Devendra Sharma vs State Of Bihar - Environmental Pollution Case

Favicon for indiankanoon.org India National Green Tribunal
Filed March 23rd, 2026
Detected March 27th, 2026
Email

Summary

The National Green Tribunal (NGT) has initiated proceedings against M/s Sumit, Proprietor (Shri Pramod Sharma) for operating an illegal plastic manufacturing unit in Patna without necessary environmental permits. The NGT has directed the impleadment of the proprietor and the Bihar State Pollution Control Board as respondents and issued notices for closure and sealing of the premises.

What changed

The National Green Tribunal (NGT) has taken up a case initiated by a representation from Devendra Sharma concerning an illegal plastic manufacturing unit operated by M/s Sumit, Proprietor (Shri Pramod Sharma) in Indrapuri, Patna. The unit allegedly operates without a Consent to Establish and Consent to Operate from the Bihar State Pollution Control Board, engaging in thermal processing of plastic granules that generates toxic fumes, particulate matter, and noise pollution, violating siting criteria.

The NGT has ordered the impleadment of M/s Sumit and the Bihar State Pollution Control Board as respondents, issuing notices returnable within four weeks. This action follows the complainant's prior complaints and a closure order issued by the State Pollution Control Board, which the unit allegedly defied by resuming operations. The NGT's intervention aims to permanently close and seal the hazardous manufacturing factory.

What to do next

  1. Respond to NGT notices regarding the illegal plastic manufacturing unit.
  2. Cooperate with the Bihar State Pollution Control Board and NGT regarding closure and sealing orders.

Source document (simplified)

## Unlock Advanced Research with PRISM AI

Integrated with over 4 crore judgments and laws — designed for legal practitioners, researchers, students and institutions

Devendra Sharma vs State Of Bihar on 23 March, 2026

Item No.01 Court No.1

             BEFORE THE NATIONAL GREEN TRIBUNAL
                EASTERN ZONE BENCH, KOLKATA
         (THROUGH PHYSICAL HEARING WITH HYBRID MODE)

                Original Application No.64/2026/EZ

Devendra Sharma Applicant

                                   Versus

State of Bihar Respondents

Date of hearing: 23.03.2026
CORAM: HON'BLE MR. JUSTICE DINESH KUMAR SINGH, JUDICIAL MEMBER
HON'BLE MR. ISHWAR SINGH, EXPERT MEMBER

Applicant: None for the applicant.

                             ORDER 1.    One Mr. Devendra Sharma-complainant has sent us representation

dated 06.10.2025 against M/s Sumit, Proprietor through Shri Pramod

Sharma, who is involved in running illegal plastic manufacturing unit

within residential colony of Indrapuri, Patna without obtaining Consent

to Establish and Consent to Operate from the State Pollution Control

Board. The unit engages in thermal processing of plastic granules,

generating toxic fumes, particulate matters and high-decibel noise,

thereby causing severe air and noise pollution. The activity is being run

contrary to the siting criteria as well.

  1. The complainant had made a complaint to the State Pollution

Control Board on 20.10.2021, whereon the State Pollution Control Board

had issued proposed direction for closure on 06.02.2024 and later on a

Closure Order was issued on 31.07.2024. But despite that order, the

Project Proponent resumed the operations in April, 2025 in open

defiance. Therefore, this application has been moved with a prayer that

respondent/proponent directed to permanently close the illegal 1 hazardous plastic manufacturing factory and his premises should be

ordered to be sealed.

  1. The substantial question pertaining to environment has been made

out, therefore, we direct the Registry to implead M/s Sumit, Proprietor:

Shri Pramod Sharma as respondent no.1; Bihar State Pollution Control

Board as respondent no.2 and issue notices to them, returnable within

four weeks by all the modes.

  1. From the side of respondent no.2-Bihar State Pollution Control

Board, Ms. Amrita Pandey, learned counsel has already put in

appearance, hence, notice is dispensed with.

  1. Despite repeated calls, the applicant has not appeared today.

  2. Put up this matter for next consideration on 07.05.2026.

.........................................
Dinesh Kumar Singh, JM

                                                       ..............................

Ishwar Singh, EM
March 23rd, 2026
Original Application No.64/2026/EZ
MN 2

Source

Analysis generated by AI. Source diff and links are from the original.

Classification

Agency
NGT
Filed
March 23rd, 2026
Instrument
Enforcement
Legal weight
Binding
Stage
Final
Change scope
Substantive
Document ID
Original Application No.64/2026/EZ
Docket
OA/64/2026/EZ

Who this affects

Applies to
Manufacturers
Industry sector
3254 Pharmaceutical Manufacturing
Activity scope
Manufacturing Pollution Control
Geographic scope
IN IN

Taxonomy

Primary area
Environmental Protection
Operational domain
Compliance
Topics
Pollution Control Manufacturing Regulation

Get Environment alerts

Weekly digest. AI-summarized, no noise.

Free. Unsubscribe anytime.

Get alerts for this source

We'll email you when India National Green Tribunal publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.