Notice of Interim Approval of Rate Schedules for Kerr-Philpott Projects
Summary
The Southeastern Power Administration, part of the Department of Energy, has issued a notice regarding the interim approval of rate schedules for the Kerr-Philpott system of projects. This notice details the approved rates and their effective date.
What changed
The Southeastern Power Administration (SEPA), under the Department of Energy, has published a notice announcing the interim approval of rate schedules for the Kerr-Philpott system of projects. This action, detailed in document 2025-17842, specifies the approved rates that will be in effect on an interim basis.
Regulated entities involved with the Kerr-Philpott system should review the published rate schedules to understand any immediate financial implications. The interim approval is effective October 1, 2025. No specific compliance actions are detailed in this notice, but awareness of the approved rates is necessary for ongoing operations.
Source document (simplified)
Legal Status This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to About the Federal Register on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Legal Status
Notice
Notice of Interim Approval of Rate Schedules for Kerr-Philpott System of Projects
A Notice by the Southeastern Power Administration on 09/16/2025
- 1.
1.
Document Details Published Content - Document Details Agencies Department of Energy Southeastern Power Administration Document Citation 90 FR 44665 Document Number 2025-17842 Document Type Notice Pages 44665-44682
(18 pages) Publication Date 09/16/2025 Published Content - Document DetailsPDF Official Content
- View printed version (PDF) Official Content
Document Details Published Content - Document Details Agencies Department of Energy Southeastern Power Administration Document Citation 90 FR 44665 Document Number 2025-17842 Document Type Notice Pages 44665-44682
(18 pages) Publication Date 09/16/2025 Published Content - Document DetailsDocument Dates Published Content - Document Dates Effective Date 2025-10-01 Dates Text Approval of rates on an interim basis is effective on October 1, 2025. Published Content - Document Dates
Table of Contents Enhanced Content - Table of Contents This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.- AGENCY:
- ACTION:
- SUMMARY:
- DATES:
- FOR FURTHER INFORMATION CONTACT:
- SUPPLEMENTARY INFORMATION:
- Department of Energy
- Administrator, Southeastern Power Administration
- Order Confirming and Approving Power Rates on an Interim Basis
- Background
- Public Notice and Comment
- Public Comments
- Discussion
- System Repayment
- Legal Authority
- Environmental Compliance
- Determination Under Executive Order 12866
- Availability of Information
- Order
- Signing Authority
- Wholesale Power Rate Schedule VA-1-E
- Wholesale Power Rate Schedule VA-2-E
- Wholesale Power Rate Schedule VA-3-E
- Wholesale Power Rate Schedule VA-4-E
- Wholesale Power Rate Schedule DEP-1-E
- Wholesale Power Rate Schedule DEP-2-E
- Wholesale Power Rate Schedule DEP-3-E
- Wholesale Power Rate Schedule DEP-4-E
- Wholesale Power Rate Schedule AP-1-E
- Wholesale Power Rate Schedule AP-2-E
- Wholesale Power Rate Schedule AP-3-E
- Wholesale Power Rate Schedule AP-4-E
- Wholesale Power Rate Schedule NC-1-E
- Wholesale Power Rate Schedule Replacement-2-D Enhanced Content - Table of Contents
Public Comments Enhanced Content - Public Comments This feature is not available for this document.
Enhanced Content - Public Comments
- Regulations.gov Data Enhanced Content - Regulations.gov Data Additional information is not currently available for this document.
Enhanced Content - Regulations.gov Data
- Sharing Enhanced Content - Sharing Shorter Document URL https://www.federalregister.gov/d/2025-17842 Email Email this document to a friend Enhanced Content - Sharing
- Print Enhanced Content - Print
- Print this document Enhanced Content - Print
- Document Statistics Enhanced Content - Document Statistics Document page views are updated periodically throughout the day and are cumulative counts for this document. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Page views 44
as of
03/14/2026 at 2:15 pm EDT Enhanced Content - Document Statistics
- Other Formats Enhanced Content - Other Formats This document is also available in the following formats:
JSON Normalized attributes and metadata XML Original full text XML MODS Government Publishing Office metadata More information and documentation can be found in our developer tools pages.
Enhanced Content - Other Formats
- Public Inspection Public Inspection This PDF is FR Doc. 2025-17842 as it appeared on Public Inspection on
09/15/2025 at 8:45 am.
It was viewed
1
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507. Learn more here.
Public Inspection
Published Document: 2025-17842 (90 FR 44665) This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Document Headings Document headings vary by document type but may contain
the following:
- the agency or agencies that issued and signed a document
- the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to
- the agency docket number / agency internal file number
- the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details.
Department of Energy
Southeastern Power Administration
AGENCY:
Southeastern Power Administration, DOE.
ACTION:
Notice of interim approval.
SUMMARY:
The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules VA-1-E, VA-2-E, VA-3-E, VA-4-E, DEP-1-E, DEP-2-E, DEP-3-E, DEP-4-E, AP-1-E, AP-2-E, AP-3-E, AP-4-E, NC-1-E, and Replacement-2-D. These rate schedules are applicable to Southeastern power sold to existing preference customers in North Carolina and Virginia. The rate schedules are approved on an interim basis through September 30, 2030, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.
DATES:
Approval of rates on an interim basis is effective on October 1, 2025.
FOR FURTHER INFORMATION CONTACT:
Carter B. Edge, Assistant Administrator for Finance and Marketing, Southeastern Power Administration, Department of Energy, 1166 Athens Tech Road, Elberton, Georgia 30635-6711, (706) 213-3800; Email: Carter.Edge@sepa.doe.gov.
SUPPLEMENTARY INFORMATION:
FERC, by Order issued December 11, 2020, in Docket No. EF20-5-000 (Accession No.: 20201211-3017), confirmed and approved Wholesale Power Rate Schedules VA-1-D, VA-2-D, VA-3-D, VA-4-D, DEP-1-D, DEP-2-D, DEP-3-D, DEP-4-D, AP-1-D, AP-2-D, AP-3-D, AP-4-D, NC-1-D, and Replacement-2-C for the period October 1, 2020, through September 30, 2025. This order replaces these rate schedules on an interim basis, subject to final approval by FERC.
Department of Energy
Administrator, Southeastern Power Administration
In the Matter of: Southeastern Power Administration, Kerr-Philpott System Power Rates, Rate Order No. SEPA-67
Order Confirming and Approving Power Rates on an Interim Basis
Rate Order No. SEPA-67 and associated rate schedules are applicable to Southeastern Power Administration (Southeastern) power sold to existing preference customers in North Carolina and Virginia. The rate schedules are approved on an interim basis, effective October 1, 2025, through September 30, 2030, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.
Background
Power from the Kerr-Philpott System is presently sold under Wholesale Power Rate Schedules VA-1-D, VA-2-D, VA-3-D, VA-4-D, DEP-1-D, DEP-2-D, DEP-3-D, DEP-4-D, AP-1-D, AP-2-D, AP-3-D, AP-4-D, NC-1-D, and Replacement-2-C. These rate schedules were approved by the FERC in Docket No. EF20-5-000 on December 11, 2020, for a period ending September 30, 2025 (Accession No.: 20201211-3017).
Public Notice and Comment
Notice of a proposed rate adjustment and an adjustment to the annual true-up mechanism was published in the Federal Register May 15, 2025 (90 FR 20669). Southeastern proposed an increase to existing rate schedules and updating the annual true-up mechanism to keep the true-up rates, during over-recovery periods, from being reduced below the initial base capacity and energy rate set in rate filings, for the sale of power from the Kerr-Philpott System effective October 1, 2025, through September 30, 2030. The notice advised interested parties of a public information and comment forum to be ( printed page 44666) held in Elberton, Georgia, and virtually by Microsoft Teams, on June 17, 2025. Written comments were accepted through August 13, 2025. The revenue requirement proposed at the forum was $43,000,000 per year. The initial base rates proposed were $5.95 per kilowatt per month for capacity and 22.75 mills per kilowatt-hour for energy. The rates are based on a repayment study estimating the Kerr-Philpott System will produce the following net revenue available for repayment (rounded to the nearest $10,000):
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $1,840,000 | $1,840,000 |
| 2026 | 170,000 | 2,010,000 |
| 2027 | 3,530,000 | 5,540,000 |
| 2028 | 3,840,000 | 9,380,000 |
| 2029 | 3,930,000 | 13,310,000 |
| 2030 | 3,440,000 | 16,750,000 |
| 2031 | 3,600,000 | 20,350,000 |
| 2032 | 3,720,000 | 24,070,000 |
| 2033 | 3,860,000 | 27,930,000 |
| 2034 | 4,020,000 | 31,950,000 |
The proposed rate schedules continue adjustments annually on April 1 of each year, based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment and include the updated mechanism for over-recovery periods. The annual adjustment will be, for every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Public Comments
Southeastern received oral comments from one participant as part of the public information and comment forum on June 17, 2025. Southeastern received written comments mirroring the oral comments provided in the public information and comment forum from the same representing organization as the forum participant.
The comments are summarized below. Southeastern's responses are provided.
Comment 1: The SeFPC has concerns that the proposed rate increase has not implemented appropriate rate reductions which would otherwise be proper pursuant to the Administrator's authority under Section 5 of the Flood Control Act of 1944. In particular, we believe that SEPA has not reduced proposed costs related to dam safety repairs.
Response to Comment 1: Southeastern's Administrator agrees protecting hydropower customers from bearing costs unrelated to hydropower is a priority, and other such costs should be properly attributed to the relevant purposes of the projects. Southeastern retains authority to ensure rates for power will be the lowest possible rates consistent with sound business principles within the meaning of Section 5 of the Flood Control Act of 1944. While SEPA's Administrator has the responsibility to determine which costs are appropriate, the Administrator is obligated to prudently follow sound business principles in recovering costs associated with generating hydropower, including the amortization of capital Federal investment allocated to power. Southeastern will continue coordination efforts to work with the US Army Corps of Engineers (Corps) to ensure appropriate charging practices.
Comment 2: In the proposed rate increase, supporting materials indicate SEPA will recover $2,050,000 for capitalized expense related to the switchgear building. This is a direct expense for hydropower which was funded through the customer funding program supported by SeFPC members. However, the replacement of the switchgear building is a direct result of the landslide or seismic change at the Philpott project. As such the recovery of the expense should be limited as prescribed by the Dam Safety Act.
Response to Comment 2: Southeastern's Administrator agrees Section 1203 of WRDA 1986 (33 U.S.C. 467n(a)) provides special cost-sharing for modification of dams and related facilities constructed or operated by the Corps, the cause of which results from new hydrologic or seismic data or changes in state-of-the-art design or construction criteria deemed necessary for safety purposes. However, the capitalized expense of the switchgear building, funded through the customer funding program, is appropriate to include in the proposed rates. The expense of the new switchgear building is appropriate as a direct replacement of an existing asset, without upgrades or changes to building function or seismic requirements, ensuring continuity of service rather than enhancement. Replacement of the switchgear building and damaged equipment is not due to a design or construction deficiency but instead due to an external force (i.e., landslide). As a self-insured entity, the Federal government assumes direct financial responsibility for incidents of this nature.
Comment 3: Similarly, as the proposed rate models recovery of the Philpott rewind at a cost of $28,825,400, certain of those costs should be reduced because the Corps estimate for the entire rewind includes costs caused by the landslide. Specifically, the Corps has stated to the Customers that delays caused by the landslide have led to cost increases. As such, the total cost of the Philpott rewind should be decreased in light of the cost impacts solely related to the landslide. Moreover, because the Corps has informed the Customers' representatives that the project will not be completed until 2027 using appropriated dollars, further modeling may be needed to ensure that the customers taking service under the proposed rate are repaying the investment on the project no sooner than when the project becomes commercially operable. In this context, we anticipate that the rate starts to collect interest associated with the capital expenditure for the rewind starting in 2026. Given that the Corps has predicted that the project will be completed in the fall of 2027, the proposed rate over collects for both capital and interest.
Response to Comment 3: Southeastern's Administrator agrees Section 1203 of WRDA 1986 (33 U.S.C. 467n(a)) provides special cost-sharing for modification of dams and related facilities constructed or operated by the Corps, the cause of which results from new hydrologic or seismic data or changes in state-of-the-art design or construction criteria deemed necessary for safety purposes. However, the cost of the Philpott rewind, including interest, is an appropriate cost to include in the proposed rates. The delays and cost impacts are not due to new hydrologic or seismic data or changes in state-of- ( printed page 44667) the-art design or construction criteria deemed necessary for safety purposes but rather an external force (i.e., landslide). 18 CFR 300.12(b) specifies what must be included in the revenue recovery study. The placed-in-service date of Fiscal Year 2026 was based on best available projection data provided to Southeastern by the Corps at the time the revised study was conducted. The payable to U.S. Treasury in each of the generating projects is to be repaid to the U.S. Treasury within the service lives of the assets, not to exceed 50 years from the time the facility is placed in service. There is no requirement for repayment of a specific amount on an annual basis. Interest during construction costs are held by the Corps in Construction in Progress until the asset is transferred to Plant in Service (PIS). At that time, the applicable portion of the interest, together with the other costs representing the completed asset, will be transferred to the appropriate PIS accounts and will be picked up by Southeastern as a capitalized addition or replacement. Interest on Investment begins accruing when the investment is recognized for repayment and is an annual expense.
Comment 4: As noted by counsel at the public forum, we have concerns regarding the inclusion of costs related to water supply which are modeled for inclusion in the rate. All water supply operations under the Water Supply Act of 1958 are assigned an appropriate share of operations and maintenance costs. Asking hydropower customers to assume a portion of water supply costs over collects costs which by law should otherwise be directly assigned to the water supply beneficiaries. As such, SEPA should exclude such costs from the proposed rate.
Response to Comment 4: Southeastern's Administrator agrees protecting hydropower customers from bearing costs unrelated to hydropower is a priority. The water supply expenses for Kerr and Philpott are considered to be joint costs by the Corps and therefore, Southeastern picked up the joint percentage in O&M for power.
In 2018, the Corps financial statements were restated to align with the final cost allocation studies regarding O&M expenses. After the restatement, water supply revenue began being reported on the income statement of John H. Kerr project's financial statements under “Water Supply”, with no credit to power. Southeastern, like other PMAs, is tasked with repaying the power investment, including interest, through revenues generated through the sale of power. The water supply revenue is combined with power revenues to repay the power investment. Southeastern records the water supply revenue as “other operating revenue” when developing the consolidated financial statement because this revenue is associated with a re-allocation of storage from hydropower. Southeastern will continue coordination efforts to work with the Corps to ensure appropriate charging practices.
Discussion
System Repayment
Subsequent to the Public Information and Comment Forum held on June 17, 2025. A formula error within the study was noticed omitting a capitalized deficit from Fiscal Year 2025's end of year remaining investment. The formula error was corrected and the rates proposed during the forum remained unaffected. However, the formula correction did affect the planned cumulative net revenue available for repayment located in the rate schedules and used in the annual adjustment computation.
Additionally, Southeastern received Fiscal Year 2018 through Fiscal Year 2024 revised Multi-Purpose Pension and Post-Retirement Benefit reports from the Corps on August 12, 2025. The revised reports are currently unaudited. However, Southeastern has confidence the revised pension and post-retirement benefit projections are appropriate and conducted an updated revised repayment study reflecting corrected pension and post-retirement benefit expense projections. Using initial proposed rates, the revenue recovery study indicated an over-recovery of revenue. The amended revised repayment study indicated an approximate 2.33% reduction in the annual revenue requirement compared to the originally proposed annual revenue requirement that could be achieved. An amended revised annual revenue requirement of $42,000,000 will meet cost recovery and repayment criteria. The amended revised initial base rates are $5.71 per kilowatt per month for capacity and 21.83 mills per kilowatt-hour for energy. The rates are based on a repayment study estimating the Kerr-Philpott System will produce the following net revenue available for repayment (rounded to the nearest $10,000):
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
An examination of Southeastern's amended revised power repayment study, for the Kerr-Philpott System shows with the amended revised initial base rates, all system power costs are paid within the appropriate repayment period and meet the cost recovery criteria required by existing law and DOE Order RA 6120.2. The Administrator, Southeastern Power Administration, has certified the rates are consistent with applicable law and they are the lowest possible rates to customers consistent with sound business principles.
Legal Authority
By Delegation Order No. S1-DEL-RATES-2016, effective November 19, 2016, the Secretary of Energy delegated: (1) the authority to develop power and transmission rates to Southeastern's Administrator; (2) the authority to confirm, approve, and place such rates into effect on an interim basis to the Deputy Secretary of Energy; and (3) the authority to confirm, approve, and place into effect on a final basis, or to remand or disapprove such rates, to FERC. By Delegation Order No. S1-DEL-S3-2024, effective August 30, 2024, the Secretary of Energy also delegated the authority to confirm, approve, and place such rates into effect on an interim basis to the Under Secretary for Infrastructure. By Redelegation Order No. S3-DEL-SEPA-2023, effective April 10, 2023, the Under Secretary for Infrastructure redelegated the authority to confirm, approve, and place such rates into effect on an interim basis to the Administrator, Southeastern Power Administration.
Environmental Compliance
Southeastern has determined that this action fits within the following categorical exclusion listed in appendix B of 10 CFR part 1021 and Appendix B of DOE's NEPA implementing procedures published on June 30, 2025: B4.3, Electric power marketing rate changes. Categorically excluded projects and activities do not require preparation of either an environmental impact statement or an environmental assessment. A copy of the categorical exclusion determination is available on ( printed page 44668) Southeastern's website at https://bit.ly/KerrPhilpottCategoricalExclusion.
Determination Under Executive Order 12866
Southeastern has an exemption from centralized regulatory review under Executive Order 12866; accordingly, no clearance of this notice by the Office of Management and Budget is required.
Availability of Information
Information regarding these rates, including studies, and other supporting materials, is available for public review in the offices of Southeastern Power Administration, 1166 Athens Tech Road, Elberton, Georgia 30635-6711.
Order
In view of the foregoing and pursuant to the authority redelegated to me by the Under Secretary for Infrastructure, I hereby confirm and approve on an interim basis, effective October 1, 2025, attached Wholesale Power Rate Schedules VA-1-E, VA-2-E, VA-3-E, VA-4-E, DEP-1-E, DEP-2-E, DEP-3-E, DEP-4-E, AP-1-E, AP-2-E, AP-3-E, AP-4-E, NC-1-E, and Replacement-2-D. The rate schedules shall remain in effect on an interim basis through September 30, 2030, unless such period is extended or until FERC confirms and approves them or substitute rate schedules on a final basis.
Signing Authority
This document of the Department of Energy was signed on September 11, 2025, by Virgil G. Hobbs III, Administrator for Southeastern Power Administration, pursuant to delegated authority from the Secretary of Energy. That document, with the original signature and date, is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register.
Signed in Washington, DC, on September 12, 2025.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
Wholesale Power Rate Schedule VA-1-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Company's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and any ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company or PJM. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Transmission: $7.53 per kilowatt of total contract demand per month estimated as of March 2025, is presented for illustrative purposes.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the ( printed page 44669) Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by FERC, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule VA-2-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company and PJM. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Company's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and any ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company or PJM. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Transmission: $7.53 per kilowatt of total contract demand per month estimated as of March 2025, is presented for illustrative purposes.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and ancillary services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the ( printed page 44670) Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by FERC, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule VA-3-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the Projects.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for Transmission and Ancillary Services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company or PJM. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for ( printed page 44671) transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by the Federal Energy Regulatory Commission, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule VA-4-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the Projects.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company or PJM. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges ( printed page 44672) for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by FERC, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule DEP-1-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company) and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Company's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Transmission: $2.3955 per kilowatt of total contract demand per month as of March 2025, is presented for illustrative purposes.
The initial transmission charge will be the Customer's ratable share of the transmission and distribution charges ( printed page 44673) paid by the Government. The rate is subject to periodic adjustment and will be computed in accordance with the terms of the Government-Company contract.
Proceedings before FERC involving the Company's Open Access Transmission Tariff (OATT) or the distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission, in accordance with the Government-Company contract, is six (6) per cent. This loss factor will be governed by the terms of the Government-Company contract.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule DEP-2-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company) and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Company's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Transmission: $2.3955 per kilowatt of total contract demand per month as of March 2025, is presented for illustrative purposes.
The initial transmission charge will be the Customer's ratable share of the transmission and distribution charges paid by the Government. The rate is subject to periodic adjustment and will be computed in accordance with the terms of the Government-Company contract.
Proceedings before FERC involving the Company's Open Access ( printed page 44674) Transmission Tariff (OATT) or the distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission, in accordance with the Government-Company contract, is six (6) per cent. This loss factor will be governed by the terms of the Government-Company contract.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule DEP-3-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company) and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the Projects.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Proceedings before FERC involving the Company's Open Access Transmission Tariff (OATT) or the distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission and distribution charges paid by the Government on behalf of the Customer.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government. ( printed page 44675)
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission, in accordance with the Government-Company contract, is six (6) per cent. This loss factor will be governed by the terms of the Government-Company contract.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule DEP-4-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company). The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the Projects.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
$3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission, in accordance with the Government-Company contract, is six (6) per cent. This loss factor will be governed by the terms of the Government-Company contract.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule AP-1-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in ( printed page 44676) Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Company's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Transmission: $7.53 per kilowatt of total contract demand per month estimated as of March 2025, is presented for illustrative purposes.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by the Federal Energy Regulatory Commission, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month. ( printed page 44677)
Wholesale Power Rate Schedule AP-2-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Company's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Transmission: $7.53 per kilowatt of total contract demand per month estimated as of March 2025, is presented for illustrative purposes.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served ( printed page 44678) from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by the Federal Energy Regulatory Commission, pursuant to application by American Electric Power Service Corporation under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule AP-3-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the Projects.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately ( printed page 44679) to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by FERC, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule AP-4-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the Projects.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for Transmission and Ancillary Services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Company. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of the Company's rate.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Company's or PJM's OATT.
Capacity Performance Non-Performance Charge: Requirements of the PJM capacity performance market may lead to non-performance charges to Southeastern. These non-performance charges, if incurred, will be allocated to the capacity delivered in PJM (currently 120,100 kilowatts) in the month incurred.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Company (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately ( printed page 44680) to its individual delivery points served from the Company's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by the Federal Energy Regulatory Commission, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule NC-1-E
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Duke Energy Progress (formerly known as Carolina Power & Light and hereinafter called DEP), and billed pursuant to contracts between the Government and the Customer. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.
Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.
Character of Service: The electric capacity and energy supplied hereunder will be delivered at the delivery points of the Customer on the Virginia Power's transmission and distribution system.
Monthly Rate: The initial base monthly rate for capacity, energy, and generation services provided under this rate schedule for the period specified shall be:
Initial Base Capacity Charge: $5.71 per kilowatt of total contract demand per month.
Initial Base Energy Charge: 21.83 mills per kilowatt-hour.
The rates are based on a repayment study that projects that the Kerr-Philpott System will produce the following net revenue available for repayment by fiscal year and cumulative net revenue available for repayment by fiscal year:
| Fiscal year | Estimated annual
net revenue
available for
repayment | Cumulative
net revenue
available for
repayment |
| --- | --- | --- |
| 2025 | $360,000 | $360,000 |
| 2026 | 630,000 | 990,000 |
| 2027 | 4,000,000 | 4,990,000 |
| 2028 | 4,310,000 | 9,300,000 |
| 2029 | 4,460,000 | 13,760,000 |
| 2030 | 3,970,000 | 17,730,000 |
| 2031 | 4,150,000 | 21,880,000 |
| 2032 | 4,280,000 | 26,160,000 |
| 2033 | 4,430,000 | 30,590,000 |
| 2034 | 4,610,000 | 35,200,000 |
The rates include a true-up of the capacity and energy rates based on the variance of the actual cumulative net revenue available for repayment from the planned cumulative net revenue available for repayment in the table above. For every $100,000 under-recovery of the planned cumulative net revenue available for repayment, Southeastern will increase the base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month, and increase the base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt per hour, to be implemented April 1 of the next fiscal year. For every $100,000 over-recovery of the planned cumulative net revenue available for repayment, Southeastern will reduce the current base capacity charge by $0.02 per kilowatt per month, up to a maximum of $0.75 per kilowatt per month but not below the initial base capacity charge set in the rate filing, and reduce the current base energy charge by 0.10 mills per kilowatt-hour, up to a maximum of 3.0 mills per kilowatt-hour but not below the initial base energy charge set in the rate filing, to be implemented April 1 of the next fiscal year. Southeastern will give written notice to the customers of the amount of the true-up to the capacity and energy rates by February 1 of the next fiscal year.
Additional rates for transmission and ancillary services provided under this rate schedule shall be the rates charged Southeastern Power Administration by the Virginia Power and DEP. Future adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of Virginia Power's or DEP's rate.
Transmission: $7.53 per kilowatt of total contract demand per month estimated as of March 2025, is presented for illustrative purposes.
Ancillary Services: 8.24 mills per kilowatt-hour of energy estimated as of March 2025, is presented for illustrative purposes.
The initial charge for transmission and Ancillary Services will be the Customer's ratable share of the charges for transmission, distribution, and ancillary services paid by the Government. The charges for transmission and ancillary services are governed by and subject to refund based upon the determination in proceedings before FERC involving the Company's or PJM's Open Access Transmission Tariff (OATT).
Proceedings before FERC involving the OATT or the Distribution charge may result in the separation of charges currently included in the transmission rate. In this event, the Government may charge the Customer for any and all separate transmission, ancillary services, and distribution charges paid by the Government in behalf of the Customer. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Tandem Transmission Charge: $3.33 per kilowatt of total contract demand per month, as an estimated cost as of March 2025.
The tandem transmission charge will recover the cost of transmitting power from a project to the border of another transmitting system. This rate will be a formulary rate based on the cost to the Government for transmission of power from the Philpott project to the border of the Virginia Electric and Power Company System and the cost to the Government for transmission of power from the John H. Kerr Project to the border of the Duke Energy Progress System. These charges could be recovered through a capacity charge or an energy charge, as determined by the Government.
Transmission and Ancillary Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving the Virginian Power or PJM's OATT.
Transmission, System Control, Reactive, and Regulation Services: The charges for transmission and ancillary services shall be governed by and subject to refund based upon the determination in the proceeding involving Virginia Power's, DEP's, or PJM's OATT.
Contract Demand: The contract demand is the amount of capacity in kilowatts stated in the contract which the Government is obligated to supply and the Customer is entitled to receive.
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the ( printed page 44681) energy made available to Virginia Power (less applicable losses). The Customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Virginia Power's system. The applicable energy loss factor for transmission is specified in the OATT.
These losses shall be effective until modified by FERC, pursuant to application by the Company or PJM under Section 205 of the Federal Power Act or Southeastern Power Administration under Section 206 of the Federal Power Act or otherwise.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
Wholesale Power Rate Schedule Replacement-2-D
Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System).
Applicability: This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer.
Character of Service: The energy supplied hereunder will be delivered at the delivery points provided for under appropriate contracts between the Government and the Customer.
Monthly Charge: The customer will pay its ratable share of Southeastern's monthly cost for replacement energy. The ratable share will be the cost allocation factor for the customer listed in the table below times Southeastern's monthly cost for replacement energy purchased for the Kerr-Philpott System, rounded to the nearest $0.01.
| Contract No. 89-00-1501- | Customer | Capacity
allocation | Average
energy | Cost allocation
factor
(%) |
| --- | --- | --- | --- | --- |
| 1230 | Albemarle EMC | 2,593 | 7,265,195 | 1.5607720 |
| 1221 | B-A-R-C EC | 3,740 | 10,478,931 | 2.2511750 |
| 853 | Brunswick EMC | 3,515 | 11,224,831 | 2.4114160 |
| 854 | Carteret-Craven EMC | 2,679 | 8,555,141 | 1.8378900 |
| 869 | Carteret-Craven EMC (Harkers Island) | 56 | 44,980 | 0.0096630 |
| 855 | Central EMC | 1,239 | 3,956,633 | 0.8499980 |
| 1220 | Central Virginia EC | 7,956 | 22,291,834 | 4.7889250 |
| 1203 | City of Bedford | 1,200 | 938,157 | 0.2015430 |
| 1204 | City of Danville | 5,600 | 4,378,067 | 0.9405340 |
| 895 | City of Elizabeth City | 2,073 | 1,665,112 | 0.3577140 |
| 1215 | City of Franklin | 1,003 | 782,530 | 0.1681100 |
| 878 | City of Kinston | 1,466 | 1,177,546 | 0.2529710 |
| 880 | City of Laurinburg | 415 | 333,343 | 0.0716120 |
| 881 | City of Lumberton | 895 | 718,898 | 0.1544400 |
| 1205 | City of Martinsville | 1,600 | 1,250,876 | 0.2687240 |
| 882 | City of New Bern | 1,204 | 967,098 | 0.2077600 |
| 1206 | City of Radford | 1,300 | 1,016,229 | 0.2183150 |
| 885 | City of Rocky Mount | 2,538 | 2,038,617 | 0.4379530 |
| 1208 | City of Salem | 2,200 | 1,719,771 | 0.3694560 |
| 892 | City of Washington | 2,703 | 2,171,151 | 0.4664250 |
| 889 | City of Wilson | 2,950 | 2,369,550 | 0.5090470 |
| 1222 | Community EC | 4,230 | 11,851,841 | 2.5461150 |
| 1211 | Craig-Botetourt EC | 1,692 | 4,740,626 | 1.0184220 |
| 1231 | Edgecombe-Martin County EMC | 4,155 | 11,641,687 | 2.5009680 |
| 875 | Fayetteville Public Works Commission | 5,431 | 4,362,383 | 0.9371650 |
| 856 | Four County EMC | 4,198 | 13,405,929 | 2.8799780 |
| 891 | Greenville Utilities Commission | 7,534 | 6,051,592 | 1.3000550 |
| 857 | Halifax EMC | 585 | 1,868,144 | 0.4013310 |
| 1232 | Halifax EMC | 2,021 | 5,662,529 | 1.2164730 |
| 1216 | Harrisonburg Electric Commission | 2,691 | 2,099,488 | 0.4510300 |
| 858 | Jones-Onslow EMC | 5,184 | 16,554,630 | 3.5564090 |
| 859 | Lumbee River EMC | 3,729 | 11,908,221 | 2.5582270 |
| 1223 | Mecklenburg EMC | 11,344 | 31,784,224 | 6.8281630 |
| 1224 | Northern Neck EC | 3,944 | 11,050,509 | 2.3739660 |
| 1225 | Northern Virginia EC | 3,268 | 9,157,238 | 1.9672370 |
| 860 | Pee Dee EMC | 2,968 | 9,478,037 | 2.0361540 |
| 861 | Piedmont EMC | 1,086 | 3,467,757 | 0.7449740 |
| 862 | Pitt & Greene EMC | 1,580 | 5,045,586 | 1.0839370 |
| 1226 | Prince George EC | 2,530 | 7,088,689 | 1.5228540 |
| 863 | Randolph EMC | 3,608 | 11,521,818 | 2.4752170 |
| 1227 | Rappahannock EC | 22,427 | 62,837,164 | 13.4992270 |
| 1233 | Roanoke EMC | 5,528 | 15,488,635 | 3.3274030 |
| 1228 | Shenandoah Valley EMC | 9,938 | 27,844,819 | 5.9818650 |
| 864 | South River EMC | 6,119 | 19,540,468 | 4.1978530 |
| 1229 | Southside EC | 14,575 | 40,837,012 | 8.7729610 |
| 865 | Tideland EMC | 680 | 2,171,517 | 0.4665040 |
| 1234 | Tideland EMC | 2,418 | 6,774,859 | 1.4554340 |
| 870 | Town of Apex | 145 | 116,470 | 0.0250210 |
| 871 | Town of Ayden | 208 | 167,074 | 0.0358920 |
| 893 | Town of Belhaven | 182 | 146,189 | 0.0314060 |
| 872 | Town of Benson | 120 | 96,388 | 0.0207070 |
| 1212 | Town of Blackstone | 389 | 303,494 | 0.0651990 |
| ( printed page 44682) | | | | |
| 873 | Town of Clayton | 161 | 129,321 | 0.0277820 |
| 1213 | Town of Culpepper | 391 | 305,054 | 0.0655340 |
| 894 | Town of Edenton | 775 | 622,509 | 0.1337330 |
| 1214 | Town of Elkton | 171 | 133,412 | 0.0286610 |
| 1218 | Town of Enfield | 259 | 202,085 | 0.0434140 |
| 874 | Town of Farmville | 237 | 190,368 | 0.0408960 |
| 876 | Town of Fremont | 60 | 48,194 | 0.0103540 |
| 896 | Town of Hamilton | 40 | 32,129 | 0.0069020 |
| 897 | Town of Hertford | 203 | 163,057 | 0.0350290 |
| 898 | Town of Hobgood | 46 | 36,949 | 0.0079380 |
| 877 | Town of Hookerton | 30 | 24,097 | 0.0051770 |
| 879 | Town of La Grange | 93 | 74,701 | 0.0160480 |
| 868 | Town of Louisburg | 857 | 2,736,773 | 0.5879370 |
| 883 | Town of Pikeville | 40 | 32,129 | 0.0069020 |
| 884 | Town of Red Springs | 117 | 93,979 | 0.0201890 |
| 1207 | Town of Richlands | 500 | 390,899 | 0.0839760 |
| 899 | Town of Robersonville | 232 | 186,351 | 0.0400340 |
| 900 | Town of Scotland Neck | 304 | 244,184 | 0.0524580 |
| 886 | Town of Selma | 183 | 146,993 | 0.0315780 |
| 887 | Town of Smithfield | 378 | 303,624 | 0.0652270 |
| 901 | Town of Tarboro | 2,145 | 1,722,945 | 0.3701380 |
| 888 | Town of Wake Forest | 149 | 119,682 | 0.0257110 |
| 1217 | Town of Wakefield | 106 | 82,700 | 0.0177660 |
| 1219 | Town of Windsor | 331 | 258,243 | 0.0554780 |
| 866 | Tri-County EMC | 3,096 | 9,886,793 | 2.1239670 |
| 867 | Wake EMC | 2,164 | 6,910,536 | 1.4845810 |
| Total | | 196,500 | 465,487,218 | 100.0000000 |
Energy to be Furnished by the Government: The Government will sell to the Customer and the Customer will purchase from the Government energy each billing month equivalent to a percentage specified by contract of the energy made available to the Facilitator (less any losses required by the Facilitator). The customer's contract demand and accompanying energy will be allocated proportionately to its individual delivery points served from the Facilitator's system.
Billing Month: The billing month for power sold under this schedule shall end at 12:00 midnight on the last day of each calendar month.
[FR Doc. 2025-17842 Filed 9-15-25; 8:45 am]
BILLING CODE 6450-01-P
Published Document: 2025-17842 (90 FR 44665)
Related changes
Source
Classification
Who this affects
Taxonomy
Browse Categories
Get Energy Regulation alerts
Weekly digest. AI-summarized, no noise.
Free. Unsubscribe anytime.
Get alerts for this source
We'll email you when FR: Southeastern Power Administration publishes new changes.