Changeflow GovPing Energy $2,500 penalty against Provident Electric for g...
Urgent Enforcement Added Final

$2,500 penalty against Provident Electric for gas violations

Favicon for www.utc.wa.gov WA UTC Recent Orders
Filed March 3rd, 2026
Detected April 1st, 2026
Email

Summary

The Washington Utilities and Transportation Commission issued a $2,500 penalty assessment against Provident Electric Incorporated following a staff investigation for alleged violations of RCW 19.122, Washington's underground utility damage prevention law. The case (Docket DG-260135) was filed on March 3, 2026, and is being handled as a formal enforcement action under the Call Before You Dig Natural Gas program.

What changed

The WA UTC assessed a $2,500 penalty against Provident Electric Incorporated for violating RCW 19.122, which governs underground utility damage prevention. The staff investigation identified the company violated Washington's "Call Before You Dig" requirements for natural gas infrastructure. This is a formal enforcement action (Docket DG-260135) under the UTC's jurisdiction over natural gas utilities.

Provident Electric must respond to the penalty assessment through the formal UTC process. The company should review its excavation and damage prevention practices to ensure compliance with RCW 19.122. Other natural gas operators and excavators in Washington should verify their damage prevention procedures align with current legal requirements to avoid similar enforcement actions.

What to do next

  1. Respond to the UTC penalty assessment through the formal case process
  2. Review excavation and damage prevention procedures for RCW 19.122 compliance
  3. Ensure all personnel follow Call Before You Dig protocols for natural gas infrastructure

Penalties

$2,500 assessment

Source document (simplified)

  1. Home
  2. UTC Case Docket Detail Page # UTC Case Docket Details

Docket Number 260135

| Docket Number | DG-260135 |
| --- | --- |
| Advice | |
| Company | Provident Electric Incorporated |
| DBA | |
| Filing Type | Assessment (penalty) |
| Industry (Code) | Call Before You Dig Natural Gas (812) |
| Status | Formal |
| Lead Staff | Hagen, Joice (UTC) |
| Filed Date | 03/03/2026 |
| Effective Date | N/A |
| Summary | Staff investigation of Provident Electric for alleged violation of RCW 19.122 |

Event History

  • 03/03/2026 -- Pending
  • 03/03/2026 -- Open

Named provisions

RCW 19.122 - Underground Utilities

Source

Analysis generated by AI. Source diff and links are from the original.

Classification

Agency
WA UTC
Filed
March 3rd, 2026
Instrument
Enforcement
Legal weight
Binding
Stage
Final
Change scope
Substantive
Document ID
Docket DG-260135
Docket
DG-260135

Who this affects

Applies to
Energy companies
Industry sector
2210 Electric Utilities
Activity scope
Natural Gas Safety Damage Prevention
Geographic scope
Washington US-WA

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Consumer Protection Pipeline Safety

Get Energy alerts

Weekly digest. AI-summarized, no noise.

Free. Unsubscribe anytime.

Get alerts for this source

We'll email you when WA UTC Recent Orders publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.