IRO Reliability Standards Information Collection Extension Request

Favicon for www.federalregister.gov FR: Federal Energy Regulatory Commission
Published March 31st, 2026
Detected March 31st, 2026
Email

Summary

The Federal Energy Regulatory Commission is soliciting public comments on the extension of FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards). This information collection maintains existing reporting requirements with no changes. Comments are due April 30, 2026. The document references OMB Control No. 1902-0276 and Docket No. IC26-1-000.

What changed

FERC is seeking public comments on the extension of FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards) under the Paperwork Reduction Act. This is a routine extension of an existing approved information collection; there are no changes to the reporting requirements. The 60-day comment notice received no comments and has closed.

Affected entities should review the current IRO Reliability Standards information collection and submit comments to OMB by April 30, 2026, if desired. Entities may comment through the OMB website or submit copies to FERC via email or mail. No specific compliance actions are required as this extension maintains the status quo for existing reliability standard reporting obligations.

What to do next

  1. Review FERC-725Z IRO Reliability Standards information collection requirements
  2. Submit comments to OMB via reginfo.gov by April 30, 2026 if desired
  3. Send copies of comments to FERC at DataClearance@FERC.gov referencing Docket No. IC26-1-000

Source document (simplified)

Notice

You may be interested in this older document that published on 01/13/2026 with action 'Notice of information collection and request for comments.' View Document

Commission Information Collection Activities (FERC-725Z) Comment Request; Extension

A Notice by the Federal Energy Regulatory Commission on 03/31/2026

  • This document has a comment period that ends in 30 days.
    (04/30/2026) View Comment Instructions

  • PDF

  • Document Details

  • Document Dates

  • Table of Contents

- Related Documents

  • Public Comments
  • Regulations.gov Data

- Sharing

  • Print
  • Other Formats
  • Public Inspection Published Document: 2026-06204 (91 FR 15988) Document Headings ###### Department of Energy
Federal Energy Regulatory Commission
  1. [Docket No. IC26-1-000]

AGENCY:

Federal Energy Regulatory Commission.

ACTION:

Notice of information collection and request for comments.

SUMMARY:

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comments on the currently approved information collection, FERC-725Z (Mandatory Reliability Standards: ( printed page 15989) IRO Reliability Standards). There are no changes to the reporting requirements with this information collection. No comments were received on the 60-day notice that ended on March 16, 2026.

DATES:

Comments on the collection of information are due April 30, 2026.

ADDRESSES:

Send written comments on FERC-725Z to OMB through https://www.reginfo.gov/​public/​do/​PRA/​icrPublicCommentRequest?​ref_​nbr=​202603-1902-008. You can also visit https://www.reginfo.gov/​public/​do/​PRAMain and use the drop-down under “Currently under Review” to select the “Federal Energy Regulatory Commission” where you can see the open opportunities to provide comments. Comments should be sent within 30 days of publication of this notice.

Please submit a copy of your comments to the Commission via email to DataClearance@FERC.gov. You must specify the Docket No. (IC26-1-000) and the FERC Information Collection number (FERC-725Z) in your email. If you are unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery:

  • Mail via U.S. Postal Service Only: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426.
  • All other delivery methods: Federal Energy Regulatory Commission, Secretary of the Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Docket: To view comments and issuances in this docket, please visit https://elibrary.ferc.gov/​eLibrary/​search. Once there, you can also sign up for automatic notification of activity in this docket.

FOR FURTHER INFORMATION CONTACT:

Kayla Williams, (202) 502-6468. DataClearance@FERC.gov

SUPPLEMENTARY INFORMATION:

Title: FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards).

OMB Control No.: 1902-0276.

Type of Request: Extension to this currently approved information collection.

Abstract: On August 8, 2005, The Electricity Modernization Act of 2005, which is Title XII of the Energy Policy Act of 2005 (EPAct 2005), was enacted into law. [1 ] Under section 215 of the Federal Power Act (FPA) implemented in 18 CFR 40, the Commission requires a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, [2 ] which are subject to Commission review and approval. In 2006, the Commission established a process to select and certify an ERO and, subsequently, certified the North American Electric Reliability Corporation (NERC) as the ERO. [3 ]

The ERO develops proposed Reliability Standards [4 ] and, if approved by NERC, submits them to the Commission for review and approval. When the standards are approved by the Commission, the Reliability Standards become mandatory and must be enforced by the ERO, subject to Commission oversight.

NERC established the following IRO standards within FERC-725Z:

IRO-001-4 (Reliability Coordination—Responsibilities) purpose is to establish the responsibility of Reliability Coordinators to act or direct other entities to act. Applicable transmission operator, balancing authority, generator operator and distribution provider shall follow the operating instructions from their reliability coordinator or inform the reliability coordinator why they cannot comply.

IRO-002-7 (Reliability Coordination, Monitoring and Analysis) purpose is to provide system operators with the capabilities necessary to monitor and analyze data needed to perform their reliability functions. The requirements of IRO-002-7 define data exchange capabilities, testing functionality, notifications when those capabilities are not available, monitor status at facilities, and some personnel functions. IRO-002-7 does have a WECC Variance to develop a methodology that creates models for performing operational planning analyses and real-time assessments.

Currently effective IRO-009-2 applicable to reliability coordinators and the purpose of the standard is to prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring prompt action to prevent or mitigate instances of exceeding Interconnection Reliability Operating Limits (IROLs). The standard mandates that a Reliability Coordinator must have operating processes to prevent IROL exceedance and, if an exceedance is predicted, initiate those processes. It also requires them to mitigate exceedances when they occur and coordinate their actions with neighboring Reliability Coordinators in situations where there is a difference in IROLs.

Additionally, regarding data exchange, NERC cites Reliability Standard IRO-010-5 (Reliability Coordinator Data Specification and Collection) and its stated purpose of preventing instability, uncontrolled separation, or cascading outages “by ensuring the Reliability Coordinator has the data it needs to monitor and assess the operation of its Reliability Coordinator Area.” In IRO-010-5 required in the standard that the reliability coordinator must specify the data necessary for it to perform its operational planning analyses and provide the specifications to the entities from which it needs data who then must comply with the data request using a mutually agreeable format and security protocols.

IRO-014-3 purpose is to ensure that each Reliability Coordinator's operations are coordinated such that they will not adversely impact other Reliability Coordinator Areas and to preserve the reliability benefits of interconnected operations. IRO-014-3 standard requires Reliability Coordinators (RCs) to coordinate operating procedures and handle emergencies to ensure interconnected operations remain reliable and do not negatively impact neighboring RC areas.

IRO-017-1 (Outage Coordination) purpose is to ensure that outages are properly coordinated in the Operations Planning time horizon and Near-Term Transmission Planning Horizon. IRO-017-1, known as “Outage Coordination,” establishes requirements for coordinating generation and transmission outages to maintain bulk electric system reliability. Reliability coordinators, planning coordinators, balancing authorities, transmission owners and transmission planners are applicable entities for IRO-017-1. ( printed page 15990)

IRO-018-1(i) (Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities), submitted by North American Electric Reliability Corporation (NERC). IRO-018-1(i) mandates that Reliability Coordinators (RCs) possess real-time monitoring and analysis tools to ensure bulk electric system reliability. This standard, which includes requirements for RCs, aims to enhance system operators' awareness of monitoring tools and data quality. In this order, the Reliability Standards build on monitoring, real-time assessments and support effective situational awareness. The Reliability Standards accomplish this by requiring applicable entities to: (1) provide notification to operators of real-time monitoring alarm failures; (2) provide operators with indications of the quality of information being provided by their monitoring and analysis capabilities; and (3) address deficiencies in the quality of information being provided by their monitoring and analysis capabilities.

NERC observes that the performance of the requirements it cites is premised on the existence of data exchange capabilities, regardless of whether a separate requirement expressly requires the reliability coordinator to have data exchange capabilities in place.

In review this 725Z collection for the IRO Reliability Standards, the number of entities/respondents was checked and broken down into the appliable type of entity for each reliability standard. As we continue to combine various work projects associated with the 725Z collection there was an increase in the number of responses from 953 to 2,687. The increase is largely associated with capturing all the reliability standard applicable entities into this single collection and the single largest contributor was the addition of generator owners in reliability standard IRO-001-4. These adjustments in response count will provide a more accurate representation of all the entities under the 725Z collection. Staff looked at each reliability standard as its own unique project and in doing so eliminated the multiple entity count by making a more accurate representation of the number of responses.

Type of Respondents: Reliability coordinators (RC), Planning Coordinators (PC), Balancing authorities (BA), Transmission Owners (TO), Transmission Planners (TP), Transmission Operators (TOP), Distribution Planners (DP) are included entities for Estimate of Annual Burden: [5 ] The Commission estimates the changes in the annual public reporting burden and cost [6 ] as follows.

| Information collection
requirements | Number of
respondents &
type of entity | Annual
number of
responses per
respondent | Total number
of responses | Average burden hours & cost per response
($) | Total annual burden hours & total annual cost
($) | Total annual
burden cost |
| --- | --- | --- | --- | --- | --- | --- |
| | (1) 7 | (2) | (1) * (2) = (3) | (4) | (3) * (4) = (5) | (5)/(1) |
| IRO-001-4 | 12 (RC) | 1 | 12 | 24 hrs., $1,524.48 | 288 hrs., $18,293.76 | $1,524.48 |
| | 97 (BA) | 1 | 97 | 4 hrs., $254.08 | 388 hrs., $24,645.76 | 254.08 |
| | 1,314 (GO) | 1 | 1,314 | 4 hrs., $254.08 | 5,256 hrs., $333,861.12 | 254.08 |
| | 298 (DP) | 1 | 298 | 4 hrs., $254.08 | 1,192 hrs., $75,715.84 | 254.08 |
| | 166 (TOP) | 1 | 166 | 12 hrs., $762.24 | 1,992 hrs., $126,531.84 | 762.24 |
| IRO-002-7 | 12 (RC) | 1 | 12 | 24 hrs., $1,524.48 | 288 hrs., $18,293.76 | 1,524.48 |
| IRO-008-3 | 12 (RC) | 1 | 12 | 160 hrs., $10,163.2 | 1,920 hrs., $121,985.4 | 10,163.2 |
| IRO-009-2 | 12 (RC) | 1 | 12 | 12 hrs., $762.24 | 144 hrs., $9,146.88 | 762.24 |
| IRO-010-5 | 12 (RC) | 1 | 12 | 24 hrs., $1,524.48 | 288 hrs., $18,293.76 | 1,524.48 |
| IRO-014-3 | 12 (RC) | 1 | 12 | 12 hrs., $762.24 | 144 hrs., $9,146.88 | 762.24 |
| IRO-017-1 | 12 (RC) | 1 | 12 | 1,200 hrs., $76,224 | 14,400 hrs., $914,688 | 76,224 |
| | 62 (PC) | 1 | 62 | 96 hrs., $6,097.92 | 5,704 hrs., $362,318.08 | 6,097.92 |
| | 211 (TP) | 1 | 211 | 96 hrs., $6,097.92 | 20,256 hrs., $1,286,661.12 | 6,097.92 |
| | 337 (TO) | 1 | 337 | 8 hrs., $508.12 | 2,696 hrs., $171,249.92 | 508.12 |
| | 97 (BA) | 1 | 97 | 8 hr., $508.16 | 776 hrs., $49,291.52 | 508.16 |
| IRO-018-1(i) | 12 (RC) | 1 | 12 | 34 hrs., $2,159.68 | 408 hrs., $25,916.16 | 2,159.68 |
| Total for FERC-725Z | | | 2,678 | | 55,218 hrs., $3,538,599.16 | |
Comments: Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

Dated: March 26, 2026.

Debbie-Anne A. Reese,

Secretary.

Footnotes

1.

                     The Energy Policy Act of 2005 (EPAct), [Public Law 109-58](https://www.govinfo.gov/link/plaw/109/public/58), Title XII, Subtitle A, 119 Stat. 594, 941 (2005), codified at [16 U.S.C. 824o](https://www.govinfo.gov/link/uscode/16/824o) (2000).

Back to Citation 2.

                     The Federal Power Act (as modified by the EPAct) states “[t]he terms “reliability standard” means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities, including cybersecurity protection, and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity.”

Back to Citation 3.

                     North American Electric Reliability Corp., 116 FERC ¶ 61,062, order on reh'g and compliance, 117 FERC ¶ 61,126 (2006), order on compliance, 118 FERC ¶ 61,190, order on reh'g, 119 FERC ¶ 61,046 (2007), aff'd sub nom. *Alcoa Inc.* v. *FERC,* 564 F.3d 1342 (D.C. Cir. 2009).

Back to Citation 4.

                     The NERC Standard Processes Manual, Appendix 3A of the NERC Rules Of Procedure, (posted at *[https://www.nerc.com/​FilingsOrders/​us/​RuleOfProcedureDL/​SPM_​Clean_​Mar2019.pdf](https://www.nerc.com/FilingsOrders/us/RuleOfProcedureDL/SPM_Clean_Mar2019.pdf)*) describes the process for developing, modifying, withdrawing, or retiring a Reliability Standard.

Back to Citation 5.

                     Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. For further explanation of what is included in the information collection burden, refer to [5 Code of Federal Regulations 1320.3](https://www.ecfr.gov/current/title-5/section-1320.3).

Back to Citation 6.

                     The estimated hourly cost (salary plus benefits) is a combination of the following categories from the Bureau of Labor Statistics (BLS) website, May 2025 *[http://www.bls.gov/​oes/​current/​naics2_​22.htm](http://www.bls.gov/oes/current/naics2_22.htm):* 75% of the average of an Electrical Engineer (17-2071) $71.19/hr., × .75 = 53.3925 ($53.39-rounded) ($53.39/hour); and 25% of an Information and Record Clerk (43-4199) $40.51/hr., $40.51 × .25 = 10.1275 ($10.13 rounded) ($10.13/hour), for a total ($53.39 + $10.13 = $63.52/hour).

Back to Citation 7.

                     The NERC Compliance Registry, as of July 11, 2025, identifies the following NERC unique U.S. entities that are subject to mandatory compliance with Reliability Standard IRO-001-4, IRO-002-7, IRO-008-3, IRO-009-2, IRO-010-5, IRO-04-3, IRO-017-1, IRO-018-1(i). The number of respondents below is based on an estimate of the NERC compliance registry US only Unique Entities; for balancing authority, transmission operator (TOP), transmission Planners (TP), distribution planners (DP), generator owner (GO) and reliability coordinator (RC).

Back to Citation [FR Doc. 2026-06204 Filed 3-30-26; 8:45 am]

BILLING CODE 6717-01-P

Published Document: 2026-06204 (91 FR 15988)

Named provisions

FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards)

Classification

Agency
Energy Department
Published
March 31st, 2026
Comment period closes
April 30th, 2026 (30 days)
Compliance deadline
April 30th, 2026 (30 days)
Instrument
Consultation
Legal weight
Non-binding
Stage
Consultation
Change scope
Minor
Document ID
91 FR 15988 / Docket No. IC26-1-000
Docket
Docket No. IC26-1-000

Who this affects

Applies to
Energy companies
Industry sector
2210 Electric Utilities
Activity scope
Electricity Reliability Reporting Information Collection
Geographic scope
United States US

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Electricity Reliability Standards Information Collection

Get Energy alerts

Weekly digest. AI-summarized, no noise.

Free. Unsubscribe anytime.

Get alerts for this source

We'll email you when FR: Federal Energy Regulatory Commission publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.