Changeflow GovPing Energy RMP Subscriber Solar Program 2025 Annual Report...
Routine Notice Added Final

RMP Subscriber Solar Program 2025 Annual Report - Docket No. 26-035-16

Favicon for psc.utah.gov psc.utah.gov
Published
Detected
Email

Summary

Rocky Mountain Power filed its 2025 Annual Report of the Subscriber Solar Program with the Utah Public Service Commission under Docket No. 26-035-16. The Division of Public Utilities filed confidential comments on April 16, 2026. An Action Request was issued March 25, 2026, with responses due April 24, 2026.

Published by UT PSC on psc.utah.gov . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

Rocky Mountain Power submitted its 2025 Annual Report for the Subscriber Solar Program to the Utah Public Service Commission, along with supporting exhibits including a subscriber solar dashboard, program cost model (confidential), and liability account documentation. The Division of Public Utilities reviewed the filing and submitted confidential comments. The PSC issued an Action Request with an April 24, 2026 deadline for responses.\n\nAffected parties including utility customers, solar subscribers, and renewable energy developers may wish to monitor this docket for public access to the report and DPU comments once confidential materials are addressed. The comment period provides an opportunity for stakeholder input on program performance and costs.

Archived snapshot

Apr 16, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.


Docket No: 26-035-16

Electric Docket Year: 2026

Rocky Mountain Power’s 2025 Annual Report of the Subscriber Solar Program

For questions regarding documents not linked call 801-530-6716

Date Description
April 16, 2026 Redacted Comments from the Division of Public Utilities

Comments from the Division of Public Utilities [CONFIDENTIAL]

| March 27, 2026 | Notice of Filing and Comment Period |
| March 25, 2026 | Action Request, Due: April 24, 2026 |
| March 25, 2026 | Redacted 2025 Annual Report of the Subscriber Solar Program

2025 Annual Report of the Subscriber Solar Program [CONFIDENTIAL]

RMP Exhibit A – Subscriber Solar Dashboard 2025 (Excel)

RMP Exhibit B – Programs Cost Model 2025 (Excel) [CONFIDENTIAL]

RMP Exhibit D – Liability Account 2025 (Excel) |

Share this:

-

-

-

Get daily alerts for psc.utah.gov

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from UT PSC.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
UT PSC
Published
March 25th, 2026
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor
Document ID
Docket No. 26-035-16
Docket
26-035-16

Who this affects

Applies to
Energy companies
Industry sector
2210 Electric Utilities
Activity scope
Annual regulatory filings Utility solar programs Renewable energy credits
Geographic scope
US-UT US-UT

Taxonomy

Primary area
Energy
Operational domain
Regulatory Affairs
Topics
Public Utilities Regulation Renewable Energy

Get alerts for this source

We'll email you when psc.utah.gov publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!