Changeflow GovPing Energy ARENA $38.1M Grant for Low-Emissions Lithium Re...
Routine Notice Added Final

ARENA $38.1M Grant for Low-Emissions Lithium Refining in Western Australia

Favicon for arena.gov.au Australia ARENA News
Published
Detected
Email

Summary

ARENA is providing up to $38.1 million in funding to PLS Group Limited to construct a low-emissions lithium processing demonstration plant at the Pilgangoora Operation in the Pilbara region of Western Australia. The project will deploy Calix Limited's electric-kiln technology, which is designed to reduce emissions from calcination—the most energy-intensive step in lithium processing—by more than 80% when powered by renewable energy. Once operational, the plant is expected to produce approximately 3,000 tonnes of lithium phosphate per year for use in lithium-ion batteries, particularly for electric vehicles and energy storage applications.

“Australia supplies more than half of the world's spodumene but refines only a small portion at home.”

ARENA , verbatim from source
Published by ARENA on arena.gov.au . Detected, standardized, and enriched by GovPing. Review our methodology and editorial standards .

About this source

GovPing monitors Australia ARENA News for new energy regulatory changes. Every update since tracking began is archived, classified, and available as free RSS or email alerts — 4 changes logged to date.

What changed

ARENA has announced a grant of up to $38.1 million to PLS Group Limited under the Advancing Renewables Program, representing ARENA's second investment in the critical energy minerals sector added to its Investment Plan in 2025. The grant supports the construction and operation of a demonstration plant using Calix's electric-kiln technology at the Pilgangoora Operation, with the goal of demonstrating lower-carbon lithium processing methods.

For Australian critical minerals companies and mining operators, this announcement signals continued government support for domestic downstream processing of energy minerals. Companies engaged in spodumene production or lithium refining may find opportunities to explore similar partnerships with ARENA under the Advancing Renewables Program, particularly those seeking to establish or expand low-emissions processing capabilities onshore.

Archived snapshot

Apr 25, 2026

GovPing captured this document from the original source. If the source has since changed or been removed, this is the text as it existed at that time.

Home > News > ARENA backs low emissions lithium refining in WA

ARENA backs low emissions lithium refining in WA

News | 24 April 2026 Renewables for industry The Australian Renewable Energy Agency (ARENA) is providing up to $38.1 million to PLS Group Limited (PLS) to support an innovative, lower – emission lithium processing demonstration plant in Western Australia.

The project will trial Calix Limited’s innovative, electric ‑ kiln technology, which has the potential to cut emissions from calcination, one of the most energy intensive steps in lithium processing, by more than 80% when powered by renewable energy. The demonstration plant is 100% owned and operated by PLS and will be located at its Pilgangoora Operation in the Pilbara.

ARENA CEO Darren Miller said the project supports ARENA’s priority to accelerate low emissions processing technologies in the critical energy minerals sector.

“Australia supplies more than half of the world’s spodumene but refines only a small portion at home. This project is an important step in building Australia’s capability to produce low emissions battery materials onshore and to capture more value from the global transition to clean energy.”

Once fully operational, the plant is designed to produce approximately 3,000 tonnes of lithium phosphate per year, a key material used in the manufacture of lithium-ion batteries, particularly for electric vehicles and energy storage applications.

Australia is the world’s largest producer of spodumene, a mineral used to make lithium chemicals such as lithium phosphate. However, most spodumene is currently processed overseas. By demonstrating a cleaner, more efficient refining process here in Australia, the project aims to build local capability and create new economic opportunities.

PLS Managing Director and CEO Dale Henderson said Australia had a major opportunity to build greater value through local processing.

“The Mid-Stream Demonstration Plant is an important step toward capturing more processing value onshore while demonstrating lower-carbon methods for producing the lithium battery materials the world needs.”

“This funding highlights the Australian Government’s commitment to backing local innovation with the potential to significantly reduce emissions across the global lithium supply chain.”

“We’re proud to be progressing this technology at Pilgangoora with support from the Australian Government, demonstrating how Australia can play a leading role in the sustainable processing of critical energy minerals.”

As a key driver of early-stage capability building in the critical energy minerals sector, ARENA is supporting Australian companies to develop local expertise, build low emissions processing capacity, and lay the foundations for a more resilient and competitive industry.

The Advancing Renewables Program (ARP) is ARENA’s flagship, always-open funding initiative supporting a broad spectrum of renewable energy projects—from early-stage research and development through to demonstration and pre-commercial deployment. This program is continuously open for applications that align with ARENA’s strategic priorities as set out in the Investment Plan.

This project is ARENA’s second investment in critical energy minerals, which was added to the Investment Plan in 2025 as a focus area within the low emissions metals strategic priority.

For more information about the Advancing Renewables Program visit the ARENA funding page.

ARENA Media

media@arena.gov.au **Download this media release

(PDF 181.85 KB) Back to the **Newsroom

Get daily alerts for Australia ARENA News

Daily digest delivered to your inbox.

Free. Unsubscribe anytime.

About this page

What is GovPing?

Every important government, regulator, and court update from around the world. One place. Real-time. Free. Our mission

What's from the agency?

Source document text, dates, docket IDs, and authority are extracted directly from ARENA.

What's AI-generated?

The summary, classification, recommended actions, deadlines, and penalty information are AI-generated from the original text and may contain errors. Always verify against the source document.

Last updated

Classification

Agency
ARENA
Published
April 24th, 2026
Instrument
Notice
Branch
Executive
Legal weight
Non-binding
Stage
Final
Change scope
Minor

Who this affects

Applies to
Government agencies Energy companies
Industry sector
2120 Mining
Activity scope
Government grant disbursement Low-emissions technology demonstration Critical minerals processing
Geographic scope
Australia AU

Taxonomy

Primary area
Energy
Operational domain
Government Contracting
Topics
Environmental Protection Mining and Minerals

Get alerts for this source

We'll email you when Australia ARENA News publishes new changes.

Free. Unsubscribe anytime.

You're subscribed!