Changeflow GovPing Energy ALLETE Inc Hydroelectric Relicensing Applicatio...
Routine Notice Added Final

ALLETE Inc Hydroelectric Relicensing Application - Sylvan Project

Favicon for www.regulations.gov Regs.gov: Federal Energy Regulatory Commission
Published
Detected
Email

Summary

FERC published notice that ALLETE Inc filed a new major license application for the Sylvan Hydroelectric Project (P-2454) on the Crow Wing River in Cass, Crow Wing, and Morrison Counties, Minnesota. The project has three 600-kilowatt generating units with a total installed capacity of 1.8 megawatts. The application is available for public inspection via the Commission's eLibrary system.

What changed

ALLETE Inc submitted a new major license application to FERC for the Sylvan Hydroelectric Project, a run-of-river facility with 1.8 MW total capacity and estimated annual energy production of 9,963 megawatt hours. The application was filed pursuant to the Federal Power Act. FERC has established a preliminary schedule with a potential deficiency letter by July 2026 and notice of acceptance by September 2026.\n\nInterested parties including government agencies, Native American tribes, conservation groups, and local stakeholders may view the application via FERC's eLibrary system and file interventions, comments, or requests for rehearing. Final amendments to the application must be filed within 30 days of the notice of ready for environmental analysis.

What to do next

  1. Monitor FERC eLibrary for deficiency letters and additional information requests
  2. File interventions or comments before the comment period closes
  3. Register for FERC Online notifications for updates on the proceeding

Archived snapshot

Apr 8, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Content

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

a. Type of Application: New Major License.

b. Project No.: 2454-088.

c. Date filed: March 24, 2026.

d. Applicant: ALLETE, Inc. (ALLETE).

e. Name of Project: Sylvan Hydroelectric Project (project).

f. Location: The project is located on the Crow Wing River in Cass, Crow Wing, and Morrison Counties, Minnesota.

g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

h. Applicant Contact: Mr. Greg Prom, Senior Environmental Compliance Specialist, Minnesota Power/ALLETE, Inc., 30 West Superior Street, Duluth,
MN 55802-2093; Phone at (218) 355-3191 or email at gprom@allete.com.

i. FERC Contact: David Graefe at (202) 502-6137; or email at david.graefe@ferc.gov.

j. This application is not ready for environmental analysis at this time.

k. Project Description: the project consists of: (1) a 1,211-acre reservoir; (2) a 78.0-foot-long left earth embankment with a concrete core wall;
(3) a powerhouse with three 600-kilowatt generating units with a total installed capacity of 1.8 megawatts; (4) a 243.8-foot-long
spillway with four vertical slide gates and two inflatable rubber dams; (5) a 41.0-foot-long right earth embankment with a
concrete core wall; (6) a 730.0-foot-long earth embankment, approximately 4 to 6 feet tall; (7) an 830.0-foot-long earth embankment,
about 4 to 6 feet tall with some sections up to 9 feet tall, with an auxiliary spillway; (8) an approximately 1,211-acre reservoir;
and (9) appurtenant facilities.

The project is operated in a run-of-river mode with an estimated annual energy production of approximately 9,963 megawatt
hours. ALLETE proposes to continue to operate the project in a run-of-river mode.

l. In addition to publishing the full text of this notice in the
Federal Register
, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via the internet through the Commission's Home Page (http://www.ferc.gov), using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access
the document (P-2454). For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).

You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC
Online Support.

m. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact
the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov.

n. Procedural Schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made
as appropriate.

| Milestone | Target |
| --- | --- |
| Deficiency Letter (if necessary) | July 2026. |
| Additional Information Request (if necessary) | July 2026. |
| Notice of Acceptance/Notice of Ready for Environmental Analysis | September 2026. |
o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the
notice of ready for environmental analysis.

(Authority: 18 CFR 2.1)

Dated: April 2, 2026. Carlos D. Clay, Deputy Secretary. [FR Doc. 2026-06706 Filed 4-6-26; 8:45 am] BILLING CODE 6717-01-P

Download File

Download

Get daily alerts for Regs.gov: Federal Energy Regulatory Commission

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from FERC.

What's AI-generated?

The plain-English summary, classification, and "what to do next" steps are AI-generated from the original text. Cite the source document, not the AI analysis.

Last updated

Classification

Agency
FERC
Published
April 2nd, 2026
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor
Document ID
FR Doc. 2026-06706
Docket
P-2454 FERC-2026-1948-0001

Who this affects

Applies to
Energy companies Government agencies Nonprofits
Industry sector
2210 Electric Utilities
Activity scope
Hydroelectric power generation License applications Federal Power Act compliance
Geographic scope
United States US

Taxonomy

Primary area
Energy
Operational domain
Regulatory Affairs
Topics
Environmental Protection Banking Government Contracting

Get alerts for this source

We'll email you when Regs.gov: Federal Energy Regulatory Commission publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.