The Secretary of State has made the A66 Northern Trans-Pennine Development Consent (Amendment) Order 2026 (SI 2026/422), effective 16 April 2026, making non-material amendments to the A66 Northern Trans-Pennine Development Consent Order 2024. The amendment adds a new Work No. 0102-1D-A for additional carriageway and improvements to sections of the A66 near Kemplay Bank Junction. It also reclassifies multiple footpaths as cycle tracks, corrects various distance measurements, and removes certain access references across Schedules 1 and 2 of the original order.

Published by UK Parliament on legislation.gov.uk . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

This Amendment Order makes non-material changes to the A66 Northern Trans-Pennine Development Consent Order 2024. The amendments include: insertion of new Work No. 0102-1D-A for additional carriageway construction east of Kemplay Bank Junction; conversion of several footpaths to cycle tracks (including near the former Llama Karma Kafe and Countess Pillar sites); corrections to distance measurements throughout Schedule 2 tables; removal of certain reference entries; and realignment of various rights of way.

The changes are administrative and technical in nature. The undertaker (National Highways) must submit certified copies of any new, revised or substituted plans to the Secretary of State following the making of this Order. The public and local authorities along the A66 route corridor between Penrith and Appleby should note the updated classifications and measurements for footpaths, bridleways, and access routes.

Archived snapshot

Apr 17, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2026 No. 422

Infrastructure Planning

The A66 Northern Trans-Pennine Development Consent (Amendment) Order 2026

Made

15th April 2026

Coming into force

16th April 2026

An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008() to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011() for a non-material change to the A66 Northern Trans-Pennine Development Consent Order 2024().

The Secretary of State, having considered the application and the responses to the publicity and consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 has decided to make this Order amending the A66 Northern Trans-Pennine Development Consent Order 2024.

The Secretary of State, in exercise of the powers in paragraph 2 of Schedule 6 to the Planning Act 2008, makes the following Order.

Citation and commencement

  1. This Order may be cited as the A66 Northern Trans-Pennine Development Consent (Amendment) Order 2026 and comes into force on 16th April 2026.

Amendment of the A66 Northern Trans-Pennine Development Consent Order 2024

  1. The A66 Northern Trans-Pennine Development Consent Order 2024 is amended as follows.

Certification of new, revised or substituted plans

  1. —(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of any new, revised or substituted plans to the Secretary of State for certification that they are true copies of the plans referred to in this Order.

(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Amendment to Schedule 1 (authorised development)

  1. —(1) In Part 1 of Schedule 1 (authorised development), after paragraph (d) Work No. 0102-1D, insert—

“ (e) Work No. 0102-1D-A — as shown on sheet 2 of the works plans for scheme 0102 and being the construction of additional carriageway and improvements to sections of the existing A66, to include—

(i) the improvement of the existing A66 eastbound and westbound dual carriageway to the east of the new Kemplay Bank Junction; and

(ii) the construction of new private means of access to attenuation pond as shown on sheet 2 of the rights of way and access plans for scheme 0102; ”.

(2) Renumber what was paragraph (e) as paragraph (f).

(3) In Part 2 of Schedule 1, in—

(a) Work No. 03-9B, sub-paragraph (i), for “footpath” substitute “cycle track”;

(b) Work No. 03-9B, sub-paragraph (i), for “Countess Pillar” substitute “former Llama Karma Kafe”; and

(c) Work No. 03-9B, sub-paragraph (ii), after “improved A66”, insert “(including the site of the former Llama Karma Kafe)”.

(4) In Part 3 of Schedule 1 in—

(a) Work No. 0405-6C, sub-paragraph (iii), after “lane;” insert “and”;

(b) Work No. 0405-6C, omit sub-paragraph (iv); and

(c) Work No. 0405-9, paragraph (a), for “existing Footpath 336/011” substitute “Green Land Track”.

Amendment to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access)

  1. In the table in Part 1 of Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access) that relates to Scheme 03 (Penrith to Temple Sowerby), in the section headed Scheme 03 – The rights of ways and access plans – sheet 1—

(a) in row 4 in column (2) with the entry headed “Footpath”, in column (4), in the entry headed “Reference D”, for “footpath” substitute “cycle track”;

(b) in row 5 in column (4), in the entry headed “Reference E”, for “720 metres” substitute “690 metres”;

(c) in row 6 in column (4), in the entry headed “Reference L”, in the two places where “footpath” occurs substitute “cycle track” and for “865 metres” substitute “740 metres”; and

(d) in row 7 in column (4), omit the whole entry headed “Reference M”.

  1. In the table in Part 3 of Schedule 2 that relates to Scheme 03 (Penrith to Temple Sowerby) in the section headed Scheme 03 – The rights of way and access plans – sheet 1—

(a) in row 4 in column (4), in the entry headed “Reference 5”, for “footpath Reference D and the new cycle track Reference E” substitute “cycle track References B, D and E”; and

(b) in row 7 in column (2) with the entry headed “Reference g”, in column (4) in the entry headed “Reference 8”, for “71 metres” substitute “10 metres”.

  1. In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 1 and 2—

(a) in row 1 in column (2) with the entry headed “Bridleway 336/007”, in column (4), in the entry headed “Reference A”, for “(on sheet 1)” substitute “(on sheet 1 and sheet 2)”;

(b) in row 3 in column (2) with the entry headed “Priest Lane”—

(i) in column (3), for “710 metres” substitute “587 metres”; and

(ii) in column (4) in the entry headed “Realigned Priest Lane”, for “885 metres” substitute “351 metres” and for “720 metres” substitute “610 metres”;

(c) in row 4 in column (2) with the entry headed “Cross Street”, in column (4) in the entry headed “The Realigned Cross Street”, for “745 metres” substitute “503 metres”;

(d) in row 5 in column (2) with the entry headed “Bridleway 336/018”—

(i) in column (3), after “Bridleway 336/018” insert “from a point 1 metre from its junction with the existing Cross Street for a distance of 205 metres” and after “direction” omit from “between” to the end; and

(ii) in column (4) in the entry headed “Reference B”, for “245 metre” substitute “194 metre”, for “210 metres” substitute “153 metres” and for “35 metre” substitute “41 metre”;

(e) in row 6, in column (4) in the entry headed “Reference K”, for “180 metre” substitute “188 metre” and for “Footpath 366/017” substitute “Footpath 336/017”; and

(f) in row 9, in column (4) in the entry headed “Reference D*”, for “385 metre” substitute “320 metre”.

  1. In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights and way and access plans - sheets 2 and 3, in row 1 in column (2) with the entry headed “Footpath 336/017”—

(a) in column (3) for “405 metre” substitute “398 metre” and for “sheet 1” substitute “sheet 2”; and

(b) in column (4) in the entry headed “Reference C”—

(i) for “90 metres south-east” substitute “2 metres north”; and

(ii) for “the point where it connects with existing Footpath 366/013” substitute “Point S then turning northwards from Point S for a length of 162 metres, then branching in a westerly direction to join Footpath 336/017 and in an easterly direction to join Footpath 336/013”.

  1. In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 4 and 5—

(a) in row 1 in column (2) with the entry headed “Footpath 317/009 and Footpath 341/017”, in column (4) in the entry headed “To be substituted by References E and C* (part)”, in the section of that entry headed “Reference E”—

(i) for “a point 69 metres to the north-east of the existing junction of Footpath 341/017 with Roman Road,” substitute “Point M”; and

(ii) for “135 metres” substitute “105 metres”;

(b) in row 3 in column (2) with the entry headed “Long Marton (Road)”, in column (3)—

(i) in the first paragraph, for “93 metres” substitute “34 metres” and for “136 metres” substitute “191 metres”; and

(ii) in the second paragraph, for “870 metres” substitute “915 metres” and for “125 metres” substitute “130 metres”; and

(c) in row 6, in column (4) in the entry headed “Reference H*”, for “1.2 km.” substitute “1.1 km.”.

  1. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 1 and 2—

(a) in row 4 in column (2) with the entry headed “Reference b”, in column (4) with the entry headed “Reference 4”—

(i) for “30 metres” substitute “43 metres”;

(ii) for “217 metres” substitute “207 metres”;

(iii) for “southerly” substitute “northerly”; and

(iv) for “67 metres” substitute “70 metres”; and

(b) in row 8 in column (2) with the entry headed “Reference d”, in column (4) in the entry headed “Reference 8”, for “13 metres” substitute “1 metre”;

(c) in row 10, in column (4) in the entry headed “Reference 10”, for “90 metres” substitute “50 metres” and for “north-east” substitute “south-east”; and

(d) in row 11 in column (2) with the entry headed “Reference e”, in column (4) in the entry headed “Reference 11” for “149 metres north-east of the junction of Priest Lane with Bridleway 336/007 (as shown on sheets 1 and 2” substitute “178 metres north-east of Point B (as shown on sheet 2”;

(e) in row 12 in column (2) with the entry headed “Reference i”, in column (4) in the entry headed “Reference 12”, for “198 metres north-east of the junction of Priest Lane with Bridleway 336/007” substitute “between the proposed Priest Lane Underpass and the realigned Station Road”;

(f) in rows 13, 14 and 15, in column (4), omit the entire entries headed “Reference 13”, “Reference 14” and “Reference 15”;

(g) in row 16, in column (4) in the entry headed “Reference 16”, for “pond” substitute “tank” and for “263 metres” substitute “217 metres”;

(h) in row 17 in column (2), with the entry headed “Reference l”, omit the entire entries in columns (2), (3) and (4);

(i) in row 18 in column (2) with the entry headed “Reference k”, omit the entire entries in columns (2), (3) and (4);

(j) in row 19 in column (4), omit the entire entry headed “Reference 19”;

(k) in row 20 in column (2) with the entry headed “Reference p”—

(i) in column (3), for “realigned” substitute “existing” and for “205 metres” substitute “206 metres”; and

(ii) in column (4) in the entry headed “References 20 and 78”, in the two places where “reference” occurs substitute “Reference”;

(iii) in rows 21, 22, 23 and 24, in column (4), omit the entire entries headed “Reference 21”, “Reference 22”, “Reference 24” and “Reference 26”.

  1. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 2 and 3—

(a) in row 1—

(i) in column (2), for the heading “Reference q; and Reference r”, omit “; and Reference r”;

(ii) in column (4), for the entry headed “Reference 23” substitute—

“ (1) (2) (3) (4)
References 24 and 26

To be substituted by—

Reference 24: a new private means of access (including a right of vehicular access) providing access to the new footpath (Reference C); to land lying to the north of the new A66; and to maintenance strips on the north and south sides of the new A66; and crossing the new A66 (via a bridge) to connect the new private means of access (Reference 26) (as shown on sheet 2 and sheet 3 of the rights of way and access plans for scheme 0405); and

Reference 26: a new private means of access (including a right of vehicular access) from the edge of Ashton Lea field in a generally north-easterly direction for a distance of 93 metres and joining onto another new private means of access (Reference 24) at Point S and with a right of vehicular access over new footpath (Reference C) (as shown on sheet 2 of the rights of way and access plans for scheme 0405). ” |
(b) in row 2 in column (2), with the entry headed “Reference s”, for the entries in columns (3) and (4)” substitute—

“ (1) (2) (3) (4)
A length of Green Lane Track from a point 215 metres to the north of the junction of Green Lane Track with Footpath 336/011 in a north-easterly direction for a distance of 401 metres. To be substituted by—

A new private means of access (Reference 24) from the edge of Ashton Lea field in a generally north-easterly direction for a distance of 494 metres and joining onto another new private means of access (Reference 26) at Point S, and with a right of vehicular access over new footpath (Reference C) from a point 162 metres to the west of Point U, continuing in a generally easterly direction to Point T and continuing from Point T to the junction of the new footpath with the existing Footpath 336/013 a total distance of 494 metres (as shown on sheets 2 and 3 of the rights of way and access plans for scheme 0405). ” |
12. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 3 and 4—

(a) in row 11 in column (4), in the entry headed “Reference 49”—

(i) for “135 metres” substitute “144 metres”;

(ii) for “45 metres” substitute “292 metres to Point L”;

(iii) for “255 metres towards the new A66” substitute “78 metres”; and

(iv) for “300 metres” substitute “812 metres”; and

(b) in row 12 in column (4) in the entry headed “Reference 50”, for “85 metres” substitute “135 metres”.

  1. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheet 5—

(a) in row 5 in column (4), in the entry headed “Reference 56”, omit the entire entry;

(b) in row 7 in column (4), in the entry headed “Reference 53”, for “as well as to maintenance strip on the west side of the realigned Long Marton, from a point 135 metres” substitute “11 metres”;

(c) in row 9 in column (4), in the entry headed “Reference 54”, omit “as well as to maintenance strip on the east side of the realigned Long Marton from Point V in a generally south-westerly direction for a distance of 548 metres”;

(d) in row 10 in column (4), in the entry headed “Reference 58”, omit “as well as to maintenance strip on the west side of the realigned Long Marton from a point 150 metres north-east of the junction of the realigned Long Marton (Road) and the existing A66”;

(e) in row 11 in column (4), in the entry headed “Reference 59”—

(i) for “180 metres” substitute “15 metres”; and

(ii) omit “, in a generally north-easterly direction for a distance of 55 metres”.

Amendment to Schedule 7 (classification of roads, etc.)

  1. In Part 3 (Scheme 0405 – Temple Sowerby to Appleby) of Schedule 7 (classification of roads, etc.)—

(a) in the heading to paragraph 38, for “1.2” substitute “1.15”;

(b) in paragraph 38, for “1.2” substitute “1.15”;

(c) in paragraph 40, for “750” substitute “397”;

(d) in paragraph 46, for “860m” substitute “81 metre”; and

(e) in paragraph 46(a), for “an 89” substitute “a 41”.

Amendment to Schedule 8 (traffic regulation measures etc.)

  1. In the Speed Limits table in Part 3 of Schedule 8 (traffic regulation measures etc.)—

(a) in the section for “Scheme 0405 – The traffic regulation measures (speed limits) plans – sheets 1 and 2”, in row 1 in column (2) in the entry headed “New (realigned) Cross Street”, for “806” substitute “721” and for “128” substitute “213”; and

(b) in the section for “Scheme 0405 – The traffic regulation measures (speed limits) plans – sheet 5”, in row 1 in column (2) in the entry headed “Realigned Long Marton”, in the two places where “1.2” occurs substitute “1.15”.

Amendment to Schedule 10 (documents to be certified)

  1. For the table in Schedule 10 (documents to be certified) substitute the table shown in the Schedule.

Signed by the authority of the Secretary of State for Transport

Natasha Kopala

Head of the Transport and Works Act Orders Unit

Department for Transport

15th April 2026

Article 16

SCHEDULE DOCUMENTS TO BE CERTIFIED

| (1)

Document | (2)

Description | (3)

Reference | (4)

Date submitted
Book of reference
Book of Reference – Volume Two: Scheme 03: Penrith to Temple Sowerby
Book of Reference – Volume Three: Scheme 0405: Temple Sowerby to Appleby
Book of Reference – Volume Four: Scheme 06: Appleby to Brough
Book of Reference – Volume Five: Scheme 07: Bowes Bypass
Book of Reference – Volume Six: Scheme 08: Cross Lanes to Rokeby
Book of Reference – Volume Seven: Scheme 09: Stephen Bank to Carkin Moor
Book of Reference – Volume Eight: Scheme 11: A1(M) Junction 53 Scotch Corner
Classification of roads plans
Classification of Roads Plan Scheme 03: Penrith to Temple Sowerby
Classification of Roads Plan Scheme 0405: Temple Sowerby to Appleby
Classification of Roads Plan Scheme 06: Appleby to Brough
Classification of Roads Plan Scheme 07: Bowes Bypass
Classification of Roads Plan Scheme 08: Cross Lanes to Rokeby
Classification of Roads Plan Scheme 09: Stephen Bank to Carkin Moor
Crown land plans
Crown Land Plans Scheme 07: Bowes Bypass
Design principles
De-trunking plans
De-Trunking Plans Scheme 03: Penrith to Temple Sowerby
De-Trunking Plans Scheme 0405: Temple Sowerby to Appleby, subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301701, rev. P02;

Sheet 2 for Sheet 2 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301702, rev. P02;

Sheet 3 for Sheet 3 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301703, rev. P01; and

Sheet 4 for Sheet 4 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301704, rev. P02 | 5.21 | 21/6/2022 | |
| De-Trunking Plans Scheme 06: Appleby to Brough | 5.21 (Rev 2) | 9/5/2023 | |
| De-Trunking Plans Scheme 07: Bowes Bypass | 5.21 (Rev 2) | 9/5/2023 | |
| De-Trunking Plans Scheme 08: Cross Lanes to Rokeby | 5.21 | 21/6/2022 | |
| De-Trunking Plans Scheme 09: Stephen Bank to Carkin Moor | 5.21 (Rev 2) | 9/5/2023 | |
| Engineering section drawings: cross sections | Engineering Section Drawings: Cross Sections Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.18 (Rev 2) | 9/5/2023 |
| Engineering Section Drawings: Cross Sections Scheme 03: Penrith to Temple Sowerby subject to the following substitution—

Sheet 1 for Sheet 1 with drawing number HE615323-JAC-HAC-03AALSCHEM-DR-CH-201101, rev. P03 | 5.18 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Cross Sections Scheme 0405: Temple Sowerby to Appleby subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301101, rev. P01;

Sheet 3 for Sheet 3 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301103, rev. P01; and

Sheet 5 for Sheet 5 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301105, rev. P02 | 5.18 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Cross Sections Scheme 06: Appleby to Brough | 5.18 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Cross Sections Scheme 07: Bowes Bypass | 5.18 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Cross Sections Scheme 08: Cross Lanes to Rokeby | 5.18 | 21/6/2022 | |
| Engineering Section Drawings: Cross Sections Scheme 09: Stephen Bank to Carkin Moor | 5.18 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Cross Sections Scheme 11: A1(M) Junction 53 Scotch Corner | 5.18 | 21/6/2022 | |
| Engineering section drawings: plan and profiles | Engineering Section Drawings: Plan and Profiles Scheme 0102: M6 Junction 40 to Kemplay Bank, subject to the following substitution—

Sheet 2 for Sheet 2 with drawing number HE615322-KIE-HAC-002ALSCHEM-DR-CH-101001, rev. P01 | 5.17 (Rev 2) | 9/5/2023 |
| Engineering Section Drawings: Plan and Profiles Scheme 03: Penrith to Temple Sowerby, subject to the following substitution—

Sheet 1 for Sheet 1 with drawing number HE615323-JAC-HAC-03AALSCHEM-DR-CH-201001, rev. P01 | 5.17 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Plan and Profiles Scheme 0405: Temple Sowerby to Appleby, subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301001, rev. P02;

Sheet 2 for Sheet 2 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301002, rev. P02;

Sheet 4 for Sheet 4 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301004, rev. P02;

Sheet 5 for Sheet 5 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301005, rev. P01;

Sheet 8 for Sheet 8 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301008, rev. P02;

Sheet 9 for Sheet 9 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301009, rev. P02;

Sheet 11 for Sheet 11 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301011, rev. P02;

Sheet 12 for Sheet 12 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301012, rev. P02;

Sheet 15 for Sheet 15 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301015, rev. P02;

Sheet 16 for Sheet 16 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301016, rev. P01;

Sheet 17 for Sheet 17 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301017, rev. P02;

Sheet 18 for Sheet 18 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301018, rev. P01;

Sheet 19 for Sheet 19 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301019, rev. P02;

Sheet 20 for Sheet 20 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301020, rev. P01;

Sheet 22 for Sheet 22 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301022, rev. P01; and

Sheet 23 for Sheet 23 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301023, rev. P01 | 5.17 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Plan and Profiles Scheme 06: Appleby to Brough | 5.17 (Rev 3) | 16/5/2023 | |
| Engineering Section Drawings: Plan and Profiles Scheme 07: Bowes Bypass | 5.17 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Plan and Profiles Scheme 08: Cross Lanes to Rokeby | 5.17 | 21/6/2022 | |
| Engineering Section Drawings: Plan and Profiles Scheme 09: Stephen Bank to Carkin Moor | 5.17 (Rev 2) | 9/5/2023 | |
| Engineering Section Drawings: Plan and Profiles Scheme 11: A1(M) Junction 53 Scotch Corner | 5.17 | 21/6/2022 | |
| Environmental management plan | Environmental Management Plan | 2.7 (Rev 5) | 16/5/2023 |
| Environmental Management Plan Annex A Constraints Plan | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex B1 Outline Landscape and Ecology Management Plan | 2.7 (Rev 4) | 16/5/2023 | |
| Environmental Management Plan Annex B2 Outline Site Waste Management Plan | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex B3 Outline Heritage Mitigation Strategy | 2.7 (Rev 5) | 16/5/2023 | |
| Environmental Management Plan Annex B4 Air Quality and Dust Management Plan | 2.7 (Rev 3) | 16/5/2023 | |
| Environmental Management Plan Annex B5 Noise and Vibration Management Plan | 2.7 (Rev 3) | 16/5/2023 | |
| Environmental Management Plan Annex B6 Public Rights of Way Management Plan | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex B7 Ground and Surface Water Management Plan | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex B8 Materials Management Plan | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex B9 Soil Management Plan | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex B10 Construction Worker Travel and Accommodation Plan | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex B11 Community Engagement Plan | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex B12 Skills and Employment Strategy | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex B13 Construction Traffic Management Plan | 2.7 (Rev 2) | 16/5/2023 | |
| Environmental Management Plan Annex B14 Site Establishment Plan | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex B15 Invasive Non-Native Species (INNS) | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex C1 Working in and Near SAC Method Statement | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex C2 Working in Watercourses Method Statement | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental Management Plan Annex C3 Scheduled Monuments Method Statement | 2.7 (Rev 4) | 16/5/2023 | |
| Environmental Management Plan Annex C4 Piling Method Statement | 2.7 | 21/6/2022 | |
| Environmental Management Plan Annex D Emergency Procedures | 2.7 (Rev 2) | 24/1/2023 | |
| Environmental statement | Environmental Statement Non-Technical Summary | 3.1 | 21/6/2022 |
| Environmental Statement Volume 1 (Main Report) - Chapters 1 to 15 | 3.2 | 21/6/2022 | |
| Environmental Statement Volume 1 (Main Report) - Chapter 16 | 3.2 (Rev 2) | 6/9/2022 | |
| Environmental Statement Volume 2 (Figures) – Figures 1.1, 2.3, 8.9.1, 10.8, 11.1, 12.2, 12.5 and 12.9 | 3.3 | 21/6/2022 | |
| Environmental Statement Volume 2 (Figures) – Figure 10.9 | 3.3 (Rev 2) | 14/2/2023 | |
| Environmental Statement Volume 2 (Figures) – Figures 2.1 to 2.2, 2.4 to 8.8.2, 8.9.2 to 10.7, 12.1, 12.3 to 12.4, 12.6 to 12.8 and 13.1 to 15.2 | 3.3 (Rev 2) | 9/5/2023 | |
| Environmental Statement Volume 3 (Appendices) – Appendices 1.1 to 5.3, 6.1 to 8.9, 9.1 to 9.4 and 10.1 to 10.5 | 3.4 | 21/6/2022 | |
| Environmental Statement Volume 3 (Appendices) – Appendix 9.5 and 13.2 | 3.4 (Rev 2) | 24/1/2023 | |
| Environmental Statement Volume 3 (Appendices) 5.4, 8.10 and 10.6 | 3.4 (Rev 2) | 14/2/2023 | |
| Errata Report | 6.1 (Rev 3) | 16/5/2023 | |
| Environmental Statement Addendum Volume 1 (Scoping) | 8.3 | 9/5/2023 | |
| Environmental Statement Addendum Volume 2 (Detailed Assessments) | 8.3 | 9/5/2023 | |
| Environmental Statement Addendum Volume 3 (Scheme Description) | 8.3 | 9/5/2023 | |
| Land plans | Land Plans Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.13 (Rev 3) | 9/5/2023 |
| Land Plans Scheme 03: Penrith to Temple Sowerby | 5.13 | 21/6/2022 | |
| Land Plans Scheme 0405: Temple Sowerby to Appleby | 5.13 (Rev 2) | 2/9/2022 | |
| Land Plans Scheme 06: Appleby to Brough | 5.13 (Rev 3) | 26/5/2023 | |
| Land Plans Scheme 07: Bowes Bypass | 5.13 (Rev 2) | 16/5/2023 | |
| Land Plans Scheme 08: Cross Lanes to Rokeby | 5.13 | 21/6/2022 | |
| Land Plans Scheme 09: Stephen Bank to Carkin Moor | 5.13 (Rev 2) | 16/5/2023 | |
| Land Plans Scheme 11: A1(M) Junction 53 Scotch Corner | 5.13 | 21/6/2022 | |
| Outline blanket bog compensation and maintenance plan | Habitats Regulation Assessment North Pennine Moors SAC Outline Blanket Bog Management and Compensation Plan | - | 27/10/2023 |
| Rights of way and access plans | Rights of Way and Access Plans Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.19 | 21/6/2022 |
| Rights of Way and Access Plans Scheme 03: Penrith to Temple Sowerby, subject to the following substitution—

Sheet 1 for Sheet 1 with drawing number HE615323-JAC-HAC-03AALSCHEM-DR-CH-201401, rev. P03 | 5.19 (Rev 3) | 16/5/2023 | |
| Rights of Way and Access Plans Scheme 0405: Temple Sowerby to Appleby, subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301401, rev. P02;

Sheet 2 for Sheet 2 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301402, rev. P02;

Sheet 3 for Sheet 3 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301403, rev. P02;

Sheet 4 for Sheet 4 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301404, rev. P01; and

Sheet 5 for Sheet 5 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301405, rev. P02 | 5.19 | 21/6/2022 | |
| Rights of Way and Access Plans Scheme 06: Appleby to Brough | 5.19 (Rev 2) | 9/5/2023 | |
| Rights of Way and Access Plans Scheme 07: Bowes Bypass | 5.19 (Rev 2) | 9/5/2023 | |
| Rights of Way and Access Plans Scheme 08: Cross Lanes to Rokeby | 5.19 | 21/6/2022 | |
| Rights of Way and Access Plans Scheme 09: Stephen Bank to Carkin Moor | 5.19 (Rev 2) | 9/5/2023 | |
| Rights of Way and Access Plans Scheme 11: A1(M) Junction 53 Scotch Corner | 5.19 | 21/6/2022 | |
| Special category land plans | Special Category Land Plans Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.15 (Rev 2) | 9/5/202 |
| Special Category Land Plans Scheme 0405: Temple Sowerby to Appleby | 5.15 | 21/6/2022 | |
| Special Category Land Plans Scheme 06: Appleby to Brough | 5.15 (Rev 2) | 9/5/2023 | |
| Special Category Land Plans Scheme 07: Bowes Bypass | 5.15 | 21/6/2022 | |
| Traffic regulation measures (clearways and prohibitions) plans | Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.22 | 21/6/2022 |
| Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 03: Penrith to Temple Sowerby, subject to the following substitution—

Sheet 1 for Sheet 1 with drawing number HE615323-JAC-HAC-03AALSCHEM-DR-CH-201601, rev. P01 | 5.22 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 0405: Temple Sowerby to Appleby, subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301601, rev. P02;

Sheet 2 for Sheet 2 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301602, rev. P02;

Sheet 3 for Sheet 3 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301603, rev. P02;

Sheet 4 for Sheet 4 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301604, rev. P01; and

Sheet 5 for Sheet 5 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301605, rev. P02 | 5.22 | 21/6/2022 | |
| Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 06: Appleby to Brough | 5.22 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 07: Bowes Bypass | 5.22 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 08: Cross Lanes to Rokeby | 5.22 | 21/6/2022 | |
| Traffic Regulation Measures (Clearways and Prohibitions) Plans Scheme 09: Stephen Bank to Carkin Moor | 5.22 (Rev 2) | 9/5/2023 | |
| Traffic regulation measures (speed limits) plans | Traffic Regulation Measures (Speed Limits) Plans Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.23 (Rev 2) | 9/5/2023 |
| Traffic Regulation Measures (Speed Limits) Plans Scheme 03: Penrith to Temple Sowerby, subject to the following substitution—

Sheet 1 for Sheet 1 with drawing number HE615323-JAC-HAC-03AALSCHEM-DR-CH-201501, rev. P01 | 5.23 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Speed Limits) Plans Scheme 0405: Temple Sowerby to Appleby, subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301501, rev. P02;

Sheet 2 for Sheet 2 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301502, rev. P02;

Sheet 3 for Sheet 3 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301503, rev. P02;

Sheet 4 and Sheet 4 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301504, rev. P01; and

Sheet 5 and Sheet 5 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301505, rev. P02 | 5.23 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Speed Limits) Plans Scheme 06: Appleby to Brough | 5.23 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Speed Limits) Plans Scheme 07: Bowes Bypass | 5.23 (Rev 2) | 9/5/2023 | |
| Traffic Regulation Measures (Speed Limits) Plans Scheme 08: Cross Lanes to Rokeby | 5.23 | 21/6/2022 | |
| Traffic Regulation Measures (Speed Limits) Plans Scheme 09: Stephen Bank to Carkin Moor | 5.23 (Rev 2) | 9/5/2023 | |
| Tree preservation order trees location plan | Tree Preservation Order Trees Location Plan Scheme 0102: M6 Junction 40 to Kemplay Bank | 5.24 | 21/6/2022 |
| Tree Preservation Order Trees Location Plan Scheme 06: Appleby to Brough | 5.24 (Rev 2) | 9/5/2023 | |
| Tree Preservation Order Trees Location Plan Scheme 09: Stephen Bank to Carkin Moor | 5.24 (Rev 2) | 9/5/2023 | |
| Works plans | Works Plans Scheme 0102: M6 Junction 40 to Kemplay Bank, subject to the following substitution—

Sheet 2 for Sheet 2 with drawing number HE615322-KIE-HAC-002ALSCHEM-DR-CH-101201, rev. P02 | 5.16 (Rev 2) | 9/5/2023 |
| Works Plans Scheme 03: Penrith to Temple Sowerby, subject to the following substitution—

Sheet 1 for Sheet 1 with drawing number HE615323-JAC-HAC-03AALSCHEM-DR-CH-201201, rev. P01 | 5.16 (Rev 2) | 9/5/2023 | |
| Works Plans Scheme 0405: Temple Sowerby to Appleby, subject to the following substitutions—

Sheet 1 for Sheet 1 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301201, rev. P02;

Sheet 2 for Sheet 2 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301202, rev. P02;

Sheet 3 for Sheet 3 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301203, rev. P02;

Sheet 4 for Sheet 4 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301204, rev. P01; and

Sheet 5 for Sheet 5 with drawing number HE615324-BBA-HAC-004ALSCHEM-DR-CH-301205, rev. P02 | 5.16 (Rev 2) | 9/5/2023 | |
| Works Plans Scheme 06: Appleby to Brough | 5.16 (Rev 2) | 9/5/2023 | |
| Works Plans Scheme 07: Bowes Bypass | 5.16 (Rev 2) | 9/5.2023 | |
| Works Plans Scheme 08: Cross Lanes to Rokeby | 5.16 | 21/6/2022 | |
| Works Plans Scheme 09: Stephen Bank to Carkin Moor | 5.16 (Rev 2) | 9/5/2023 | |
| Works Plans Scheme 11: A1(M) Junction 53 Scotch Corner | 5.16 | 21/6/2022 | |

EXPLANATORY NOTE

(This note is not part of the Order)

This Order amends the A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360) (“ the 2024 Order ”), a development consent order under the Planning Act 2008 (“ the Act ”).

This Order follows an application under paragraph 2 of Schedule 6 to the Act to make the following non-material changes to the 2024 Order—

(a) article 4 provides for six amendments to the Work No. descriptions and the insertion of new Work No. 0102-1D-A in Schedule 1 (authorised development);

(b) articles 5 to 13 provided for amendments to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access). Articles 5 and 6 amend the tables in Parts 1 and 3 that relate to Scheme 03 (Penrith to Temple Sowerby) and articles 7 to 13 amend the tables in Parts 1 and 3 that relate to Scheme 0405 (Temple Sowerby to Appleby) in Schedule 2;

(c) article 14 provides for five amendments to the measurements of highways set out in Schedule 7 (classification of roads, etc.);

(d) article 15 provides for four amendments to the measurement of highways set out in Schedule 8 (traffic regulation measures etc.);

(e) article 3 provides for the certification of new, revised or substituted plans required to show the non-material changes to the 2024 Order; and

(f) article 16 provides for amendments to Schedule 10 (documents to be certified) required due to the new, revised or substituted plans are set out in the Schedule to this Order. This Order substitutes the table in Schedule 10 for the table in the Schedule to this Order.

A copy of the substituted plans mentioned in this Order may be inspected free of charge during working hours at the offices of National Highways, Three Snowhill, Snow Hill Queensway, Birmingham, B4 4GA.

(1) 2008 c. 29. Paragraph 2 of Schedule 6 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23), by paragraph 72 of Schedule 13 and paragraph 1 of Schedule 25 to the Localism Act 2011 (c. 20), by section 28 of the Infrastructure Act 2015 (c. 7) and by section 128 of the Levelling-up and Regeneration Act 2023 (c. 55).

(2) S.I. 2011/2055, as amended by S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2015/377, S.I. 2015/760, S.I. 2015/1682, S.I. 2017/314, S.I. 2017/524, S.I. 2018/378, S.I. 2019/734, S.I. 2020/764, S.I. 2020/1534, S.I. 2021/978, S.I. 2022/634 and S.I. 2023/1071.

(3) S.I. 2024/360, as corrected by S.I. 2025/1084.

  • Previous
  • Next

Named provisions

Citation and commencement Amendment of the A66 Northern Trans-Pennine Development Consent Order 2024 Certification of new, revised or substituted plans Amendment to Schedule 1 (authorised development) Amendment to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access)

Get daily alerts for UK New Legislation

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from UK Parliament.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
UK Parliament
Published
April 16th, 2026
Instrument
Rule
Legal weight
Binding
Stage
Final
Change scope
Minor
Document ID
2026 No. 422
Supersedes
A66 Northern Trans-Pennine Development Consent Order 2024

Who this affects

Applies to
Transportation companies Government agencies Construction firms
Industry sector
4841 Trucking & Logistics
Activity scope
Highway construction Infrastructure development Public right of way modifications
Geographic scope
United Kingdom GB

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Environmental Protection Real Estate

Get alerts for this source

We'll email you when UK New Legislation publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!