Changeflow GovPing Energy Feed-in Tariff Installation Report, 31 March 2026
Routine Notice Added Final

Feed-in Tariff Installation Report, 31 March 2026

Favicon for www.ofgem.gov.uk UK Ofgem Publications & Decisions
Published
Detected
Email

Summary

Ofgem published its quarterly Feed-in Tariff Installation Report covering accredited installations under the FIT scheme from 1 April 2010 to 31 March 2026. The report, split into three Excel files, provides regional breakdowns using updated Lower Level Super Output Areas codes under the Government Statistic Service system format. No new regulatory obligations or compliance requirements are created by this transparency document.

Published by Ofgem on ofgem.gov.uk . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

What changed

Ofgem released its quarterly Feed-in Tariff Installation Report for Q1 2026, providing a statistical breakdown of accredited renewable energy installations registered on the Central FIT Register. Regional data has been updated to reflect current Government Statistic Service LSOA code formats. The report is available as three separate Excel files due to file size.

Affected parties — energy suppliers, renewable energy installers, and policy analysts tracking FIT scheme deployment — should note this is a transparency report only. No new compliance obligations, reporting requirements, or tariff rate changes are introduced.

Archived snapshot

Apr 21, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Feed-in Tariff Installation Report 31 March 2026

Publication type: Transparency document Publication date:

21 April 2026

Scheme name: FIT Print this page

Share the page

-

  • This quarterly report gives a breakdown of accredited installations under the Feed-in Tariff (FIT) scheme from 1 April 2010 to 31 March 2026.

Data shown in the report is based on the number of installations that have completed accreditation in the above period only.

The report is based on the installations registered on the Central FIT Register (CFR). We have updated our Lower Level Super Output Areas (LSOA) codes to the current Government Statistic Service (GSS) system format. This means that the regional data associated with installations may differ to what we have published in previous reports.

Please note that due to file size limits this quarterly report has been split into three parts. All three parts are available in the documents section below.

Main document

Feed-in Tariff installation report part 1 [XLSX, 34.21MB] Feed-In Tariff installation report part 2 [XLSX, 35.61MB] Feed-In Tariff installation report part 3 [XLSX, 36.73MB] Print this page

Share the page

-

-

Mentioned entities

Get daily alerts for UK Ofgem Publications & Decisions

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from Ofgem.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
Ofgem
Published
April 21st, 2026
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Energy companies Government agencies
Industry sector
2210 Electric Utilities
Activity scope
Renewable energy reporting Accreditation data
Geographic scope
United Kingdom GB

Taxonomy

Primary area
Energy
Operational domain
Compliance
Topics
Energy Consumer Finance

Get alerts for this source