Building Control (Amendment No. 2) Regulations 2026

Favicon for www.singaporelawwatch.sg Singapore Legislation Updates
Published
Detected
Email

Summary

Singapore's Ministry of National Development has amended the Building Control Regulations 2003 via the Building Control (Amendment No. 2) Regulations 2026 (No. S 222), effective 17 April 2026. The amendment modifies the Second Schedule (fee provisions) by inserting new sub-paragraph (f) and a new paragraph 7A establishing a tiered fee formula for building works involving alterations, additions, or repairs of general buildings carried out in connection with specified buildings in a development. The new fee formula comprises three components: A ($400/storey for non-residential general buildings), B ($200/storey for other general buildings), and C ($400/specified building not abutting or connected to general buildings), plus additional fees for floor area increases.

Published by MND Singapore on sso.agc.gov.sg . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

The Building Control (Amendment No. 2) Regulations 2026 amends the Second Schedule of the Building Control Regulations 2003 (G.N. No. S 666/2003). Part 1 paragraph 1(2) and (3) are updated to reference new paragraphs 7A and 10AA. Part 2 paragraph 2 introduces new sub-paragraph (f) establishing that building works consisting of alterations, additions, or repairs of general buildings carried out in connection with specified buildings in a development are subject to a fee calculated under the newly inserted paragraph 7A.\n\nParagraph 7A introduces a detailed fee formula (A + B + C) where A is $400/storey for non-residential general buildings, B is $200/storey for other general buildings, and C is $400/specified building not abutting or connected to general buildings. Sub-paragraph (3) adds supplemental fees for floor area increases: $400 per 100m² of below-sublevel aggregate increases, plus $300 per 100m² for the first 2,500m² of above-sublevel aggregate specified area and $270 per 100m² thereafter. Developers and building owners undertaking such mixed development works must recalculate applicable fees to ensure compliance with the new schedule effective 17 April 2026.

What to do next

  1. Review new fee formula 7A in the Second Schedule
  2. Recalculate applicable fees for building works involving alterations, additions, or repairs of general buildings in connection with specified buildings
  3. Account for additional fees when floor area increases apply to general or specified buildings

Archived snapshot

Apr 17, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Building Control (Amendment No. 2) Regulations 2026 Status:
Published in Subsidiary Legislation Supplement

on 15 Apr 2026

-

No. S 222
| Building Control Act 1989 |

| Building Control
(Amendment No. 2) Regulations 2026 |

| In exercise of the powers conferred by section 49 of the Building Control Act 1989, the Minister for National Development makes the following Regulations: |

| Citation and commencement |

| 1. These Regulations are the Building Control (Amendment No. 2) Regulations 2026 and come into operation on 17 April 2026. |

| Amendment of Second Schedule |
2. In the Building Control Regulations 2003 (G.N. No. S 666/2003), in the Second Schedule —
| (a) | in Part 1, in paragraph 1(2), replace “and 9” with “, 7A, 9 and 10AA”; |
| (b) | in Part 1, in paragraph 1(3), replace “and 10” with “, 7A, 10 and 10AA”; |
| (c) | in Part 2, in paragraph 2(c), (d)(i) and (e), after “such building works”, insert “but excluding the building works described in sub‑paragraph (f)”; |
| (d) | in Part 2, in paragraph 2(e), replace the full‑stop at the end with a semi‑colon; |
| (e) | in Part 2, in paragraph 2, after sub‑paragraph (e), insert —
| “ (f) | where the building works consist of the alteration, addition or repair of one or more general buildings referred to in sub‑paragraph (c) or (d), carried out in connection with the alteration, addition or repair of one or more specified buildings in a development (including site formation works connected with or carried out for the purpose of such building works), the fee calculated in accordance with paragraph 7A. ”; | | “ (f) | where the building works consist of the alteration, addition or repair of one or more general buildings referred to in sub‑paragraph (c) or (d), carried out in connection with the alteration, addition or repair of one or more specified buildings in a development (including site formation works connected with or carried out for the purpose of such building works), the fee calculated in accordance with paragraph 7A. ”; |
| “ (f) | where the building works consist of the alteration, addition or repair of one or more general buildings referred to in sub‑paragraph (c) or (d), carried out in connection with the alteration, addition or repair of one or more specified buildings in a development (including site formation works connected with or carried out for the purpose of such building works), the fee calculated in accordance with paragraph 7A. ”; |
| (f) | in Part 2, after paragraph 7, insert —
| “ Fee for alterations, additions or repairs of general buildings in connection with alterations, additions or repairs of specified buildings |
7A.— (1)  The fee mentioned in paragraph 2(f) in relation to the building works for the alteration, addition or repair of one or more general buildings and one or more specified buildings in a development mentioned in that paragraph is a sum calculated in accordance with the formula A + B + C, where —
| (a) | A is a sum calculated at a rate of $400 for every storey in every general building in the development that is a non‑residential general building in respect of which the building works are to be carried out; |
| (b) | B is a sum calculated at a rate of $200 for every storey in every other general building in the development in respect of which the building works are to be carried out; and |
| (c) | C is a sum calculated at a rate of $400 for every specified building in the development in respect of which the building works are to be carried out, which neither abuts nor is connected to any storey of any general building in the development in respect of which the building works are also to be carried out. |

| (2)  To avoid doubt, for the purposes of sub‑paragraph (1), where there are no building works in respect of a general building as are mentioned in sub‑paragraph (1)(a) or (b) or in respect of a specified building as are mentioned in sub‑paragraph (1)(c), A, B or C (as the case may be) is zero. |
(3)  Where the alteration or addition involves increasing the floor area of one or more of the general buildings or the area of the plan view of one or more of the specified buildings in the development, then, in addition to the fee specified in sub‑paragraph (1), there must be paid a fee that is computed in accordance with the formula D + E, where —(a)D is a sum calculated at a rate of $400 for every 100 m 2 or part thereof of the aggregate of the following:
| (i) | the aggregate of the increase in the floor areas of all the storeys of every such general building below sublevel; |
| (ii) | the aggregate of the increase in the areas of the plan views of every such specified building at below sublevel; and |
(b)E is a sum calculated at a rate of —
| (i) | $300 for every 100 m 2 or part thereof of the first 2,500 m 2; and |
| (ii) | $270 for every subsequent 100 m 2 or part thereof, |

| of the aggregate specified area. |
(4)  In sub‑paragraph (3)(b), the aggregate specified area is computed in accordance with the formula F + G, where —
| (a) | F is the aggregate of the increase in the floor areas of all the storeys of every general building in the development mentioned in sub‑paragraph (3) above sublevel; and |
| (b) | G is the aggregate of the increase in the area of the plan view at above sublevel in respect of every specified building in the development mentioned in sub‑paragraph (3). |
(5)  In sub‑paragraph (4)(b), the increase in the area of the plan view at above sublevel in respect of a specified building is computed in accordance with the formula H − I, where —
| (a) | H is the increase in the area of the plan view of the specified building; and |
| (b) | I is the increase in the area of the plan view of the specified building at below sublevel, |

| or zero, whichever is greater. ”; | | “ Fee for alterations, additions or repairs of general buildings in connection with alterations, additions or repairs of specified buildings | (a) | A is a sum calculated at a rate of $400 for every storey in every general building in the development that is a non‑residential general building in respect of which the building works are to be carried out; | (b) | B is a sum calculated at a rate of $200 for every storey in every other general building in the development in respect of which the building works are to be carried out; and | (c) | C is a sum calculated at a rate of $400 for every specified building in the development in respect of which the building works are to be carried out, which neither abuts nor is connected to any storey of any general building in the development in respect of which the building works are also to be carried out. | (2)  To avoid doubt, for the purposes of sub‑paragraph (1), where there are no building works in respect of a general building as are mentioned in sub‑paragraph (1)(a) or (b) or in respect of a specified building as are mentioned in sub‑paragraph (1)(c), A, B or C (as the case may be) is zero. | (i) | the aggregate of the increase in the floor areas of all the storeys of every such general building below sublevel; | (ii) | the aggregate of the increase in the areas of the plan views of every such specified building at below sublevel; and | (i) | $300 for every 100 m 2 or part thereof of the first 2,500 m 2; and | (ii) | $270 for every subsequent 100 m 2 or part thereof, | of the aggregate specified area. | (a) | F is the aggregate of the increase in the floor areas of all the storeys of every general building in the development mentioned in sub‑paragraph (3) above sublevel; and | (b) | G is the aggregate of the increase in the area of the plan view at above sublevel in respect of every specified building in the development mentioned in sub‑paragraph (3). | (a) | H is the increase in the area of the plan view of the specified building; and | (b) | I is the increase in the area of the plan view of the specified building at below sublevel, | or zero, whichever is greater. ”; |
| of the aggregate specified area. |
| or zero, whichever is greater. ”; |
| (g) | in Part 3, in paragraph 8(a) and (b), after “in respect”, insert “only”; |
| (h) | in Part 3, in paragraph 8(a), delete “or” at the end; |
| (i) | in Part 3, in paragraph 8(b), replace the full‑stop at the end with “; or”; |
| (j) | in Part 3, in paragraph 8, after sub‑paragraph (b), insert —
| “ (c) | where the building works are in respect of one or more general buildings and one or more specified buildings in a development, the fee specified in paragraph 10AA. ”; and | | “ (c) | where the building works are in respect of one or more general buildings and one or more specified buildings in a development, the fee specified in paragraph 10AA. ”; and |
| “ (c) | where the building works are in respect of one or more general buildings and one or more specified buildings in a development, the fee specified in paragraph 10AA. ”; and |
| (k) | in Part 3, after paragraph 10, insert —
| “ Departures and deviations from approved plans for general buildings and specified buildings in a development |
10AA.— (1)  The fee mentioned in paragraph 8(c) in relation to the proposed departure or deviation in respect of one or more general buildings and one or more specified buildings in a development mentioned in that paragraph is an amount computed in accordance with the formula A + B, where —
| (a) | A is a sum calculated at a rate of $200 for every storey in every general building in the development, in respect of which the departure or deviation is to be made; and |
| (b) | B is a sum calculated at a rate of $200 for every specified building in the development, in respect of which the departure or deviation is to be made, which neither abuts nor is connected to any storey of any general building in the development in respect of which the departure or deviation is also to be made. |

| (2)  To avoid doubt, for the purposes of sub‑paragraph (1), where there is no such departure or deviation in respect of a specified building as mentioned in sub‑paragraph (1)(b), B is zero. |
(3)  Where any departure or deviation results in an increase of the floor area of one or more of the general buildings or the area of the plan view of one or more of the specified buildings in the development, then, in addition to the fee specified in sub‑paragraph (1), there must be paid a fee that is computed in accordance with the formula C + D, where —(a)C is a sum calculated at a rate of $400 for every 100 m 2 or part thereof of the aggregate of the following:
(b)D is a sum calculated at a rate of —

| of the aggregate specified area. |
(4)  In sub‑paragraph (3)(b), the aggregate specified area is computed in accordance with the formula E + F, where —
| (a) | E is the aggregate of the increase in the floor areas of all the storeys of every general building in the development mentioned in sub‑paragraph (3) above sublevel; and |
| (b) | F is the aggregate of the increase in the area of the plan view at above sublevel in respect of every specified building in the development mentioned in sub‑paragraph (3). |
(5)  In sub‑paragraph (4)(b), the increase in the area of the plan view at above sublevel in respect of a specified building is computed in accordance with the formula G − H, where —
| (a) | G is the increase in the area of the plan view of the specified building; and |
| (b) | H is the increase in the area of the plan view of the specified building at below sublevel, |

| or zero, whichever is greater. ”. | | “ Departures and deviations from approved plans for general buildings and specified buildings in a development | (a) | A is a sum calculated at a rate of $200 for every storey in every general building in the development, in respect of which the departure or deviation is to be made; and | (b) | B is a sum calculated at a rate of $200 for every specified building in the development, in respect of which the departure or deviation is to be made, which neither abuts nor is connected to any storey of any general building in the development in respect of which the departure or deviation is also to be made. | (2)  To avoid doubt, for the purposes of sub‑paragraph (1), where there is no such departure or deviation in respect of a specified building as mentioned in sub‑paragraph (1)(b), B is zero. | (i) | the aggregate of the increase in the floor areas of all the storeys of every such general building below sublevel; | (ii) | the aggregate of the increase in the areas of the plan views of every such specified building at below sublevel; and | (i) | $300 for every 100 m 2 or part thereof of the first 2,500 m 2; and | (ii) | $270 for every subsequent 100 m 2 or part thereof, | of the aggregate specified area. | (a) | E is the aggregate of the increase in the floor areas of all the storeys of every general building in the development mentioned in sub‑paragraph (3) above sublevel; and | (b) | F is the aggregate of the increase in the area of the plan view at above sublevel in respect of every specified building in the development mentioned in sub‑paragraph (3). | (a) | G is the increase in the area of the plan view of the specified building; and | (b) | H is the increase in the area of the plan view of the specified building at below sublevel, | or zero, whichever is greater. ”. |
| of the aggregate specified area. |
| or zero, whichever is greater. ”. |
[G.N. Nos. S 598/2004; S 549/2005; S 478/2007; S 495/2007; S 54/2008; S 250/2008; S 643/2008; S 4/2011; S 591/2012; S 665/2013; S 287/2016; S 443/2017; S 709/2017; S 808/2018; S 101/2020; S 695/2020; S 579/2022; S 905/2022; S 302/2023; S 797/2023; S 854/2023; S 415/2024; S 1003/2024; S 218/2025; S 616/2025; S 631/2025; S 134/2026]
| Made on 13 April 2026. |

| LOH NGAI SENG |
Permanent Secretary,
Ministry of National Development,
Singapore.
| [ND202/01-007; AG/LEGIS/SL/29/2020/2] |

| (To be presented to Parliament under section 52 of the Building Control Act 1989). |

Named provisions

New sub-paragraph (f) Paragraph 7A - Fee for alterations, additions or repairs of general buildings in connection with alterations, additions or repairs of specified buildings Formula A + B + C Floor area increase fees Sub-paragraph (3)(a) - Below sublevel fees Sub-paragraph (3)(b) - Above sublevel fees

Get daily alerts for Singapore Legislation Updates

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from MND Singapore.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
MND Singapore
Published
April 17th, 2026
Compliance deadline
April 17th, 2026 (today)
Instrument
Rule
Legal weight
Binding
Stage
Final
Change scope
Substantive
Document ID
No. S 222/2026

Who this affects

Applies to
Construction firms Retailers
Industry sector
2361 Construction
Activity scope
Building works fees Development approvals Construction permits
Geographic scope
Singapore SG

Taxonomy

Primary area
Construction
Operational domain
Compliance
Topics
Real Estate Government Contracting

Get alerts for this source

We'll email you when Singapore Legislation Updates publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!