Changeflow GovPing Energy 2028 Resource Pool-Parker-Davis Project propose...
Routine Notice Added

2028 Resource Pool-Parker-Davis Project proposed power allocations

Favicon for www.federalregister.gov FR: Western Area Power Administration
Detected March 14th, 2026
Email

Summary

2028 Resource Pool-Parker-Davis Project proposed power allocations

Source document (simplified)

Legal Status This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.

The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to About the Federal Register on NARA's archives.gov.

The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.

Legal Status

Notice

2028 Resource Pool-Parker-Davis Project, Proposed Power Allocations

A Notice by the Western Area Power Administration on 09/03/2025

  • 1.

1.

1 comment has
been received at Regulations.gov.

Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.

| Docket Title | Document ID | Comments | |
| --- | --- | --- | --- |
| Proposed Power Allocations: 2028 Resource Pool—Parker-Davis Project | WAPA-2025-0002-0001 | 1 | |
Enhanced Content - Public Comments
- Regulations.gov Data Enhanced Content - Regulations.gov Data

FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.

Proposed Power Allocations: 2028 Resource Pool—Parker-Davis Project

Docket ID WAPA-2025-0002 Supporting Documents No supporting documents available Enhanced Content - Regulations.gov Data

- Sharing Enhanced Content - Sharing Shorter Document URL https://www.federalregister.gov/d/2025-16885 Email Email this document to a friend Enhanced Content - Sharing

  • Print Enhanced Content - Print
  • Document Statistics Enhanced Content - Document Statistics Document page views are updated periodically throughout the day and are cumulative counts for this document. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.

Page views 81
as of
03/14/2026 at 2:15 pm EDT Enhanced Content - Document Statistics
- Other Formats Enhanced Content - Other Formats This document is also available in the following formats:

JSON Normalized attributes and metadata XML Original full text XML MODS Government Publishing Office metadata More information and documentation can be found in our developer tools pages.

Enhanced Content - Other Formats
- Public Inspection Public Inspection This PDF is FR Doc. 2025-16885 as it appeared on Public Inspection on
09/02/2025 at 8:45 am.

It was viewed
7
times while on Public Inspection.

If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.

Public Inspection
Published Document: 2025-16885 (90 FR 42576) This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Document Headings Document headings vary by document type but may contain
the following:

  1. the agency or agencies that issued and signed a document
  2. the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to
  3. the agency docket number / agency internal file number
  4. the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details.
Department of Energy
Western Area Power Administration

AGENCY:

Western Area Power Administration, DOE.

ACTION:

Notice of Parker-Davis Project proposed 2028 resource pool power allocations and request for comment.

SUMMARY:

Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy (DOE), announces its Parker-Davis Project (P-DP) proposed 2028 resource pool power allocations. WAPA developed the proposed power allocations under its Final 2028 P-DP Power Marketing Plan and Call for 2028 Resource Pool Applications (Final 2028 Plan), published in the Federal Register on November 12, 2024. Applications received by the January 31, 2025, deadline were considered for a proposed resource pool power allocation. This notice provides a list of the allottees and seeks comments from the public on the proposed resource pool allocations.

DATES:

The comment period on this notice of proposed power allocations begins today and ends October 20, 2025. WAPA will accept comments by email or delivered by common carrier such as U.S. mail. WAPA reserves the right not to consider comments received or postmarked after the close of the comment period.

A single public information and comment forum about the proposed 2028 resource pool power allocations will be held virtually on October 3, 2025, beginning at 1 p.m. MST and concluding when comments are complete, or no later than 4 p.m. MST. Information for the virtual meeting may be found on WAPA's Desert Southwest Region (DSW) website at least 14 days prior to the event at www.wapa.gov/​about-wapa/​regions/​dsw/​pdpremarketing.

Oral and written comments may be presented at the public comment forum. A transcript of oral comments made at this forum will be available from the court reporter and on DSW's website identified previously. WAPA will accept written comments at any time during the comment period.

After all public comments have been considered, WAPA will publish the P-DP Final 2028 Resource Pool Power Allocations in the Federal Register.

ADDRESSES:

Submit written comments about the proposed 2028 resource pool power allocations to: Scott R. Lund, Regional Manager, Desert Southwest Region, Western Area Power Administration, P.O. Box 6457, Phoenix, AZ 85005-6457, or email: pdp-remarketing@wapa.gov. All documentation developed or retained by WAPA for the purpose of developing the proposed 2028 resource pool power allocations is available for inspection and copying at the DSW Regional Office, located at 615 South 43rd Avenue, Phoenix, Arizona 85009. Many of these documents and supporting information are also available on DSW's website at: www.wapa.gov/​about-wapa/​regions/​dsw/​pdpremarketing.

FOR FURTHER INFORMATION CONTACT:

Jennifer Henn, Power Marketing Advisor, Desert Southwest Region, Western Area Power Administration, phone: (602) 812-2348, or email: pdp-remarketing@wapa.gov.

SUPPLEMENTARY INFORMATION:

Background

WAPA published the Final 2028 P-DP Power Marketing Plan (Final 2028 Plan) on November 12, 2024 (89 FR 88999) to define how WAPA will market hydropower from the P-DP beginning October 1, 2028, and ending September 30, 2048. The current marketing plan and contracts expire on September 30, 2028. As part of the Final 2028 Plan, WAPA adjusted each existing preference contractor's Contract Rate of Delivery (CROD) by applying a pro rata share of an anticipated 3,750-kilowatt (kW) capacity increase at Davis Dam Unit 3 and then reduced the adjusted CROD by two percent to create a resource pool. The resulting resource pool included 5,259 kW of summer season capacity, including 748 kW of summer season withdrawable capacity, and 4,041 kW of winter season capacity, including 146 kW of winter season withdrawable capacity, for allocation to new allottees. Allocations from the resource pool were offered to entities using the Eligibility Criteria and Allocation Criteria for Resource Pool Allocations described in the Final 2028 Plan. WAPA would return excess resource pool capacity to existing contractors by pro rata share if necessary. Per the Final 2028 Plan, resource pool applications were due by January 31, 2025.

Proposed 2028 Resource Pool Allocations

In response to the call for resource pool applications, WAPA received four applications for the 2028 resource pool. WAPA used a two-step process to determine proposed power allocations from the 2028 resource pool. First, ( printed page 42577) WAPA determined which applicants met the Eligibility Criteria as defined in the Final 2028 Plan. Next, WAPA used its discretion to determine the amount of the proposed allocations with consideration given to applicant historical load and consistency with the P-DP 2008 resource pool power allocations (71 FR 40503).

WAPA determined that two of the four applicants did not meet the Eligibility Criteria requirements and therefore were ineligible to receive an allocation. One application came from a preference entity that has an existing Federal hydropower contract with WAPA. Therefore, as addressed in responses to comments in the Final 2028 Plan, it does not qualify for the P-DP 2028 resource pool. The second application came from an entity that does not meet the utility status requirement. Electric utility status means the applicant has responsibility to meet load growth, has a distribution system, and is ready, willing, and able to purchase P-DP Federal power from WAPA on a wholesale basis for resale to retail customers. The applicant does not have a distribution system and, as a result, does not qualify for the P-DP 2028 resource pool.

WAPA is proposing allocations for the two entities that met all Eligibility Criteria requirements. The proposed 2028 resource pool allocations are preliminary and may change based on comments received. After reviewing and considering comments, WAPA will publish a notice of Final 2028 Resource Pool Allocations in the Federal Register and respond to comments.

The proposed 2028 resource pool allottees and proposed capacity allocations for firm electric service (FES) are listed in the following table:

| Allottees | Proposed Parker-Davis Project post-2028 resource pool capacity allocations | | | | | |
| --- | --- | | | | | |
| Summer | | | Winter | | | |
| Non-withdrawable FES allocation
(kW) | Withdrawable FES allocation
(kW) | Total FES
allocation
(kW) | Non-withdrawable FES allocation
(kW) | Withdrawable FES allocation
(kW) | Total FES
allocation
(kW) | |
| Industry Public Utilities | 703 | 304 | 1,007 | 936 | 73 | 1,009 |
| San Pasqual Band of Indians | 703 | 304 | 1,007 | 936 | 73 | 1,009 |
| Total 2028 Resource Pool | 1,406 | 608 | 2,014 | 1,872 | 146 | 2,018 |
WAPA's proposed resource pool allocations will not use the entire resource pool capacity. After adjusting each existing P-DP contractor's CROD by applying the anticipated 3,750 kW increase in marketable capacity, reducing the adjusted CROD by two percent, and then redistributing remaining resource pool capacity to existing contractors by pro rata share, the net effect to each existing contractor's current CROD would be an increase of approximately 0.67 percent in the summer and approximately 0.87 percent in the winter. The proposed CROD adjustments for existing contractors are posted on DSW's website at www.wapa.gov/​about-wapa/​regions/​dsw/​pdpremarketing. The existing CROD for Priority Use Power contractors will remain unchanged.

All allocations, including the new resource pool allocations, will be based on P-DP marketable capacity deemed to be available effective October 1, 2028.

Contracting Process

WAPA will apply the principles of the Power Marketing Initiative (PMI) (10 CFR 905.30 through 905.37) to P-DP for the forthcoming marketing period. Energy associated with the new resource pool will be based on a pro rata share of the allottee's seasonal CROD and published in the form of Quarterly Energy, as defined in the Final 2028 Plan.

WAPA solely determines the terms, conditions, rates, or charges of its power contracts. Each allottee is responsible for obtaining transmission arrangements beyond WAPA's system for delivery of Federal power to the allottee's load. WAPA must receive a letter of commitment from each allottee's serving utility or transmission provider by January 31, 2028, confirming the allottee will be able to receive the benefit of WAPA's 2028 resource pool, unless otherwise agreed to in writing by WAPA. Upon request, WAPA may assist an allottee in obtaining transmission arrangements for delivery of power.

Allottees will be required to execute an electric service contract no later than May 31, 2028, unless otherwise agreed to in writing by WAPA. Electric service contracts will be effective upon WAPA's signature, and service will begin on October 1, 2028, and continue through September 30, 2048.

Legal Authorities

The Final 2028 Plan was established under the Department of Energy Organization Act (42 U.S.C. 7101, et seq.); the Reclamation Act of June 17, 1902 (ch. 1093, 32 Stat. 388), as amended and supplemented by subsequent enactments, particularly section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and other acts specifically applicable to the projects involved. Allocating power from the resource pool falls within the Final 2028 Plan and is covered by this authority.

Regulatory Procedure Requirements

Environmental Compliance

WAPA has determined this proposed action fits within the following categorical exclusions listed in appendix B of 10 CFR part 1021: B4.1 (Contracts, policies, and marketing and allocation plans for electric power) and B4.4 (Power marketing services and activities). Categorically excluded projects and activities do not require preparation of either an environmental impact statement or an environmental assessment. [1 ] A copy of the categorical exclusion determination is available on WAPA's website under the categorical exclusion 2024 menu at www.wapa.gov/​about-wapa/​regions/​dsw/​environment.

Determination Under Executive Order 12866

WAPA has an exemption from centralized regulatory review under Executive Order 12866; accordingly, no clearance of this Federal Register notice by the Office of Management and Budget is required.

Signing Authority

This document of the Department of Energy was signed on August 28, 2025, ( printed page 42578) by Tracey A. LeBeau, Administrator, Western Area Power Administration. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register.

Signed in Washington, DC, on August 29, 2025.

Jennifer Hartzell,

Alternate Federal Register Liaison Officer, U.S. Department of Energy.

Footnotes

1.

                     The determination was done in compliance with the National Environmental Policy Act (NEPA) ([42 U.S.C. 4321](https://www.govinfo.gov/link/uscode/42/4321) *et seq.*) and DOE's NEPA Implementing Procedures ([10 CFR part 1021](https://www.ecfr.gov/current/title-10/part-1021)).

Back to Citation [FR Doc. 2025-16885 Filed 9-2-25; 8:45 am]

BILLING CODE 6450-01-P

Published Document: 2025-16885 (90 FR 42576)

Get alerts for this source

We'll email you when FR: Western Area Power Administration publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.