Changeflow GovPing Energy FERC Combined Filings Notice - Electric Rate Fi...
Routine Notice Added Final

FERC Combined Filings Notice - Electric Rate Filings April 2026

Favicon for www.regulations.gov Regs.gov: Federal Energy Regulatory Commission
Published
Detected
Email

Summary

FERC received 19 electric rate filings between April 10–17, 2026, spanning tariff amendments, compliance filings, and initial rate filings from entities including Duke Energy, Southern California Edison, PJM Interconnection, and NYISO. Comment deadlines range from May 1–8, 2026, with intervenors required to file per Rules 211, 214, or 206 by 5:00 p.m. ET on the specified date.

Published by FERC on regulations.gov . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

About this source

GovPing monitors Regs.gov: Federal Energy Regulatory Commission for new energy regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 149 changes logged to date.

What changed

FERC's Combined Filings Notice announces receipt of 19 electric rate filings between April 10–17, 2026, covering tariff amendments, compliance filings, and initial rate filings. Filings span multiple independent system operators (MISO, NYISO, PJM), utilities (Duke Energy, Southern California Edison, Alabama Power, Georgia Power, Mississippi Power, PacifiCorp, Tucson Electric Power), and power generators. Comment deadlines are staggered from May 1–8, 2026, with protests permitted but intervention required to become a party to any proceeding.

Affected parties—utilities, power marketers, generators, and load-serving entities—should monitor dockets relevant to their operations or market areas. Parties interested in intervening must file per 18 CFR 385.211, 385.214, or 385.206 by the applicable comment deadline. The notice covers rate modifications under Sections 205 and 206 of the Federal Power Act, with effective dates ranging from May–June 2026.

What to do next

  1. File in accordance with Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date

Archived snapshot

Apr 23, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Content

Take notice that the Commission received the following electric rate filings:

Docket Numbers: ER11-2044-044; ER15-2211-058; ER24-1587-011; ER13-1266-061; ER12-162-037; ER21-2280-007; ER22-1385-021; ER23-676-019; ER23-674-017;
ER10-1522-011; ER10-1521-027; ER10-1520-027.

Applicants: Occidental Power Services, Inc., Occidental Power Marketing, L.P., Occidental Chemical Corporation, BHE Wind Watch, LLC, BHE
Power Watch, LLC, BHER Market Operations, LLC., Independence Wind Energy LLC, Bishop Hill Energy II LLC, CalEnergy, LLC, AlbertaEx,
L.P., MidAmerican Energy Services, LLC, MidAmerican Energy Company.

Description: Motion to File Out of Time of Non-Material Change in Status of MidAmerican Energy Company, et al.

Filed Date: 4/10/26.

Accession Number: 20260410-5222.

Comment Date: 5 p.m. ET 5/1/26.

Docket Numbers: ER18-2370-007.

Applicants: Lackawanna Energy Center LLC.

Description: Compliance filing: PJM Entities Report to be effective N/A.

Filed Date: 4/17/26.

Accession Number: 20260417-5213.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER21-2460-000.

Applicants: New York Independent System Operator, Inc.

Description: Motion of New York Independent System Operator, Inc. to defer the effective date and request for waiver.

Filed Date: 4/15/26.

Accession Number: 20260415-5238.

Comment Date: 5 p.m. ET 5/6/26.

Docket Numbers: ER26-1634-001.

Applicants: Duke Energy Progress, LLC, Duke Energy Carolinas, LLC.

Description: Tariff Amendment: Duke Energy Carolinas, LLC submits tariff filing per 35.17(b): Amendment to Duke Retail Deferral Adjustment
Mechanism Filing to be effective 5/5/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5199.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2231-000.

Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company.

Description: Tariff Amendment: Alabama Power Company submits tariff filing per 35.15: Southern Power Enhanced Reliability Upgrade Construction
Agt Termination Filing to be effective 6/15/2026.

Filed Date: 4/16/26.

Accession Number: 20260416-5211.

Comment Date: 5 p.m. ET 5/7/26.

Docket Numbers: ER26-2232-000.

Applicants: Georgia Power Company.

Description: Tariff Amendment: Southern Power ERU Construction Agreement Concurrence Termination Filing to be effective 6/15/2026.

Filed Date: 4/16/26.

Accession Number: 20260416-5212.

Comment Date: 5 p.m. ET 5/7/26.

Docket Numbers: ER26-2233-000.

Applicants: Mississippi Power Company.

Description: Tariff Amendment: Southern Power ERU Construction Agreement Concurrence Termination Filing to be effective 6/15/2026.

Filed Date: 4/16/26.

Accession Number: 20260416-5218.

Comment Date: 5 p.m. ET 5/7/26.

Docket Numbers: ER26-2234-000.

Applicants: American Transmission Systems, Incorporated.

Description: § 205(d) Rate Filing: ATSI submits two new Construction Agmts—SA Nos. 7501 & 7498 to be effective 6/17/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5000.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2238-000.

Applicants: Midcontinent Independent System Operator, Inc.

Description: § 205(d) Rate Filing: 2026-04-17_SA 4741 ITC Midwest-WPL GIA (E0036) to be effective 4/13/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5047.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2239-000.

Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company, Ameren Illinois Company.

Description: § 205(d) Rate Filing: Ameren Illinois Company submits tariff filing per 35.13(a)(2)(iii: 2026-04-17_SA 3028 Ameren IL-Prairie
Power Project #45 Arcola to be effective 6/17/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5067.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2240-000.

Applicants: PacifiCorp.

Description: § 205(d) Rate Filing: OATT Formula Rate—Schedule 10 Trans System Loss Factor June 2026 to be effective 6/1/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5070.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2241-000.

Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company, Ameren Illinois Company.

Description: § 205(d) Rate Filing: Ameren Illinois Company submits tariff filing per 35.13(a)(2)(iii: 2026-04-17_SA 4745 Ameren IL-IMEA-Waterloo
Reimbursement Agreement to be effective 6/17/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5072.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2242-000.

Applicants: 301AK 8me LLC.

Description: Initial Rate Filing: Application for Market Based Rate to be effective 4/18/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5081.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2243-000.

Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company, Ameren Illinois Company.

Description: § 205(d) Rate Filing: Ameren Illinois Company submits tariff filing per 35.13(a)(2)(iii: 2026-04-17_SA 4746 Ameren Illinois-IMEA-Rantoul
WCA to be effective 6/17/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5086.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2244-000.

Applicants: Hillsboro Solar, LLC.

Description: Initial Rate Filing: Market-Based Rate Tariff to be effective 6/17/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5091.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2245-000.

Applicants: Tucson Electric Power Company.

Description: § 205(d) Rate Filing: OATT Revisions to Transition to Flowgate Methodology to be effective 6/16/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5128.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2246-000.

Applicants: Southern California Edison Company.

Description: § 205(d) Rate Filing: GIA, Santa Ana River 3 Power House (WDT010/SA No. 1419) to be effective 6/17/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5180.

Comment Date: 5 p.m. ET 5/8/26.

Docket Numbers: ER26-2247-000.

Applicants: PJM Interconnection, L.L.C.

Description: § 205(d) Rate Filing: Notice of Cancellation of ISA and CSA, SA Nos. 7092 & 7093; No. AF1-092 to be effective 5/18/2026.

Filed Date: 4/17/26.

Accession Number: 20260417-5210.

Comment Date: 5 p.m. ET 5/8/26.

The filings are accessible in the Commission's eLibrary system (https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying the docket number.

Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance
with Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding.

eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact
the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov.

Dated: April 17, 2026. Carlos D. Clay, Deputy Secretary. [FR Doc. 2026-07813 Filed 4-21-26; 8:45 am] BILLING CODE 6717-01-P

Download File

Download

CFR references

18 CFR 385.211 18 CFR 385.214 18 CFR 385.206

Get daily alerts for Regs.gov: Federal Energy Regulatory Commission

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from FERC.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
FERC
Published
April 17th, 2026
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Final
Change scope
Minor
Docket
ER11-2044-044 ER15-2211-058 ER18-2370-007 ER21-2460-000 ER21-2280-007 ER22-1385-021 ER23-674-017 ER23-676-019 ER24-1587-011 ER26-1634-001 ER26-2231-000 ER26-2232-000 ER26-2233-000 ER26-2234-000 ER26-2238-000 ER26-2239-000 ER26-2240-000 ER26-2241-000 ER26-2242-000 ER26-2243-000 ER26-2244-000 ER26-2245-000 ER26-2246-000 ER26-2247-000 ER10-1520-027 ER10-1521-027 ER10-1522-011 ER12-162-037 ER13-1266-061

Who this affects

Applies to
Energy companies
Industry sector
2210 Electric Utilities
Activity scope
Electric rate filings Tariff amendments Transmission service agreements
Geographic scope
United States US

Taxonomy

Primary area
Energy
Operational domain
Regulatory Affairs
Topics
Financial Services Banking

Get alerts for this source

We'll email you when Regs.gov: Federal Energy Regulatory Commission publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!