and Gas Decommissioning Guidance

Financial Assurance Guidance for the Decommissioning of Offshore Oil and Gas Installations and Pipelines. Financial Assurance Guidance (PDF, 278 KB, 17 pages)

The guidance outlines how the government assesses the financial capability of persons with a relevant interest in or considering taking an interest in an offshore oil or gas field. For the purposes of satisfying the Secretary of State that that person will be capable of carrying out a decommissioning programme in relation to that interest.

It explains our financial assurance policy and existing processes setting out the steps taken to assess the financial health of offshore oil and gas companies with an interest or potential interest in a field, outlining how and when we may use the statutory powers set out in the Petroleum Act 1998.

If you have any comments or questions relevant to the guidance, please email us at odu@energysecurity.gov.uk.

Proposed changes to charging a fee in respect of decommissioning offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 as amended by the Energy Act 2008 and the Energy Act 2023

In 2021 the Government consulted on the proposed change to the method for calculating charges to industry for work undertaken by OPRED in connection to the Secretary of State’s functions under Part IV of the Petroleum Act 1998 (PA 1998). These changes were enabled by amendments to the PA 1998 made by the Energy Act 2023, and require further, secondary legislation (regulations) to bring into force. The aim of this consultation was to formally seek views from stakeholders such as offshore oil and gas operators, companies with an interest in decommissioning offshore oil and gas installations and pipelines, and other interested parties. Fees consultation document - May 2021 (PDF, 224 KB, 19 pages) Offshore oil and gas cost recovery consultation impact assessment (PDF, 247 KB, 11 pages) Response to consultation document - April 2022 (PDF, 189 KB, 12 pages)

As part of the process for making the new legislation OPRED consulted on draft regulations and draft guidance explaining how the new charging regime will work in practice, and also consulted on new hourly rates to calculate the fees recovered from industry. These consultations are now closed, and the government response can be found here: Government Response - Joint Consultation on Decommissioning Charging Regulations and OPRED Fee Rates (PDF, 265 KB, 20 pages)

Copies of the consultation documents can be found here: OPRED Decommissioning Charging Regulations 2026 Consultation Document (PDF, 194 KB, 13 pages) OPRED Fee Rates Consultation 2026 (PDF, 209 KB, 15 pages)

If you have any questions regarding the proposed changes, please direct these to odu@energysecurity.gov.uk.

Draft decommissioning programmes under consideration

Decommissioning Programme Operator Main Points of DP Documents
South Magnus and Magnus Swift Wellheads and Xmas Trees DP EnQuest Heather Limited Xmas Trees and Wellheads to be removed to shore for reuse, recycling or disposal. South Magnus and Magnus Swift DP (PDF, 2.27 MB, 41 pages)
Leman SW 53/02a-15Y WHPS DP Perenco UK Limited WHPS and associated stabilisation material to be removed to shore for reuse, recycling or disposal. Pipeline ends will be cut and recovered to shore for reuse, recycling or disposal alongside associated stabilisation features. Leman SW 53/02a-15Y WHPS DP (PDF, 1.15 MB, 40 pages)
Inde 23AC and AQ Installations, bridges and risers Perenco UK Limited Topsides, Jackets and bridges to be removed to shore for reuse/recycling or disposal. The risers will be removed and returned to shore for recycling. Inde 23AC and AQ Installations, bridges and risers DP (PDF, 1.45 MB, 46 pages) Inde 23AC and AQ Installations, bridges and risers EA (PDF, 5.55 MB, 116 pages)
Miller Infield Pipelines BP Exploration (Alpha) Limited Surface laid concrete coated export pipeline will be trenched and buried; trenched and rock covered gas import pipeline will be decommissioned in situ with surface laid ends removed; Surface laid umbilical will be recovered to shore. Pipeline structures to be recovered to shore for re-use or recycling. Miller Infield Pipelines DP (PDF, 3.51 MB, 38 pages) Miller Infield Pipelines EA (PDF, 7.17 MB, 110 pages) Miller Infield Pipelines CA (PDF, 4.41 MB, 67 pages)
Pelican Subsea Facilities Taqa Bratani Limited Subsea installations, surface laid pipelines, spools and umbilicals and protection/stabilisation materials to be recovered to shore for re-use or recycling. Trenched and buried pipelines to be left in situ Pelican DP (PDF, 1.92 MB, 61 pages) Pelican EA (PDF, 6.15 MB, 163 pages) Pelican CA (PDF, 5.66 MB, 255 pages)
Atlantic and Cromarty Part 1 Shell Global LNG Limited Manifold and WHPS to be removed for recycling/disposal. Surface laid pipelines recovered to shore for recycling/disposal. Trenched and buried pipelines and associated protection/stabilisation features to be left in situ. Atlantic and Cromarty DP (PDF, 2.65 MB, 67 pages) Atlantic and Cromarty EA (PDF, 5.27 MB, 129 pages) Atlantic and Cromarty CA (PDF, 2.98 MB, 67 pages)
Inde 18A Jackets, Bridges and Riser DP Perenco UK Limited Jackets, bridges and riser to be removed to shore for reuse, recycling or disposal Inde 18A Jackets, Bridges and Riser DP (PDF, 1.73 MB, 42 pages) Inde 18A Jackets, Bridges and Riser EA (PDF, 4.68 MB, 108 pages)
Cladhan Subsea Facilities Taqa Bratani Limited Subsea installations, surface laid pipelines and umbilicals to be recovered to shore for re-use or recycling. Buried pipelines to be left in situ. Protection/stabilisation features will be recovered to shore. Cladhan DP (PDF, 1.32 MB, 45 pages) Tern Subsea EA (PDF, 6.79 MB, 196 pages) Tern Subsea CA (PDF, 11.8 MB, 255 pages)
Hudson Subsea Facilities Taqa Bratani Limited Subsea installations, surface laid pipelines and umbilicals to be recovered to shore for re-use or recycling. Buried pipelines to be left in situ. Protection/stabilisation features will be recovered to shore. Hudson DP (PDF, 1.81 MB, 60 pages) Tern Subsea EA (PDF, 6.79 MB, 196 pages) Tern Subsea CA (PDF, 11.8 MB, 255 pages)
Kestrel and Falcon Subsea Facilities Taqa Bratani Limited Subsea installations, surface laid pipelines and umbilicals to be recovered to shore for re-use or recycling. Buried pipelines to be left in situ. Protection/stabilisation features will be recovered to shore. Kestrel_Falcon DP (PDF, 1.41 MB, 52 pages) Tern Subsea EA (PDF, 6.79 MB, 196 pages) Tern Subsea CA (PDF, 11.8 MB, 255 pages)
Tern Upper Jacket TAQA Bratani Limited The Tern Upper Jacket and pipeline risers will be cut to a depth of approximately 132m below lowest astronomical tide and recovered to shore for recycling or disposal. Tern Upper Jacket - DP (PDF, 3.98 MB, 50 pages) Tern Upper Jacket - EA (PDF, 9.17 MB, 99 pages)
North Cormorant Upper Jacket TAQA Bratani Limited The North Cormorant Upper Jacket and pipeline risers will be cut to a depth of approximately 116m below lowest astronomical tide and recovered to shore for recycling or disposal. North Cormorant Upper Jacket - DP (PDF, 3.52 MB, 48 pages) North Cormorant Upper Jacket - EA (PDF, 8.05 MB, 102 pages)
Trees Decommissioning Programmes (Birch, Larch & Sycamore) Spirit Energy North Sea Oil Limited Full removal of all surface laid pipelines,  exposed stabilisation features and Birch and Larch Manifolds and Sycamore wellhead. Trenched and/or buried pipelines, pipelines in open trenches and stabilisation features within trenches and below seabed will be left in situ. Trees DP (PDF, 2.63 MB, 63 pages) Trees EA (PDF, 8.33 MB, 103 pages) Trees CA (PDF, 2.77 MB, 50 pages)
Dunlin Alpha Fairfield Betula Limited Decommissioning in situ of Dunlin Alpha concrete gravity based structure and storage cells. Dunlin Alpha Decommissioning Programme (PDF, 6.5 MB, 77 pages) Dunlin Alpha Decommissioning Comparative Assessment Report (PDF, 3.66 MB, 133 pages) Dunlin Alpha Decommissioning Environmental Appraisal (PDF, 6.58 MB, 176 pages)
Brae Alpha, Brae Bravo, Central Brae, West Brae and Sedgwick Marathon Oil UK LLC Removal of Brae Alpha and Brae Bravo jackets to the top of the footings. Removal of Central Brae, West Brae and Sedgwick subsea installations. Pipelines to be decommissioned in a variety of ways including removal, trenching and leave in situ. Brae Alpha, Brae Bravo, Central Brae, West Brae and Sedgwick Decommissioning Programmes (PDF, 15.3 MB, 120 pages) Brae A etc, Environmental Statement – Main Report (PDF, 14.6 MB, 80 pages) Brae A etc. Environmental Statement - Technical Appendices (PDF, 13.3 MB, 96 pages) Brae A Substructure Comparative Assessment (PDF, 1.7 MB, 30 pages) Brae B Substructure Comparative Assessment (PDF, 1.59 MB, 30 pages) Brae Area Subsea Assets Comparative Assessment (PDF, 6.84 MB, 43 pages)
Brent Shell U.K. Limited Decommissioning in situ of Brent Bravo, Charlie and Delta concrete gravity based structures. Brent Decommissioning Programme (PDF, 12 MB, 322 pages) Brent ES (PDF, 12.5 MB, 475 pages) Brent EIA (PDF, 5.05 MB, 429 pages) Brent ES Appendix (PDF, 2.52 MB, 45 pages) A suite of detailed Technical Documents which support the Decommissioning Programmes documents are available on the Shell Website

Approved decommissioning programmes

Decommissioning Programme and Approval Date Operator at approval Operator following licence / company change Revision Details and Approval Date Close out report and Date Accepted
Leman 27J Jacket and PL207 DP (PDF, 1.97 MB, 49 pages) Leman 27J Jacket and PL207 EA (PDF, 6.51 MB, 117 pages) March 2026 Perenco UK Limited - - -
GPIII FPSO Sailaway and Disconnection of Risers and Pipelines (PDF, 6.2 MB, 60 pages) March 2026 NEO Energy Production UK Limited - - -
Ravenspurn GCD Topside DP (PDF, 2.86 MB, 65 pages) February 2026 Perenco UK Limited - - -
Gannet A Mast DP (PDF, 2.23 MB, 37 pages) February 2026 UK North Sea Limited. DP submitted by Shell U.K. Limited - - -
Ninian Southern Topsides Upper Jacket and Associated Riser Sections DP (PDF, 8.44 MB, 91 pages) February 2026 CNR International (U.K.) Limited - - -
Alba Northern Platform Topsides DP (PDF, 6.92 MB, 59 pages) January 2026 Ithaca Oil and Gas Limited - - -
Tyne Field Pipeline DP (PDF, 4.77 MB, 54 pages) Tyne Field Pipelines CA (PDF, 2.46 MB, 65 pages) Tyne Pipelines EA (PDF, 9.55 MB, 144 pages) December 2025 Perenco UK Limited - - -
Grove G5 WHPS DP (PDF, 2.76 MB, 45 pages) December 2025 Spirit Energy Resources Limited - - -
Pickerill Alpha and Bravo Riser Sections DP (PDF, 1.56 MB, 38 pages) December 2025 Perenco Gas (UK) Limited - - -
Nelson Derrick DP (PDF, 2.54 MB, 40 pages) October 2025 Enterprise Oil Limited Adura Operations Limited - -
Pierce WI Wells DP (PDF, 1.53 MB, 27 pages) October 2025 Enterprise Oil Limited Adura Operations Limited - -
Stella FPF-1, Moorings and Riser Systems DP (PDF, 9.34 MB, 83 pages) Stella FPF-1, Moorings and Riser Systems CA (PDF, 1.74 MB, 26 pages) September 2025 Ithaca Energy (U.K.) Limited - - -
Alba FSU DP (PDF, 5.58 MB, 60 pages) Alba FSU CA (PDF, 1.64 MB, 27 pages) September 2025 Ithaca Oil and Gas Limited - 1. Change of parties to the approved Programme April 2026 -
Trent Topsides and Risers DP (PDF, 1.57 MB, 46 pages) September 2025 Perenco UK Limited - - -
Gannet Subsea Wells GB01 and GF01 - Final DP (PDF, 1.08 MB, 25 pages) September 2025 Shell U.K. Limited Adura Operations Limited - -
Gryphon Alpha FPSO and Riser Disconnection DP (PDF, 5.83 MB, 79 pages) September 2025 TotalEnergies E&P North Sea UK Limited - - -
Amethyst Jackets and Risers DP (PDF, 2.04 MB, 56 pages) Amethyst Jackets and Risers EA (PDF, 6.02 MB, 113 pages) August 2025 Perenco UK Limited - - -
Calder, Dalton & Millom (EIS) DP (PDF, 8.23 MB, 90 pages) EIS CA (PDF, 12 MB, 119 pages) EIS EA (PDF, 9.31 MB, 231 pages) August 2025 Chrysaor Resources (Irish Sea) Limited - - -
Davy North and Davy East Subsea Installations DP (PDF, 2.05 MB, 45 pages) Davy North and Davy East Subsea Installations EA (PDF, 6.62 MB, 109 pages) July 2025 Perenco UK Limited - - -
Thistle Pipelines & SALM Base DP (PDF, 7.87 MB, 67 pages) Combined Thistle & Don Pipelines CA (PDF, 9.03 MB, 123 pages) Combined Thistle & Don Pipelines EA (PDF, 6.76 MB, 152 pages) July 2025 EnQuest Heather Limited - - -
Thistle Upper Jacket and Associated Risers DP (PDF, 4.96 MB, 70 pages) July 2025 EnQuest Heather Limited - - -
Burghley DP (PDF, 1.74 MB, 55 pages) Beauly and Burghley CA (PDF, 3.08 MB, 74 pages) Beauly and Burghley EA (PDF, 20 MB, 99 pages) June 2025 Repsol North Sea Limited NEO Energy North Sea Limited - -
Beauly DP (PDF, 1.85 MB, 49 pages) Beauly and Burghley CA (PDF, 3.08 MB, 74 pages) Beauly and Burghley EA (PDF, 20 MB, 99 pages) June 2025 Repsol North Sea Limited NEO Energy North Sea Limited - -
Galahad DP (PDF, 1.71 MB, 49 pages) Galahad EA (PDF, 3.35 MB, 71 pages) June 2025 Perenco Gas (UK) Limited - - -
Seven Seas WHPS DP (PDF, 1.59 MB, 31 pages) June 2025 Spirit Energy Resources Limited - - -
Don Pipelines in Thistle 500m Safety Zone DP (PDF, 4.09 MB, 45 pages) Final EA (PDF, 6.76 MB, 152 pages) Don Comparative Assessment (PDF, 8.88 MB, 123 pages) May 2025 Britoil Limited - - -
Wingate DP (PDF, 6.27 MB, 59 pages) Wingate EA (PDF, 28.9 MB, 107 pages) Wingate CA (PDF, 4.17 MB, 42 pages) Wingate Pipeline Survey (PDF, 1.33 MB, 10 pages) May 2025 Wintershall Noordzee B.V. - - -
LBA DP (MS Word Document, 6.49 MB) LBA CA (MS Word Document, 4.97 MB) LBA EA (MS Word Document, 18.1 MB) May 2025 Eni UK Limited - - -
Kilmar DP (PDF, 5.35 MB, 54 pages) Kilmar CA (PDF, 5.2 MB, 43 pages) Kilmar EA (PDF, 8.66 MB, 110 pages) May 2025 Energean UK Ltd - 1. Change of parties to the approved Programmes June 2025 -
Garrow DP. (PDF, 6.64 MB, 53 pages) Garrow CA. (PDF, 3.35 MB, 36 pages) Garrow EA. (PDF, 8.07 MB, 105 pages) April 2025 Energean UK Ltd - 1. Change of parties to the approved Programmes May 2025 -
Eider DP (PDF, 5.29 MB, 52 pages) Eider EA (PDF, 8.17 MB, 99 pages) March 2025 TAQA Bratani Limited - - -
Solan DP (PDF, 8.36 MB, 87 pages) Solan CA (PDF, 6.19 MB, 65 pages) Solan EA (PDF, 6.97 MB, 133 pages) March 2025 Premier Oil UK Limited - - -
Otter Hatches DP (PDF, 2.07 MB, 38 pages) January 2025 TAQA Bratani Limited - - Otter Hatches COR (PDF, 2.15 MB, 30 pages) October 2025
Guinevere Pipelines DP (PDF, 3.72 MB, 47 pages) Guinevere Pipelines EA (PDF, 4.3 MB, 103 pages) Guinevere Pipelines CA (PDF, 2.71 MB, 63 pages) October 2024 Perenco Gas (UK) Limited - - Guinevere Close Out Report (PDF, 1.96 MB, 45 pages) November 2025
Durango DP (PDF, 1.35 MB, 38 pages) Durango EA (PDF, 3.77 MB, 82 pages) September 2024 Perenco North Sea Limited - - -
East Brae Upper Jacket (PDF, 1.96 MB, 50 pages) July 2024 TAQA Bratani Limited - 1. Change of parties to the approved Programmes October 2024 -
Knarr Gas Pipeline (KGP) Final DP (PDF, 2.49 MB, 56 pages) Knarr Gas Pipeline (KGP) Final CA (PDF, 1.83 MB, 48 pages) Knarr Gas Pipeline (KGP) Final EA (PDF, 3.12 MB, 74 pages) May 2024 Gassco AS - - Knarr Gas Pipeline Close Out Report (PDF, 877 KB, 12 pages) July 2025
Rochelle WHPS and Jumper DPs (PDF, 2.87 MB, 41 pages) May 2024 CNOOC Petroleum Europe Limited - - -
Leman 27H + 27J Topsides DP (PDF, 3.36 MB, 80 pages) April 2024 Perenco UK Limited - - -

| Trees Protection Cages (Birch, Larch and Sycamore) DP (PDF, 2.59 MB, 38 pages) February 2024 | Spirit Energy North Sea Oil Limited | - | - | - | |
| Leman F & G DP (PDF, 9.92 MB, 86 pages) Leman F & G CA (PDF, 9.5 MB, 63 pages) Leman F & G EA (PDF, 15.1 MB, 165 pages) January 2024 | Shell U.K. Limited | - | - | - | |
| Helvellyn CA (PDF, 9.84 MB, 46 pages) Helvellyn EA (PDF, 7.37 MB, 101 pages) Helvellyn DP (PDF, 4.75 MB, 44 pages) January 2024 | Waldorf Petroleum Resources Limited | - | - | - | |
| Western Isles Subsea Final DP (PDF, 9.34 MB, 75 pages) Western Isles Subsea EA Final (PDF, 7.1 MB, 141 pages) Western Isles Subsea CA Final (PDF, 5.49 MB, 74 pages) October 2023 | Dana Petroleum (E&P) Limited | - | 1. Change of parties to the approved Programme September 2024 | - | |
| Devenick (PDF, 2.24 MB, 54 pages) Devenick CA (PDF, 2.02 MB, 58 pages) Devenick EA (PDF, 6.14 MB, 127 pages) October 2023 | Taqa Bratani Limited | - | - | - | |
| Western Isles FPSO DP (PDF, 5.78 MB, 65 pages) September 2023 | Dana Petroleum (E&P) Limited | - | 1. Change of parties to the approved Programme September 2024 | - | |
| Heather Pipelines DP (PDF, 4.22 MB, 56 pages) Heather Pipelines CA (PDF, 5.35 MB, 72 pages) Heather Pipelines EA (PDF, 6.78 MB, 117 pages) September 2023 | EnQuest Heather Limited | - | - | - | |
| Brent PLU6294 DP (PDF, 1.08 MB, 37 pages) September 2023 | Shell U.K. Limited | - | - | - | |
| Chestnut Phase 2 DP (PDF, 5.6 MB, 57 pages) Chestnut Phase 2 EA (PDF, 7.97 MB, 104 pages) Chestnut Phase 2 CA (PDF, 4.42 MB, 67 pages) June 2023 | Spirit Energy North Sea Oil Limited | - | - | - | |
| Heather Upper Jacket DP (PDF, 3.24 MB, 41 pages) March 2023 | EnQuest Heather Limited | - | - | - | |
| Saltire A Topsides and Saltire Area Subsea Infrastructure DPs (PDF, 7.37 MB, 69 pages) Saltire EA (PDF, 7.09 MB, 109 pages) Saltire CA (PDF, 4.61 MB, 111 pages) December 2022 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | - | - | |
| Causeway & Fionn DP (PDF, 4.56 MB, 64 pages) Causeway & Fionn EA (PDF, 6.78 MB, 94 pages) Causeway & Fionn CA (PDF, 2.03 MB, 41 pages) December 2022 | Ithaca Energy (UK) Limited | - | - | - | |
| Johnston DP (PDF, 2.18 MB, 43 pages) Johnston EA (PDF, 5.25 MB, 121 pages) Johnston CA (PDF, 1.64 MB, 62 pages) December 2022 | Premier Oil E&P UK EU Limited | - | - | - | |
| Duart DP (PDF, 11.2 MB, 55 pages) Tartan Subsea EA (PDF, 36.4 MB, 137 pages) Tartan Subsea CA (PDF, 5.5 MB, 135 pages) November 2022 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | - | - | |
| Tartan N Terrace (TNT) & Tartan Satellite (TS) Subsea DPs (PDF, 4.07 MB, 72 pages) Tartan Subsea EA (PDF, 36.4 MB, 137 pages) Tartan Subsea CA (PDF, 5.5 MB, 135 pages) November 2022 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | - | - | |
| Tartan Topsides DP (PDF, 8.28 MB, 46 pages) Tartan Subsea EA (PDF, 36.4 MB, 137 pages) November 2022 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | - | - | |
| Lancaster Field Floating Production Storage and Offloading Vessel (FPSO) Decommissioning Programme (PDF, 2.51 MB, 37 pages) November 2022 | Hurricane Energy PLC | - | - | - | |
| Hewett Area Subsea Installations DP (PDF, 4.45 MB, 54 pages) Hewett Area Subsea Installations EA (PDF, 14.8 MB, 150 pages) November 2022 | Eni UK Limited | - | 1. Include mattresses and grout bags into the DP  February 2025 | - | |
| Scoter and Merganser DP (PDF, 4.63 MB, 92 pages) Scoter and Merganser CA (PDF, 1.94 MB, 47 pages) Scoter and Merganser EA (PDF, 6.4 MB, 130 pages) September 2022 | Shell UK Limited | - | - | - | |
| Sean DP (PDF, 5.05 MB, 64 pages) Sean CA (PDF, 2.8 MB, 110 pages) Sean EA (PDF, 9.44 MB, 171 pages) August 2022 | ONE-Dyas UK Limited | - | - | - | |
| Caister CDP1b (PDF, 5.96 MB, 56 pages) CMS Area EA (PDF, 10.4 MB, 171 pages) CMS Area CA (PDF, 13.5 MB, 145 pages) July 2022 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Caister-Murdoch System CDP2 (PDF, 15.7 MB, 131 pages) CMS Area EA (PDF, 10.4 MB, 171 pages) CMS Area CA (PDF, 13.5 MB, 145 pages) July 2022 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Murdoch CDP3 (PDF, 8.53 MB, 83 pages) CMS Area EA (PDF, 10.4 MB, 171 pages) CMS Area CA (PDF, 13.5 MB, 145 pages) July 2022 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Brae Bravo Upper Jacket Decommissioning Programme (PDF, 1.76 MB, 41 pages) June 2022 | TAQA Bratani Limited | - | - | - | |
| LOGGS Saturn Satellites LDP2 (PDF, 20 MB, 90 pages) LOGGS LDP2 - LDP5 Comparative Assessment (PDF, 3.21 MB, 203 pages) LOGGS LDP2 - LDP5 EA (PDF, 7.5 MB, 181 pages) June 2022 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Foinaven FPSO Offstation DP (PDF, 3.76 MB, 60 pages) May 2022 | Britoil Limited | - | - | - | |
| LOGGS V-Fields LDP4 (PDF, 20.8 MB, 83 pages) LOGGS LDP2 - LDP5 Comparative Assessment (PDF, 3.21 MB, 203 pages) LOGGS LDP2 - LDP5 EA (PDF, 7.5 MB, 181 pages) April 2022 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Hummingbird Spirit FPSO Sail away and Chestnut Riser Disconnection (PDF, 2.96 MB, 47 pages) March 2022 | Spirit Energy North Sea Oil Limited | - | - | Hummingbird Spirit FPSO and Riser Disconnect Close Out Report (PDF, 4.25 MB, 39 pages) July 2025 | |
| Victoria DP (PDF, 2.54 MB, 42 pages) Victoria CA (PDF, 1.81 MB, 48 pages) Victoria EA (PDF, 18.4 MB, 158 pages) April 2022 | NEO Energy (SNS) Limited | - | - | - | |
| Wenlock DP (PDF, 4.72 MB, 51 pages) Wenlock CA (PDF, 3.84 MB, 44 pages) Wenlock EA (PDF, 6.74 MB, 119 pages) February 2022 | Alpha Petroleum Resources Limited | Energean UK Ltd | - | - | |
| Cormorant Alpha Topsides DP (PDF, 3.91 MB, 81 pages) Cormorant Alpha Topsides EA (PDF, 8.21 MB, 117 pages) February 2022 | TAQA Bratani Limited | - | - | - | |
| Caledonia Decommissioning Programme (PDF, 3.1 MB, 50 pages) Caledonia Comparative Assessment (PDF, 2.04 MB, 64 pages) Caledonia Environmental Assessment (PDF, 5.56 MB, 113 pages) February 2022 | Premier Oil UK Limited | - | - | - | |
| Thistle Topsides Decommissioning Programme (PDF, 3.11 MB, 38 pages) December 2021 | EnQuest Heather Limited | - | - | - | |
| Indefatigable 18A Topsides DP (PDF, 1.29 MB, 50 pages) December 2021 | Perenco UK Limited | - | 1. Schedule extension to 31/12/2030 March 2026 | - | |
| Banff and Kyle Decommissioning Programmes (PDF, 3.23 MB, 71 pages) Banff and Kyle Environmental Appraisal (PDF, 7.07 MB, 114 pages) Banff and Kyle Comparative Assessment (PDF, 2.75 MB, 106 pages) November 2021 | CNR International (U.K.) Limited | - | - | - | |

| Ensign installation DP (PDF, 2.52 MB, 37 pages) Ensign Pipelines DP (PDF, 1.99 MB, 42 pages) Ensign CA (PDF, 1.67 MB, 48 pages) Ensign EA (PDF, 9.45 MB, 134 pages) August 2021 | Spirit Energy North Sea Limited | - | - | - | |
| Conrie, Don SW, W Don and Ythan Decommissioning Programmes (PDF, 7.29 MB, 88 pages) Don SW and W Don Comparative Assessment (PDF, 5.33 MB, 76 pages) Conrie, Don SW, W Don and Ythan Environmental Appraisal (PDF, 8.07 MB, 132 pages) August 2021 | EnQuest Heather Limited | - | 1/ PLU2580JDG added to DP with decommissioning solution of full removal. January 2026 | - | |
| Fulmar and Auk North Topsides, Subsea Facilities and Pipelines Decommissioning Programme (PDF, 3.83 MB, 78 pages) Fulmar and Auk North Subsea Infrastructure and Pipelines Comparative Assessment (PDF, 4.63 MB, 144 pages) Fulmar & Auk North Environmental Appraisal (PDF, 5.17 MB, 114 pages) July 2021 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | - | - | |
| Heather Topsides Decommissioning Programme (PDF, 4.07 MB, 43 pages) July 2021 | EnQuest Heather Limited | - | - | - | |
| Kingfisher Decommissioning Programme (PDF, 2.95 MB, 76 pages) Kingfisher CA (PDF, 2.19 MB, 51 pages) Kingfisher EA (PDF, 3.48 MB, 119 pages) June 2021 | Shell U.K. Limited | - | 1. Change of parties to the approved Programme August 2021 2. Schedule Extension to 31/12/2027 and further change to parties to the approved Programme February 2025 | - | |
| Gaupe DP (PDF, 1.86 MB, 47 pages) Gaupe CA (PDF, 1.32 MB, 51 pages) Gaupe EA (PDF, 5.77 MB, 113 pages) May 2021 | A/S Norske Shell | - | 1. Change of parties to the approved decommissioning programme. 2. Change of decommissioning solution for PLU 2784 and PLU 2785 from leave in situ to full removal due to insufficient depth of cover. December 2024 | - | |
| PL301 Heimdal to Brae Pipeline Decommissioning Programme (PDF, 7.71 MB, 53 pages) PL301 Heimdal to Brae Pipeline Comparative Assessment (PDF, 6.77 MB, 55 pages) PL301 Heimdal to Brae Environmental Appraisal (PDF, 9.64 MB, 114 pages) April 2021 | Equinor Energy AS | - | 1. Extend the scope of the DP to include the entire length of PL301 situated within the UKCS. Extend the schedule to 31/12/2029. April 2022 | - | |
| Hunter & Rita Decommissioning Programme (PDF, 2.1 MB, 44 pages) Hunter & Rita CA (PDF, 1.99 MB, 79 pages) Hunter & Rita EA (PDF, 4.96 MB, 131 pages) April 2021 | Premier Oil E&P UK Limited | - | - | - | |
| LOGGS PR, LOGGS PC, LOGGS PP, LOGGS PA, North Valiant PD, & Associated Pipelines – LDP5 (PDF, 12.2 MB, 99 pages) | Chrysaor Production (U.K.) Limited April 2021 | - | - | - | |
| Windermere DP (PDF, 1.95 MB, 41 pages) Windermere CA (PDF, 802 KB, 34 pages) Windermere ES (PDF, 7.86 MB, 231 pages) March 2021 | INEOS UK SNS Limited | - | 1. Schedule Extension to 31/12/2025 & Change to decom solution for covering pipeline ends to use rock rather than backfill January 2024 | - | |
| Hewett Installation DP (PDF, 5.76 MB, 69 pages) Hewett EA (PDF, 16.9 MB, 134 pages) March 2021 | ENI Hewett Limited | - | - | | |
| Buchan & Hannay Decommissioning Programme (PDF, 3.33 MB, 57 pages) Buchan & Hannay CA (PDF, 3.83 MB, 91 pages) Buchan & Hannay EA (PDF, 8.29 MB, 115 pages) March 2021 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | - | - | |
| Huntington Decommissioning Programme (PDF, 2.52 MB, 41 pages) Huntington CA (PDF, 1.86 MB, 62 pages) Huntington EA (PDF, 5.01 MB, 127 pages) March 2021 | Premier Oil E&P UK Limited | - | - | - | |
| Northern Producer FPF and Don SW + W Don riser disconnection (PDF, 4.89 MB, 58 pages) March 2021 | Submitted jointly by Qualimar Shipping Company Limited and EnQuest Heather Limited | - | - | Northern Producer Close Out Report (PDF, 5.79 MB, 45 pages) July 2024 | |
| Balmoral Decommissioning Programme (PDF, 4.27 MB, 65 pages) Balmoral Area CA (PDF, 2.56 MB, 116 pages) Balmoral Area EA (PDF, 8.03 MB, 196 pages) February 2021 | Premier Oil E&P UK Limited | - | - | - | |
| Brenda Decommissioning Programme (PDF, 1.76 MB, 47 pages) February 2021 | Premier Oil E&P UK Limited | - | - | - | |
| Glamis Decommissioning Programme (PDF, 2.53 MB, 46 pages) February 2021 | Premier Oil E&P UK Limited | - | - | - | |
| Nicol Decommissioning Programme (PDF, 1.68 MB, 45 pages) February 2021 | Premier Oil E&P UK Limited | - | - | - | |
| Stirling Decommissioning Programme (PDF, 3.13 MB, 44 pages) February 2021 | Premier Oil E&P UK Limited | - | - | - | |
| Topaz Decommissioning Programme (PDF, 2.21 MB, 31 pages) Topaz CA (PDF, 504 KB, 15 pages) Topaz EA (PDF, 1.22 MB, 37 pages) February 2021 | INEOS UK SNS Limited | - | 1. Schedule Extension to 31/12/2025 & Change to decom solution for covering pipeline ends to use rock rather than backfill January 2024 | - | |
| North Cormorant DP (PDF, 2.56 MB, 50 pages) North Cormorant EA (PDF, 7.26 MB, 93 pages) November 2020 | TAQA Bratani Limited | - | - | - | |
| Tern Topsides - Decommissioning Programme (PDF, 2.84 MB, 52 pages) Tern Topsides EA (PDF, 7.03 MB, 91 pages) November 2020 | TAQA Bratani Limited | - | - | - | |
| Fulmar & Auk North Preparation Work Scopes Decommissioning Programme (PDF, 1.53 MB, 35 pages) November 2020 | Repsol Sinopec North Sea Limited | - | - | - | |
| East Brae Topsides and Braemar Decommissioning Programmes (PDF, 3.88 MB, 62 pages) September 2020 | RockRose UKCS8 LLC | TAQA Bratani Limited | - | - | |
| Brent Alpha Jacket (PDF, 2.82 MB, 101 pages) July 2020 | Shell U.K. Limited | - | - | - | |
| Amethyst A1D, A2D, B1D & C1D Topsides (PDF, 2.42 MB, 43 pages) July 2020 | Perenco UK Limited | - | - | - | |
| Anglia Decommissioning Programme (PDF, 2.18 MB, 61 pages) Anglia CA (PDF, 3.74 MB, 49 pages) Anglia EA (PDF, 5.83 MB, 120 pages) June 2020 | Ithaca Energy UK Limited | - | - | - | |
| Brynhild Pipelines (PDF, 1.98 MB, 50 pages) June 2020 | Lundin Energy Norway AS | Aker BP ASA | - | Brynhild Pipelines Close Out Report (PDF, 2.86 MB, 25 pages) March 2024 | |
| Cormorant Alpha Derrick Structure Removal (PDF, 4.28 MB, 57 pages) June 2020 | TAQA Bratani Limited | - | - | Cormorant Alpha Derrick Structure Removal Close Out Report (PDF, 5.17 MB, 38 pages) December 2023 | |
| Cavendish (PDF, 2.4 MB, 40 pages) June 2020 | INEOS UK SNS Limited | - | 1. Schedule Extension to 31/12/2024 August 2022 2. Schedule Extension to 31/12/2025 & Change to decom solution for covering pipeline ends to use rock rather than backfill January 2024 | - | |
| Banff and Kyle FPSO and FSO Float Off (PDF, 3.45 MB, 39 pages) May 2020 | CNR International (U.K.) Limited | - | - | Banff and Kyle FPSO and FSO Float Off Interim Close Out Report (PDF, 2.31 MB, 36 pages) May 2021 | |
| Eider Topsides DP (PDF, 2.38 MB, 50 pages) May 2020 | TAQA Bratani Limited | - | - | - | |

| Ganymede, Europa, Callisto and NW Bell – LDP3 (PDF, 4.85 MB, 101 pages) May 2020 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Ganymede ZD Topsides - LDP3b (PDF, 2.31 MB, 46 pages) April 2020 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Huntington FPSO (Voyageur Spirit) (PDF, 1.19 MB, 21 pages) April 2020 | Premier Oil E&P UK Limited | - | - | - | |
| Caister - CDP1a (PDF, 2.93 MB, 49 pages) March 2020 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Alma & Galia DPs (PDF, 4.34 MB, 61 pages) March 2020 | EnQuest Heather Limited | - | - | - | |
| Brent Field Pipelines (PDF, 4.05 MB, 130 pages) March 2020 | Shell U.K. Limited | - | - | - | |
| Thistle COS Tanks (PDF, 3.34 MB, 59 pages) January 2020 | EnQuest Heather Limited | - | - | - | |
| Banff SAL Buoy (PDF, 996 KB, 20 pages) November 2019 | CNR International (U.K.) Limited. Decommissioning Programmes submitted by Teekay Petrojarl Floating Production UK Ltd. | - | - | Banff SAL Buoy Interim Close Out Report (PDF, 1.22 MB, 12 pages) May 2021 | |
| MacCulloch Decommissioning Programmes (PDF, 1.36 MB, 40 pages) November 2019 | Chrysaor Production (U.K.) Limited | - | - | - | |
| Goldeneye (PDF, 3.41 MB, 53 pages) November 2019 | Shell U.K. Limited | - | - | Goldeneye Close out Report (PDF, 1.95 MB, 35 pages) July 2024 | |
| Brae Alpha West Drilling Rig (PDF, 2.2 MB, 24 pages) September 2019 | RockRose Energy UKCS8 LLC | TAQA Bratani Limited | 1. Schedule Extension to 31/12/2023 January 2022 | Brae Alpha West Drilling Rig Close Out Report (PDF, 1.68 MB, 24 pages) April 2024 | |
| South Morecambe DP3/DP4 (PDF, 2.72 MB, 57 pages) September 2019 | Spirit Energy Production UK Limited | - | - | - | |
| Pickerill A&B Installations (PDF, 1.79 MB, 54 pages) September 2019 | Perenco Gas (UK) Limited | - | 1. Schedule Extension to 31/12/2024 February 2022 2. Schedule Extension to 31/12/2027 March 2025 | - | |
| Minke Decommissioning Programmes (PDF, 8.56 MB, 59 pages) September 2019 | Neptune E&P UKCS Limited | - | 1. Schedule Extension to 31/12/2024 July 2021 2. Schedule Extension to 31/12/2025 April 2025 | - | |
| Ketch (PDF, 2.65 MB, 60 pages) August 2019 | DNO North Sea (ROGB) Limited | - | 1. Allow for installation of UKNG Viking Cable & Change in decom solution of pipelines to full removal June 2022 2. Include pipeline and fibre optic crossings into DP & Change in decom solution for pipelines remaining under rock berms & additional rock dump on pipeline ends September 2022 3. To alter the S29Holders November 2023 4. Change in decom solution of pipeline sections to leave in situ May 2024 | - | |
| Schooner (PDF, 4.97 MB, 63 pages) August 2019 | DNO North Sea (ROGB) Limited | - | 1. Allow for installation of UKNG Viking Cable June 2022 2. To alter the S29Holders November 2023 3. Addition of WHPS to DP and its removal & Change in decom solution of exposed pipeline sections to full removal May 2024 | - | |
| Juliet DP (PDF, 6.16 MB, 47 pages) August 2019 | Neptune E&P UKCS Limited | - | 1. Schedule Extension to 31/12/2024 July 2021 2. Schedule Extension to 31/12/2025 April 2025 | - | |
| Dunlin Alpha to Cormorant Alpha Pipeline - PL5 (PDF, 4.36 MB, 73 pages) July 2019 | Fairfield Betula Limited | - | - | PL5 Close Out Report (PDF, 4.74 MB, 27 pages) February 2021 | |
| Ninian Northern Platform (PDF, 2.34 MB, 70 pages) | CNR International (U.K.) Limited June 2019 | - | - | - | |
| Nevis N11 WHPS (PDF, 1.66 MB, 26 pages) June 2019 | Apache Beryl I Limited | - | - | Nevis N11 WHPS Close out report (PDF, 1.86 MB, 25 pages) September 2022 | |
| Dunlin Alpha Topsides (PDF, 4.97 MB, 44 pages) May 2019 | Fairfield Betula Limited | - | - | Dunlin Alpha Topsides Close Out Report (PDF, 1.63 MB, 36 pages) September 2024 | |
| Hewett Vent Stack DP (PDF, 1.5 MB, 21 pages) April 2019 | Eni Hewett Limited | ENI UK Limited | - | Hewett Vent Stack Close Out Report (PDF, 595 KB, 11 pages) September 2021 | |
| Pickerill A & B (PDF, 1.26 MB, 21 pages) March 2019 | Perenco Gas (UK) Limited | - | - | - | |
| Curlew B, C and D (PDF, 2.4 MB, 61 pages) March 2019 | Shell U.K. Limited | - | 1. Schedule Extension to 31/12/2026 August 2023 | - | |
| Viking Platforms, Vixen and associated Pipelines (VDP2) (PDF, 33.3 MB, 84 pages) January 2019 | ConocoPhillips (U.K.) Limited | - | - | - | |
| Victor (VDP3) (PDF, 21.1 MB, 55 pages) January 2019 | ConocoPhillips (U.K.) Limited | - | - | - | |
| Tyne South Installations (PDF, 1.83 MB, 42 pages) January 2019 | Perenco UK Limited | - | - | - | |
| Guinevere Installation (PDF, 2.05 MB, 43 pages) January 2019 | Perenco UK Limited | - | - | - | |
| Beatrice Decommissioning Programmes (PDF, 4.45 MB, 88 pages) January 2019 | Repsol Sinopec Resources UK Limited | NEO Energy Resources UK Limited | 1. Terminate agreement for Beatrice AD, AP, B & C reuse July 2019 | - | |
| Bains Decommissioning Programmes (PDF, 2.57 MB, 36 pages) January 2019 | Spirit Energy Production UK Limited | - | - | - | |
| Jacky (PDF, 2.34 MB, 52 pages) October 2018 | Ithaca Energy (UK) Limited | - | 1. Schedule Extension to 31/12/2024 and change to decom solution August 2023 2. Schedule Extension to 31/12/2030. December 2024 3. Change in decom solution to cut and remove trenched and buried sections of pipelines. April 2026 | - | |
| Brae Bravo Topsides, Flare Bridge, Flare Tower and Flare Jacket and Substructure (PDF, 4.9 MB, 52 pages) August 2018 | Marathon Oil UK LLC | TAQA Bratani Limited | - | Brae Bravo Topsides Close Out Report (PDF, 3.29 MB, 36 pages) January 2024 | |
| Brent Alpha, Bravo and Charlie Topsides (PDF, 3.34 MB, 81 pages) August 2018 | Shell U.K. Limited | - | - | - | |
| Stirling A33 WHPS Decommissioning Programme (PDF, 1.13 MB, 27 pages) May 2018 | Premier Oil E&P UK Limited | - | - | Stirling WHPS Close Out Report (PDF, 2.57 MB, 15 pages) February 2019 | |
| Ann and Alison (PDF, 2.98 MB, 60 pages) April 2018 | Spirit Energy North Sea Limited | - | - | - | |
| Saturn (Annabel) (PDF, 2.49 MB, 47 pages) April 2018 | Spirit Energy North Sea Limited | - | - | - | |
| Audrey (PDF, 2.87 MB, 58 pages) April 2018 | Spirit Energy North Sea Limited | - | - | - | |
| Rev Decommissioning Programme (PDF, 12 MB, 42 pages) April 2018 | Repsol Norge AS | - | 1. Schedule Extension to 31/12/2023 November 2019. 2. Schedule Extension to 31/12/2027 February 2023 | - | |
| Markham ST-1 (PDF, 2.39 MB, 49 pages) February 2018 | Centrica Production Nederland B.V. | Spirit Energy Nederland B.V. | - | Markham ST-1 Close Out Report (PDF, 6.19 MB, 68 pages) July 2021 | |
| Osprey (PDF, 3.92 MB, 68 pages) December 2017 | Fairfield Fagus Limited | - | - | Osprey Close Out Report (PDF, 1.71 MB, 34 pages) January 2021 | |
| Merlin (PDF, 2.97 MB, 56 pages) December 2017 | Fairfield Fagus Limited | - | - | Merlin Close Out Report (PDF, 1.47 MB, 27 pages) January 2021 | |
| Dunlin Fuel Gas Import (DFGI) and Dunlin Power Import (DPI) (PDF, 3.48 MB, 54 pages) December 2017 | Fairfield Fagus Limited | - | - | DFGI/DPI Close Out Report (PDF, 2.19 MB, 30 pages) January 2021 | |
| Viking Satellites CD, DD, ED, GD, HD Pipelines (PDF, 6.77 MB, 32 pages) November 2017 | ConocoPhillips (U.K.) Limited | - | - | - | |
| LOGGS Satellites Vulcan UR, Viscount VO, Vampire OD - LDP1 (PDF, 17.5 MB, 61 pages) November 2017 | ConocoPhillips (U.K.) Limited | - | - | - | |
| Leman BH Decommissioning Programme (PDF, 4.66 MB, 46 pages) April 2017 | Shell U.K. Limited | - | - | Leman BH Close Out Report (PDF, 1.71 MB, 25 pages) March 2019 | |
| Ettrick and Blackbird (PDF, 2.1 MB, 62 pages) March 2017 | Nexen Petroleum U.K Limited | CNOOC Petroleum Europe Limited | 1. Schedule Extension to 31/12/2023 July 2020 2. Schedule Extension to 31/12/2025 (Ettrick Inst only) December 2022 3. Schedule Extension to 31/12/2026 August 2025 | - | |
| Ann A4 Decommissioning Programme (PDF, 1.37 MB, 29 pages) February 2017 | Centrica North Sea Limited | - | - | - | |
| Janice James & Affleck (PDF, 3.8 MB, 115 pages) September 2016 | Maersk Oil UK Limited | TotalEnergies Offshore UK Limited | 1. Change of parties to the approved Programmes Affleck PLs only December 2021 | - | |
| Athena Decommissioning Programmes (PDF, 3.88 MB, 70 pages) September 2016 | Ithaca Energy (UK) Limited | - | 1. Schedule Extension to 31/12/2023 and change of parties to the approved Programmes January 2021 | - | |
| Viking Platforms (PDF, 3.53 MB, 40 pages) September 2016 | ConocoPhillips (U.K.) Limited | - | - | - | |
| Leadon (PDF, 1.71 MB, 53 pages) March 2016 | Maersk Oil North Sea UK Limited | TotalEnergies E&P UK Limited | - | Leadon Close Out Report (PDF, 7.78 MB, 31 pages) February 2023 | |
| Harding STL (PDF, 2.61 MB, 73 pages) December 2015 | TAQA Bratani Limited | - | - | Harding STL Close-Out Report (PDF, 1.62 MB, 26 pages) June 2017 | |
| Thames Area – Horne & Wren (PDF, 1.57 MB, 48 pages) November 2015 | Tullow Oil SK Limited | - | - | - | |
| Thames Area – Orwell (PDF, 828 KB, 42 pages) November 2015 | Tullow Oil SK Limited | - | - | - | |
| Thames Area – Wissey (PDF, 1.26 MB, 43 pages) November 2015 | Tullow Oil SK Limited | - | - | - | |
| Thames Area – Thames Complex (PDF, 15.9 MB, 76 pages) October 2015 | Perenco UK Limited | - | 1. Removal of pipeline from the programme March 2018 2. Schedule Extension to 31/12/2023 March 2019 3. Schedule Extension to 31/12/2024 and Change in decom solution of mats to leave in situ. July 2024 | Thames Complex Close Out Report (PDF, 4.27 MB, 65 pages) January 2026 | |
| Thames Area – Gawain (PDF, 3.8 MB, 47 pages) October 2015 | Perenco UK Limited | - | 1. Schedule Extension to 31/12/2022 March 2019 2. Schedule Extension to 31/12/2024 September 2022 3. Schedule Extension to 31/12/2027 and Change in decom solution of mats to leave in situ. August 2025 | - | |
| Thames Area – Arthur (PDF, 4.41 MB, 46 pages) October 2015 | Perenco UK Limited | - | 1. Schedule Extension to 31/12/2022 March 2019 2. Schedule Extension to 31/12/2024 March 2022 3. Schedule Extension to 31/12/2026 April 2025 | - | |
| Brent - Brent Delta Topside (PDF, 3.55 MB, 72 pages) July 2015 | Shell U.K. Limited | - | - | Brent Delta Topside Close Out Report (PDF, 4.42 MB, 53 pages) February 2020 | |
| Rose DP (PDF, 2.87 MB, 42 pages) May 2015 | Centrica Resources Limited | - | - | Rose Close Out Report (PDF, 3.31 MB, 36 pages) October 2018 | |
| Stamford (PDF, 2.71 MB, 39 pages) April 2015 | Centrica North Sea Gas Limited | - | - | Stamford Close Out Report (PDF, 2.66 MB, 36 pages) February 2019 | |
| Murchison (PDF, 2.37 MB, 70 pages) August 2014 | CNR | - | - | - | |
| Rubie & Renee (PDF, 2.47 MB, 50 pages) April 2014 | Endeavour Energy UK Limited | - | 1. Schedule Extension to 31/12/2017 June 2016 2. Schedule Extension to 31/12/2018 November 2017 3. Schedule Extension to 31/12/2020 December 2018 | Rubie Renee Decommissioning Close Out Report (PDF, 9.98 MB, 66 pages) September 2021 | |
| Miller (PDF, 6.57 MB, 198 pages) December 2013 | BP Exploration (Alpha) Limited | - | 1. Schedule Extension to 31/12/2024 December 2018 | - | |
| Schiehallion & Loyal Phase One (PDF, 1.84 MB, 60 pages) April 2013 | Britoil Limited | - | - | Schiehallion & Loyal Phase One Close Out Report (PDF, 1010 KB, 22 pages) May 2019 | |
| IVRR - decommissoning programme (PDF, 1.57 MB, 102 pages) February 2013 | Hess Limited | - | - | IVRR Close Out Report (PDF, 4.74 MB, 35 pages) December 2015 | |
| Camelot (PDF, 488 KB, 39 pages) June 2012 | Energy Resource Technology (UK) Limited | - | - | Camelot Close out report (PDF, 2.27 MB, 41 pages) August 2013 | |
| Fife, Flora, Fergus, Angus: decommissioning programme (PDF, 8.36 MB, 135 pages) February 2012 | Hess Limited | - | - | FFFA Close Out Report (PDF, 1.49 MB, 33 pages) December 2014 | |
| Don (PDF, 8 MB, 175 pages) May 2011 | Britoil Public Limited Company | - | - | - | |
| Welland DP (PDF, 1.74 MB, 39 pages) September 2010 | Perenco UK Limited | - | - | Welland Close Out Report (PDF, 7.42 MB, 130 pages) September 2020 | |
| Tristan NW DP (PDF, 4.11 MB, 119 pages) August 2010 | Silverstone Energy Limited | Bridge Energy UK Limited | - | Tristan NW close out report (PDF, 2.3 MB, 23 pages) January 2011 | |
| Shelley DP (PDF, 3.23 MB, 83 pages) June 2010 | Premier Oil | - | - | Shelley close out report (PDF, 4.49 MB, 62 pages) February 2012 | |
| Kittiwake Sal DP (PDF, 4.28 MB, 87 pages) June 2009 | Venture North Sea Oil Limited | - | - | Kittiwake Sal close out report (PDF, 588 KB, 13 pages) July 2012 | |
| MCP-01 DP (PDF, 7.41 MB, 336 pages) September 2007 | Total E&P UK Limited | - | - | MCP-01 close out report (PDF, 23.1 MB, 113 pages) March 2013 | |
| Kittiwake Buoy DP (PDF, 3.46 MB, 118 pages) May 2008 | Venture North Sea Oil Limited | - | 1. Change of parties to the approved Programme August 2016 | - | |
| Linnhe (PDF, 2.25 MB, 66 pages) July 2008 | Mobil North Sea LLC | - | - | Linnhe Close Out Report (PDF, 1000 KB, 22 pages) November 2013 | |
| Indefatigable (Shell) (PDF, 11.6 MB, 224 pages) May 2007 | Shell UK Limited | - | - | Close Out Report (PDF, 2.47 MB, 64 pages) December 2014 | |
| NW Hutton: decommissioning programme (PDF, 14.9 MB, 320 pages) February 2006 | Amoco (U.K.) Exploration Company - now a subsidiary of BP plc | - | - | Close Out Report (PDF, 2.52 MB, 32 pages) October 2014 | |
| Ardmore 2005 | British American Offshore Limited | - | - | - | |
| Ardmore 2005 | Ugland Nordic Shipping AS | - | - | - | |
| Ardmore 2005 | Acorn Oil & Gas Limited | - | - | - | |
| Brent Flare DP (PDF, 2.93 MB, 122 pages) 2004 | Shell | - | - | Brent Flare Close out Report (PDF, 2.7 MB, 31 pages) May 2025 | |
| Beatrice 2004 | Talisman Energy (UK) Limited | - | - | - | |
| Forbes and Gordon 2003 | BHP Billiton | - | - | May 2005 | |
| Frigg DP (PDF, 10 MB, 450 pages) May 2003 | Total E&P Norge AS | - | - | Frigg close out report (PDF, 3.46 MB, 62 pages) May 2011 | |
| Durwood and Dauntless 2002 | Amerada Hess | - | - | - | |
| Hutton 2002 | Kerr McGee | - | - | July 2004 | |
| Camelot CB 2001 | ExxonMobil | - | - | - | |
| Blenheim and Bladon 2000 | Talisman | - | - | - | |
| Durwood and Dauntless 2000 | Amerada Hess | - | - | - | |
| Maureen and Moira 2000 | Phillips | - | - | - | |
| Brent Spar 1998 | Shell | - | - | - | |
| Donan 1998 | BP | - | - | - | |
| Fulmar SALM 1998 | Shell | - | - | - | |
| Emerald 1996 | MSR | - | - | - | |
| Frigg FP 1996 | Elf Norge | TotalFinaElf Norge | - | - | |
| Leman BK 1996 | Shell | - | - | - | |
| Staffa 1996 | Lasmo | - | - | - | |
| Viking AC, AD, AP & FD 1996 | Conoco | - | - | - | |
| Esmond CP & CW 1995 | BHP | - | - | - | |
| Gordon BW 1995 | BHP | - | - | - | |
| Angus 1993 | Amerada Hess | - | - | - | |
| Forbes AW 1993 | Hamilton | BHP | - | - | |
| Argyll, Duncan and Innes 1992 | Hamilton | BHP | - | - | |
| Blair 1992 | Sun Oil | AGIP | - | - | |
| Crawford 1991 | Hamilton Oil | BHP | - | - | |
| Piper Alpha 1988 | Occidental | Talisman | - | - | |

Notification of disused pipelines

During the course of a field’s life, pipelines/sections of pipelines may be taken out of use, e.g. due to corrosion, problems with reservoir pressure, damage to the pipeline, etc. When this happens, under the Petroleum Act 1998 the Secretary of State has the option of immediately calling for a full decommissioning programme. This is not always considered an appropriate option however, and so it has been agreed consideration will be given to handling suitable pipelines, under an informal decommissioning regime, thereby deferring a formal programme until the end of the field’s life.

If a formal decommissioning programme is not immediately deemed suitable, details of the out of use pipeline(s) will be circulated to other government departments for comment. Following this, OPRED will decide one of the following:

  • we are content with the proposals for monitoring and maintaining the out-of-use pipeline
  • we request additional information or further remedial action
  • we request a formal decommissioning programme The Interim Pipeline Regime is intended to ensure out of use lines do not pose a risk to other users of the sea or the environment and that they are covered by an appropriate surveying and maintenance regime from the point when they are taken out of use until approval of the formal decommissioning programme, which is usually at the end of field life. It should be noted that any interim solution should not prejudice the final decommissioning options for that line, including complete removal. The department expects operators to submit details of out of use pipelines/sections of a pipeline as soon as they are taken out of use.

Operators are reminded that any works that are proposed on any pipelines under the Pipeline Works Authorisation regime, as per their Terms and Conditions of the PWA, must have a legal consent in place before works can commence which includes but is not exclusive to any proposed decommissioning works. Consents are issued by the North Sea Transition Authority (NSTA) and operators are requested to email consents@nstauthority.co.uk on any queries that they may have relating to legal consents. Further guidance can also be found on the NSTA website.

Once the necessary legal consent has been issued by NSTA, Consents & Authorisations Section, Operators are to email a completed IPR1 Form (MS Word Document, 63.7 KB) to odu@energysecurity.gov.uk.

If you are an operator, aware of any out of use pipelines that have not been referred to the department, please submit a completed IPR1 Form at your earliest convenience.

Following confirmation a pipeline has been accepted under the Interim Pipeline Regime, the Offshore Decommissioning Unit will continue to monitor the condition of the pipeline by asking the Operator to confirm the status of the pipeline remains unchanged following future surveys at an agreed frequency. If you are an operator who wishes to request a change to the agreed frequency of surveys following acceptance of a pipeline into the IPR, please submit a completed IPR2 Form (MS Word Document, 53.4 KB) to odu@energysecurity.gov.uk. Please note that a recent survey (done that year) must have been completed before any change of survey frequency will be considered.

Further information

A list of all installations on the UKCS and their current status is available from the OSPAR Website

At the first ministerial meeting of the Commission for the Protection of the Marine Environment of the North East Atlantic (OSPAR) in 1998, a binding decision was agreed that set rules for the disposal of offshore installations at sea. Under the decision the dumping and leaving wholly or partly in place of offshore installations is prohibited. Decision 98/3 recognises it may be difficult to remove the ‘footings’ of large steel jackets weighing more than 10,000 and concrete installations. As a result there are derogations for these categories of installations if the internationally agreed assessment and consultation process shows leaving them in place is justifiable.

OPRED has utilised decommissioning programme templates for derogation and non-derogation projects. These templates include all required content as detailed in Annex C of the guidance notes. There are also templates available which are currently being trialled for more specific and small scale decommissioning activity including rig reactivation and removal of a single Wellhead Protection Structure. Operator’s should discuss all individual cases with OPRED who will advise of the appropriate template.

A Standard Decommissioning Programme Template (Non-Derogation Cases) (PDF, 608 KB, 33 pages) is available - (March 2025).

A Standard Decommissioning Programme Template (Derogation Cases) (PDF, 1.11 MB, 37 pages) is also available (November 2018).

A word version of these templates can also be requested from OPRED. Please email odu@energysecurity.gov.uk for further details.

Cost recovery

OPRED will charge a fee in respect of offshore (oil and gas) installations and pipelines decommissioning programmes under the Petroleum Act 1998. Guidance, including the indicative fee structure, is available in Guidance on charging a fee for offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 (PDF, 308 KB, 9 pages)

Facilities

Pipeline FIR Template Pipeline FIR Template (MS Word Document, 40.3 KB)

Updates to this page

Published 23 January 2013 Last updated 13 April 2026 show all updates
1.
13 April 2026

Published the government response to the consultation on OPRED’s decommissioning charging regulations and hourly rates consultations.
2.
9 April 2026

Revision approved
3.
8 April 2026

DP Revision Approved
4.
26 March 2026

Revision to an Approved DP
5.
20 March 2026

New approved DP added
6.
18 March 2026

Pipeline FIR form added
7.
10 March 2026

DP for consultation
8.
6 March 2026

A DP has been approved
9.
26 February 2026

DP has been approved
10.
20 February 2026

New DP out to consultation
11.
18 February 2026

DP approval
12.
17 February 2026

Consultation - Proposed changes to the rates of fees in respect of environmental functions and decommissioning functions
13.
6 February 2026

New approved DP
14.
4 February 2026

New approved Close Out Report
15.
30 January 2026

New DP added to website
16.
28 January 2026

Revision to approved DP
17.
27 January 2026

Consultation draft DP added
18.
19 January 2026

New approved DP added
19.
6 January 2026

New DP Approval
20.
19 December 2025

Approval of Decommissioning Programme
21.
16 December 2025

Added Consultation on OPRED Decommissioning Charging Regulations 2026
22.
10 December 2025

New approved DP
23.
21 November 2025

A new DP has been added to the website
24.
20 November 2025

Consultation draft added
25.
13 November 2025

Close Out Report added
26.
10 November 2025

New draft DP added to website
27.
30 October 2025

New DP Approval
28.
23 October 2025

A new DP has been added to the website
29.
23 October 2025

Acceptance of Close Out Report
30.
8 October 2025

New approved DP
31.
3 October 2025

A new DP is out for Consultation
32.
26 September 2025

DP approval
33.
24 September 2025

DP Approval
34.
18 September 2025

A DP has been approved
35.
4 September 2025

A DP has gone out to public consultation
36.
3 September 2025

DP has been approved
37.
2 September 2025

Approval of Decommissioning Programme
38.
2 September 2025

Approval of Decommissioning Programme
39.
18 August 2025

DP has been approved
40.
14 August 2025

Revision to approved DP
41.
14 August 2025

A DP added for Consultation
42.
30 July 2025

New approved DP
43.
25 July 2025

A new DP out to consultation and a DP approved
44.
21 July 2025

Addition of new approved DP
45.
18 July 2025

New DP out to Consultation
46.
10 July 2025

Acceptance of Close out Report
47.
2 July 2025

Close Out Report added to the website
48.
1 July 2025

New draft DP under consideration
49.
30 June 2025

DPs have been approved
50.
16 June 2025

Addition of Decommissioning Programme under consideration.
51.
6 June 2025

Revision to Approved Programme
52.
2 June 2025

A DP has been approved
53.
21 May 2025

Decommissioning Programme Approved
54.
16 May 2025

A DP has been approved
55.
15 May 2025

A revision to a DP date has been added
56.
14 May 2025

Approval of DP
57.
7 May 2025

Acceptance of Close out Report
58.
7 May 2025

DP has been approved
59.
1 May 2025

Addition of new DP
60.
23 April 2025

Revisions to approved Decommissioning Programmes
61.
14 April 2025

Draft DP approved
62.
11 April 2025

New approved Decommissioning Programme
63.
11 April 2025

Decommissioning Programmes for consultation
64.
4 April 2025

Three new DPs have been added to the OPRED website.
65.
18 March 2025

A DP Revision approval and Updated non-derogation DP Template
66.
11 March 2025

draft decommissioning programme removed
67.
11 March 2025

Addition of new draft programmes under consideration and approved decommissioning programme
68.
26 February 2025

Revision details added
69.
21 February 2025

A new DP is out to consultation.
70.
15 January 2025

New draft Decommissioning Programme added
71.
10 January 2025

New DPs under consideration added
72.
7 January 2025

Addition of new approved DP
73.
19 December 2024

Revision details and approval date added
74.
16 December 2024

Revision details added
75.
12 December 2024

Addition of new draft decommissioning programme
76.
9 December 2024

Document names updated for Knarr Gas Pipeline (KGP) and Brent PLU6294
77.
6 December 2024

Addition of two draft Decommissioning Programmes and Environmental Appraisals.
78.
22 November 2024

Addition of new DP and associated documents
79.
12 November 2024

New Decommissioning Programmes added to ODU website
80.
23 October 2024

Addition of Approved Decommissioning Programme
81.
17 October 2024

Consultation draft DPs added
82.
9 October 2024

New Non-Derogation Template added to website
83.
3 October 2024

Revision details added
84.
30 September 2024

Revision to approved DP
85.
26 September 2024

DP has been approved
86.
20 September 2024

Approved Close Out Report added
87.
6 September 2024

Consultation Draft DP added
88.
30 August 2024

New DP added to website
89.
23 August 2024

DP out for consultation
90.
1 August 2024

Additional information added for LBA DP
91.
1 August 2024

Approved Close Out Report added
92.
25 July 2024

East Brae UJ DP approved
93.
22 July 2024

Acceptance of Close out Report
94.
22 July 2024

New Decommissioning Programme added to website for consultation
95.
19 July 2024

Solan DP consultation
96.
8 July 2024

A new DP is out for consultation
97.
5 July 2024

Consultation DP added
98.
1 July 2024

Addition of DP revisions to website
99.
23 May 2024

Approved Close Out Report added
100.
22 May 2024

Approved Decommissioning Programme
101.
20 May 2024

Approved DP added
102.
29 April 2024

New Decommissioning Programme added to website
103.
26 April 2024

A DP has been approved
104.
16 April 2024

Change of Operator has occurred in the Wenlock and Garrow Fields
105.
4 April 2024

Consultation DP added
106.
11 March 2024

Close Out Report added to Website
107.
11 March 2024

Approved DP added
108.
14 February 2024

Decommissioning Programme for consultation
109.
26 January 2024

The Brae Bravo Topsides Close Out Report has been accepted and added to the website.
110.
17 January 2024

Acceptance of Close Out Report
111.
11 January 2024

Approved Decommissioning Programme
112.
5 January 2024

Helvellyn - Waldorf has been moved from "under consideration" to "approved".
113.
14 December 2023

Garrow documents added for Public Consultation.
114.
29 November 2023

Final draft of Financial Assurance Guidance published
115.
30 October 2023

Decommissioning Programme approved
116.
4 October 2023

Decommissioning Programme approved
117.
29 September 2023

Approved Decommissioning Programme
118.
14 September 2023

A DP has been approved
119.
14 September 2023

A DP has been approved
120.
17 August 2023

Decommissioning Programme for consultation
121.
14 August 2023

New DP out to consultation.
122.
11 August 2023

ODU email address updated
123.
12 July 2023

Decommissioning Programme out to consultation
124.
30 June 2023

Consultation DP added
125.
29 June 2023

Typo corrected on IPR 1
126.
28 June 2023

Addition of new IPR forms for use
127.
27 June 2023

Consultation DP added
128.
20 June 2023

Consultation DP added
129.
8 June 2023

DP approval
130.
26 May 2023

Decommissioning Programme for consultation
131.
12 May 2023

Decommissioning Programme for consultation
132.
28 April 2023

East Brae UJ DP consultation commenced
133.
21 April 2023

Consultation decommissioning programmes added
134.
28 March 2023

DP approval
135.
3 March 2023

Addition of Western Isles FPSO DP in programme under consideration tab
136.
10 February 2023

Close Out Report added
137.
8 February 2023

link to guidance update page
138.
7 February 2023

Consultation DP added
139.
20 January 2023

DPs withdrawn as added in error
140.
20 January 2023

Consultation DPs added
141.
9 January 2023

DP approval
142.
14 December 2022

DP approval
143.
9 December 2022

DP approved
144.
16 November 2022

DPs have now been approved
145.
14 November 2022

lancaster FPSO DP approved
146.
7 November 2022

DP approval
147.
28 October 2022

Consultation draft DP added
148.
7 October 2022

Consultation draft DPs added
149.
30 September 2022

Decommissioning Programme for consultation
150.
28 September 2022

N11 COR added
151.
21 September 2022

Notification of an approved DP
152.
18 August 2022

DP approval
153.
5 July 2022

Approved DPs published
154.
7 June 2022

Brae B upper jacket DP approved
155.
9 May 2022

Approved DP
156.
6 May 2022

approval of foinaven FPSO DP
157.
29 April 2022

response to consultation document for proposed changes to fee charging regime in respect of offshore oil and gas installations and pipelines published
158.
21 April 2022

DP Approval
159.
21 April 2022

Consultation DPs added
160.
21 April 2022

Decommissioning programme for consultation
161.
20 April 2022

Approval of Decommissioning Programme
162.
7 March 2022

New DPs out to consultation
163.
3 March 2022

wenlock DP approval re-added appears to have been deleted in error
164.
25 February 2022

Consultation DP
165.
23 February 2022

Approved DP
166.
22 February 2022

Approved DP
167.
9 February 2022

DP approval
168.
14 January 2022

Draft programme for consultation
169.
23 December 2021

DP approval
170.
20 December 2021

Consultation DP added
171.
13 December 2021

DP approved
172.
25 November 2021

Causeway and Fionn DP consultation
173.
10 November 2021

DP approval
174.
25 October 2021

Decommissioning Programme for consultation
175.
15 October 2021

Decommissioning Programmes added for Public Consultation
176.
24 September 2021

Acceptance of Close Out Report
177.
21 September 2021

DP Consultation
178.
10 September 2021

COR accepted
179.
31 August 2021

Consultation DP added
180.
27 August 2021

ensign DP approved
181.
26 August 2021

Consultation DP
182.
13 August 2021

markham close out report added
183.
6 August 2021

Consultation DP
184.
3 August 2021

DP approval
185.
28 July 2021

Cost recovery consultation impact assessment added
186.
26 July 2021

DP Approval
187.
22 July 2021

DP approval
188.
28 June 2021

newly approved DP
189.
18 June 2021

Decommissioning programme for consultation
190.
7 June 2021

Consultation draft DP added
191.
24 May 2021

Edited 'Overview' section to publish details of consultation on proposed changes to fee charging regime.
192.
21 May 2021

interim CORs added for Banff FPSO and SAL buoy DPS
193.
13 May 2021

approval of Gaupe DP
194.
6 May 2021

Approval of Decommissioning Programme
195.
21 April 2021

DP approved
196.
16 April 2021

Adding an approved DP
197.
9 April 2021

Consultation DP
198.
1 April 2021

DP approved
199.
1 April 2021

Approved Decommissioning Programme
200.
24 March 2021

Decommissioning Programmes for consultation
201.
22 March 2021

DP approved
202.
16 March 2021

DP approved
203.
11 March 2021

DP approved
204.
26 February 2021

COR added
205.
17 February 2021

Approved DPs added
206.
21 January 2021

Close Out Reports Approved
207.
17 December 2020

Adding A Decommissioning Programme which is out to Public Consultation.
208.
15 December 2020

Consultation DPs added
209.
7 December 2020

Consultation DP added
210.
30 November 2020

Consultation DP added
211.
19 November 2020

Approval of Decommissioning Programme
212.
19 November 2020

Decommissioning Programme Approved
213.
4 November 2020

Approval of preparatory works
214.
16 October 2020

Consultation DP added
215.
9 October 2020

Accepted Close Out Report added
216.
30 September 2020

Approval of Decommissioning Programme
217.
21 September 2020

Five new DPs out to consultation
218.
16 September 2020

A new DP is out to public consultation
219.
31 August 2020

draft DP added
220.
24 July 2020

Decommissioning Programmes for consultation
221.
23 July 2020

Approval of A DP and Derogation
222.
10 July 2020

Draft decommissioning programme for consultation
223.
9 July 2020

Decommissioning Programme for consultation
224.
8 July 2020

document replaced with updated version
225.
1 July 2020

Decommissioning Programme Approval
226.
15 June 2020

Approved Decommissioning Programme
227.
12 June 2020

Consultation DP added
228.
11 June 2020

DP has been approved
229.
11 June 2020

Decommissioning Programme for consultation
230.
8 June 2020

A DP has been added for public consultation
231.
4 June 2020

Approval of Decommissioning Programme
232.
2 June 2020

Approved DP added
233.
27 May 2020

Approval of Decommissioning Programme
234.
25 May 2020

approval of Eider topsides DP
235.
21 May 2020

A Decommissioning Programme has been approved
236.
24 April 2020

consultation DP added
237.
16 April 2020

Approval of a DP
238.
8 April 2020

Approved DP
239.
31 March 2020

Approval of a DP
240.
31 March 2020

Decommissioning Programme for consultation
241.
30 March 2020

Approved DP
242.
16 March 2020

Decommissioning Programme now approved
243.
13 March 2020

Consultation DPs
244.
10 March 2020

Decommissioning Programme for consultation
245.
14 February 2020

CoR added to website
246.
12 February 2020

DP approval
247.
7 February 2020

Huntington Consultation DP added
248.
29 January 2020

New Decommissioning Programmes out to consultation.
249.
22 January 2020

New DP out to consultation
250.
20 January 2020

New DP out to consultation
251.
10 January 2020

Decommissioning Programmes for consultation
252.
20 December 2019

Decommissioning Programme for consultation
253.
18 December 2019

Decommissioning Programme for consultation
254.
20 November 2019

Approved of Banff SAL Buoy DP
255.
8 November 2019

Consultation of Cavendish Decommissioning Programme
256.
6 November 2019

MacCulloch DP approved
257.
1 November 2019

New approved DP
258.
8 October 2019

Consultation of Ensign
259.
3 October 2019

Approval of Decommissioning Programme
260.
27 September 2019

Approval of South Morecambe DP3/DP4 Decommissioning Programmes
261.
11 September 2019

Pickerill installations DP approved
262.
4 September 2019

Minke DP approved
263.
2 September 2019

Banff SAL buoy DP for consultation
264.
22 August 2019

Addition of two approved decommissioning programmes
265.
1 August 2019

Added the approved Juliet DP to the website
266.
3 July 2019

PL5 approved
267.
1 July 2019

NNP approved
268.
1 July 2019

Decommissioning Programme for consultation
269.
26 June 2019

Consultation of MacCulloch Field Decommissioning Programmes
270.
25 June 2019

Revised CAs for Brae A, Brae B and East Brae
271.
6 June 2019

Approval of Nevis N11 WHPS Decommissioning Programme
272.
29 May 2019

Change of email to a generic one rather than a personal email.
273.
28 May 2019

Schiehallion & Loyal Phase One Close Out Report Approved
274.
3 May 2019

Approval of the Dunlin Alpha Topsides Decommissioning Programme
275.
30 April 2019

Update of the content of the DP
276.
18 April 2019

Approval of Hewett Vent Stack DP
277.
17 April 2019

consultation closed
278.
5 April 2019

Consultation DP and supporting documents for PL5
279.
28 March 2019

Minke and Juliet consultation DPs published
280.
22 March 2019

Addition of Close Out Report
281.
14 March 2019

New Approved Programme
282.
14 March 2019

New programme for consultation
283.
8 March 2019

Publishing approved Curlew DP
284.
19 February 2019

Morecambe DPs published for consultation
285.
18 February 2019

Added a CoR
286.
6 February 2019

Addition of Close Out Report
287.
31 January 2019

Approved DPs for VDP2 and VDP3 added
288.
25 January 2019

Addition of approved DPs for Tyne South Installations and Guinevere Installation
289.
23 January 2019

Addition of approved decommissioning programme
290.
17 January 2019

Approval of a Decommissioning Programme
291.
21 December 2018

Addition of Brent Delta Close Out Report
292.
14 December 2018

Addition of 2 decommissioning programmes for consultation
293.
30 November 2018

Update decommissioning templates added
294.
22 November 2018

Guidance document was updated and uploaded
295.
6 November 2018

Adding Goldeneye DP for consultation.
296.
25 October 2018

Jacky Decommissioning Programmes Approved
297.
3 October 2018

Approval of Close out Report
298.
15 August 2018

Approval of Decommissioning Programme
299.
15 August 2018

VDP2 and VDP3 consultation draft Decommissioning Programmes added
300.
6 August 2018

Approval of Brent Alpha, Bravo and Charlie Topsides Decommissioning Programme
301.
3 August 2018

Offshore Oil and Gas Decommissioning Programme out to consultation
302.
2 August 2018

Addition of a new decommissioning programme for consultation
303.
20 July 2018

Tyne South and Guinevere Installation Decommissioning Programmes published for consultation
304.
18 June 2018

Addition of Curlew DPs, CA and EIA for Public Consultation.
305.
12 June 2018

Decommissioning Programme Approved
306.
3 May 2018

Updated Offshore decommissioning guidance has been added
307.
2 May 2018

Ann & Alison, Saturn (Annabel) and Audrey DPs have been approved
308.
16 April 2018

Changed document to final version
309.
16 April 2018

A decommissioning programme has been approved
310.
23 March 2018

Approved Markham DP
311.
23 March 2018

Bains Documents Added
312.
9 March 2018

Updated Environmental Guidance on Decommissioning
313.
6 March 2018

Jacky DP Consultation
314.
12 January 2018

Draft Consultation Decommissioning Programme uploaded
315.
21 December 2017

Updated guidance for Offshore Decommissioning on website for feedback
316.
15 December 2017

Addition of approved DPs
317.
4 December 2017

Approved DPs added
318.
6 September 2017

Saturn Annabel, Audrey and LDP1 Programmes for public consultation
319.
27 July 2017

DPN form corrected
320.
5 July 2017

generic email address added and DPN form updated (with generic email address)
321.
30 June 2017

Ann and Alison DP's and associated documents added for public consultation
322.
23 June 2017

Fairfield Fagus Limited's Dunlin Fuel Gas Import and Power Import, Merlin and Osprey Decommissioning Documents uploaded
323.
21 June 2017

Brae Area DPs and associated documents available for consultation
324.
5 June 2017

Harding STL Close Out Report added
325.
3 May 2017

Disused Pipeline Notification Form revised - 03 May 17
326.
28 April 2017

Leman BH Decommissioning Programme approved
327.
21 April 2017

Approval of Ettrick and Blackbird DP
328.
3 March 2017

Ninian North Platform documents published for public consultation
A4 Programme approved
329.
8 February 2017

Brent Decommissioning Programmes published for consultation
330.
27 January 2017

IVRR Close Out Report added
331.
8 November 2016

Ann A4 Installation Decommissioning Programme added for consultation
332.
6 October 2016

Approved Decommissioning Programmes added
333.
20 September 2016

Atlantic and Cromarty Draft Decommissioning Programmes Consultation
334.
6 September 2016

references of DECC amended to BEIS (including DPN form)
335.
15 July 2016

Janice, James & Affleck Fields - Draft programmes under consideration (added)
336.
13 July 2016

Markham ST-1 Decommissioning Programmes - (added)
337.
16 June 2016

Oil & Gas: Update Notification of Disused Pipelines
338.
16 June 2016

Oil & Gas: Update Table of draft decommissioning programmes under consideration.
339.
2 March 2016

Leadon Decommissioning Programmes - (added)
340.
17 February 2016

Notification of Disused Pipelines form - (updated)
341.
3 February 2016

Harding STL approved decommissioning programme - (added)
342.
3 December 2015

Thames Area - Horne & Wren, Orwell and Wissey approved decommissioning programmes - (added)
343.
23 November 2015

Fife, Flora, Fergus, Angus: decommissioning programme FFFA Close Out Report - (added)
344.
2 November 2015

Thames Area – Thames Complex, Gawain & Arthur - Approved decommissioning programmes - (added)
345.
7 October 2015

Viking Satellites CD,DD,ED,GD,HD draft decommissioning programmes under consideration - (added)
346.
21 September 2015

Oil and Gas: Updated document for Harding STL Decommissioning Programme
347.
18 September 2015

Oil and Gas: Updated “Table of approved decommissioning programmes” table.
348.
6 August 2015

Leman BH draft decommissioning programme - (added)
349.
3 July 2015

Oil and Gas: Addition of Brent field to approved decommissioning programme
350.
29 May 2015

Oil and gas: Rose approved decommissioning programme - (added)
351.
20 May 2015

Decommissioning - Leadon draft programme, follow up consultation - (added)
352.
15 May 2015

Oil and gas: Stamford decommissioning programme - (added)
353.
25 March 2015

Oil and gas: Rose Field decommissioning programmes - (added)
354.
18 February 2015

Oil and gas: Brent – Brent Delta Topside draft decommissioning programme - (added)
355.
3 February 2015

Oil and Gas: Addition of Stamford Field to decommissioning programmes table
356.
9 January 2015

Oil and Gas: Updated the disused pipeline notification form
357.
20 November 2014

Oil and gas: Decommissioning - Streamlined Decommissioning Programme Template (Derogation Cases) - (added)
358.
6 November 2014

Oil and gas: NW Hutton close out report - (added)
359.
16 October 2014

Oil and gas: Decommissioning draft prgrams - Thames - (added)
360.
13 October 2014

Oil and gas: Indefatigable (Shell) close out report - (added)
361.
8 August 2014

Oil and gas: Streamlined Decommissioning Programme Template (Non-Derogation Cases) - (updated)
362.
4 August 2014

Oil and gas: Murchison approved decommissioning programme - (added)
363.
5 March 2014

Oil and gas: Rubie & Renee - Approved decommissioning programme - (added)
364.
14 February 2014

Oil and gas: Decommisiioning Linhe close out report - (added)
365.
27 January 2014

Oil and gas: Streamlined Decommissioning Programme Template (Non Derogation Cases) - updated
366.
27 January 2014

Oil and gas: Leadon Draft Decommissioning Programme - added
367.
10 December 2013

Oil and gas: Miller decommissioning programme - (added)
368.
19 November 2013

Oil and gas: Rubie/Renee Draft Decommissioning Programme - (added)
369.
13 September 2013

Camelot close out report - added
370.
3 June 2013

Added Murchison draft decommissioning programme
371.
28 January 2013

Added streamlined decommissioning programme template
372.
23 January 2013

Re-created table, added H2's and anchors
373.
23 January 2013

First published.

Sign up for emails or print this page

Get emails about this page Print this page Contents

Named provisions

Environmental Considerations for Decommissioning Financial Assurance Guidance

Get daily alerts for UK OPRED

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from OPRED.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
OPRED
Published
April 13th, 2026
Instrument
Guidance
Legal weight
Non-binding
Stage
Final
Change scope
Substantive

Who this affects

Applies to
Energy companies
Industry sector
2111 Oil & Gas Extraction
Activity scope
Oil & gas decommissioning Pipeline decommissioning Financial assurance
Geographic scope
United Kingdom GB

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Environmental Protection Government Contracting

Get alerts for this source

We'll email you when UK OPRED publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!