NNSA Notice of Intent for Plutonium Pit Production EIS
Summary
The National Nuclear Security Administration (NNSA) has issued a Notice of Intent to prepare a Programmatic Environmental Impact Statement (PEIS) for plutonium pit production. The NNSA is seeking public input on the scope of the PEIS, with a comment deadline of July 14, 2025.
What changed
The National Nuclear Security Administration (NNSA), a component of the Department of Energy, has published a Notice of Intent to prepare a Programmatic Environmental Impact Statement (PEIS) concerning plutonium pit production. This action initiates a public scoping process to gather input on the scope and alternatives to be considered in the PEIS. The NNSA is inviting comments from Federal agencies, Tribes, State and local governments, industry, and the public.
Regulated entities and interested parties should review the scope of the proposed PEIS and submit comments by July 14, 2025, which is 45 days after the final public scoping meeting scheduled for May 28, 2025. While this notice does not impose immediate compliance obligations, participation in the scoping process is crucial for influencing the development of the PEIS, which will guide future decisions on plutonium pit production and its environmental impact.
What to do next
- Review the scope and alternatives for the Programmatic Environmental Impact Statement (PEIS) for plutonium pit production.
- Submit comments on the PEIS scope and alternatives by July 14, 2025.
Source document (simplified)
Legal Status This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to About the Federal Register on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Legal Status
Notice
Notice of Intent To Prepare a Programmatic Environmental Impact Statement for Plutonium Pit Production
A Notice by the National Nuclear Security Administration on 05/09/2025
- 1.
1.
Document Details Published Content - Document Details Agencies Department of Energy National Nuclear Security Administration Document Citation 90 FR 19706 Document Number 2025-08140 Document Type Notice Pages 19706-19708
(3 pages) Publication Date 05/09/2025 Published Content - Document DetailsPDF Official Content
- View printed version (PDF) Official Content
Document Details Published Content - Document Details Agencies Department of Energy National Nuclear Security Administration Document Citation 90 FR 19706 Document Number 2025-08140 Document Type Notice Pages 19706-19708
(3 pages) Publication Date 05/09/2025 Published Content - Document DetailsDocument Dates Published Content - Document Dates Dates Text NNSA will hold initial virtual public scoping meetings and subsequent public hearings on the draft PEIS. During scoping, NNSA invites other Federal agencies, Native American Tribes, State and local governments, industry, other organizations, and members of the public to review and submit comments on the scope and alternatives of the PEIS. The deadline to submit these comments will be 45 days after the final public scoping meeting. As noted, the final public scoping meeting is currently scheduled for May 28, 2025, and therefore, the current deadline for comments is July 14, 2025. Comments received after this date will be considered to the extent practicable. NNSA will hold two virtual public scoping meetings. The information about the scoping meetings (i.e., date, time, phone number, and accessible hyperlink) is provided in the table below. If there are future changes to this information, it would be provided in a future notice posted on the following website: https://www.energy.gov/nnsa/nnsa-nepa-reading-room, no fewer than 15 days from the planned meeting date. Published Content - Document Dates
Table of Contents Enhanced Content - Table of Contents This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.- AGENCY:
- ACTION:
- SUMMARY:
- DATES:
- ADDRESSES:
- FOR FURTHER INFORMATION CONTACT:
- SUPPLEMENTARY INFORMATION:
- Background
- Purpose and Need for Agency Action
- Requirements To Fulfill DOE NEPA Compliance
- Preliminary Alternatives
- Preliminary Environmental Analysis
- PEIS Process
- PEIS Preparation and Schedule
- Signing Authority Enhanced Content - Table of Contents
Public Comments Enhanced Content - Public Comments Comments are no longer being accepted.
See DATES for details.
Enhanced Content - Public Comments
- Regulations.gov Data Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
2025 Notices and Other Non-Rulemaking Documents
Docket ID NNSA-2025-0001 Supporting Documents No supporting documents available Enhanced Content - Regulations.gov Data
- Sharing Enhanced Content - Sharing Shorter Document URL https://www.federalregister.gov/d/2025-08140 Email Email this document to a friend Enhanced Content - Sharing
- Print Enhanced Content - Print
- Print this document Enhanced Content - Print
- Document Statistics Enhanced Content - Document Statistics Document page views are updated periodically throughout the day and are cumulative counts for this document. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Page views 599
as of
03/14/2026 at 2:15 pm EDT Enhanced Content - Document Statistics
- Other Formats Enhanced Content - Other Formats This document is also available in the following formats:
JSON Normalized attributes and metadata XML Original full text XML MODS Government Publishing Office metadata More information and documentation can be found in our developer tools pages.
Enhanced Content - Other Formats
- Public Inspection Public Inspection This PDF is FR Doc. 2025-08140 as it appeared on Public Inspection on
05/08/2025 at 8:45 am.
It was viewed
14
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507. Learn more here.
Public Inspection
Published Document: 2025-08140 (90 FR 19706) This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Document Headings Document headings vary by document type but may contain
the following:
- the agency or agencies that issued and signed a document
- the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to
- the agency docket number / agency internal file number
- the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details.
Department of Energy
National Nuclear Security Administration
AGENCY:
National Nuclear Security Administration, Department of Energy.
ACTION:
Notice of intent.
SUMMARY:
The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the United States (U.S.) Department of Energy (DOE), announces its intent to initiate a National Environmental Policy Act of 1969 (NEPA) programmatic environmental impact statement (PEIS) process to ensure NEPA compliance for the production of plutonium pits in support of NNSA's Stockpile Stewardship and Management Program. The PEIS will evaluate the programmatic environmental impacts of producing pits at the Congressionally mandated rate (and potentially other reasonable rates) using various single site and multi-site alternatives; associated activities at other NNSA sites; and associated waste management and transportation activities. The purpose of this Notice is to invite public participation in the PEIS process and to solicit public comment on the scope, environmental issues, and alternatives for consideration by NNSA in the draft PEIS.
DATES:
NNSA will hold initial virtual public scoping meetings and subsequent public hearings on the draft PEIS. During scoping, NNSA invites other Federal agencies, Native American Tribes, State and local governments, industry, other organizations, and members of the public to review and submit comments on the scope and alternatives of the PEIS. The deadline to submit these comments will be 45 days after the final public scoping meeting. As noted, the final public scoping meeting is currently scheduled for May 28, 2025, and therefore, the current deadline for comments is July 14, 2025. Comments received after this date will be considered to the extent practicable. NNSA will hold two virtual public scoping meetings. The information about the scoping meetings (i.e., date, time, phone number, and accessible hyperlink) is provided in the table below. If there are future changes to this information, it would be provided in a future notice posted on the following website: https://www.energy.gov/nnsa/nnsa-nepa-reading-room, no fewer than 15 days from the planned meeting date.
| Virtual scoping meeting
dates and times | Hyperlink |
| --- | --- |
| Tuesday, May 27, 2025, 5-7:30 p.m. ET | https://bit.ly/PuPEISMtg1. Dial in by Phone: (571) 429-4592.
Phone conference ID: 808 821 801#. |
| Wednesday, May 28, 2025, 7-9:30 p.m. ET | https://bit.ly/PuPEISMtg2. Dial in by Phone: (571) 429-4592.
Phone conference ID: 989 289 432#. |
ADDRESSES:
Written comments on the scope of the PEIS, requests to be placed on the PEIS distribution list, and comments or questions on the scoping process should be sent to: Ms. Jade Fortiner, NEPA Document Manager, National Nuclear Security Administration, Office of Pit Production Modernization, U.S. Department of Energy, 1000 Independence Ave. SW, Washington, DC 20585 or email to PitPEIS@nnsa.doe.gov. Before including your address, phone number, email address, or other personal identifying information in your comment, please be advised that your entire comment—including your personal identifying information—may be made publicly available. If you wish for NNSA to withhold your name and/or other personally identifiable information, please state this prominently at the beginning of your comment. You may also submit comments anonymously. NNSA requests all Federal, State, Native American Tribes, and local agencies that desire to be designated as cooperating agencies on the PEIS to contact the NEPA Document Manager at the address listed in this section by the end of the scoping period.
FOR FURTHER INFORMATION CONTACT:
For further information about this Notice, please contact Ms. Kristen M. Dors, NEPA Compliance Officer, NNSA Office of Environment, Safety and Health, Los Alamos Field Office, 3747 West Road, Los Alamos, NM 87544; telephone: 505-606-8953; or email to: PitPEIS@nnsa.doe.gov.
This Notice will be available on the internet at: https://www.energy.gov/nepa/listings/notices-intent-noi and https://www.energy.gov/nnsa/nnsa-nepa-reading-room.
SUPPLEMENTARY INFORMATION:
Background
NNSA is responsible for meeting the national security requirements established by the President and Congress to maintain and enhance the safety, reliability, and performance of the U.S. nuclear weapons stockpile. Plutonium pits are critical components of every nuclear weapon; nearly all current stockpile pits were produced from 1978 to 1989. The United States' capability to produce plutonium pits is limited and does not meet Federal requirements.
Per title 50 United States Code (U.S.C.) 2538a, NNSA is mandated to manufacture no fewer than 80 war reserve pits per year by 2030. This number is driven by the stockpile's size, the need to replace existing pits as they age, and the requirement for the United States to have a flexible and resilient manufacturing capability with the capacity to produce a variety of pits to meet current and planned military stockpile requirements and ensure the safety, security, and effectiveness of the nation's nuclear stockpile.
Previously, NNSA prepared the 2008 Complex Transformation Supplemental PEIS (DOE/EIS-0236-S4) to analyze the potential environmental impacts associated with pit production at different site alternatives: Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico; Savannah River Site (SRS) near Aiken, South Carolina; Pantex Plant near Amarillo, Texas; Y-12 National Security Complex in Oak Ridge, Tennessee; and the Nevada Test Site (now named the Nevada National Security Site) north of Las Vegas, Nevada. At SRS, the Complex Transformation Supplemental PEIS also evaluated a pit production facility that would use the Mixed-Oxide Fuel Fabrication Facility and Pit Disassembly and Conversion Facility infrastructure. Additionally, pit production at LANL has been analyzed in several NEPA documents over the past two decades, including the 2008 Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico (DOE/EIS-0380) and the 2020 Final Supplement Analysis of the 2008 ( printed page 19707) Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory for Plutonium Operations (DOE/EIS-380-SA-06). On September 2, 2020, NNSA published a record of decision (ROD) stating LANL will implement actions to produce a minimum of 30 war reserve pits per year during 2026 for the national pit production mission and implement surge efforts to exceed 30 pits per year up to the analyzed limit (80 war reserve pits per year) as necessary (85 FR 54550).
Purpose and Need for Agency Action
The national security policies of the United States require a safe, secure, and reliable nuclear weapons stockpile and the maintenance of core competencies to design, manufacture, and maintain nuclear weapons. The 2022 Nuclear Posture Review identified plutonium pit production as one of the highest priorities in the modernization of the nuclear security enterprise over the next ten years. To meet the need outlined in Federal legislation and requirements delineated by the U.S. Department of Defense, NNSA must establish a workforce and infrastructure capable of producing no fewer than 80 pits per year as soon as possible, while eliminating single point failures and providing flexible capacity options. The PEIS process is to ensure NEPA compliance for production of plutonium pits in support of these requirements and NNSA's Stockpile Stewardship and Management Program. The PEIS will evaluate the programmatic environmental impacts of producing pits at the Congressionally mandated rate needed to meet Federal requirements (and potentially other reasonable rates) using various single site and multi-site alternatives; associated activities at other NNSA sites; and associated waste management and transportation activities.
Requirements To Fulfill DOE NEPA Compliance
NNSA is responsible for management and implementation of the requirements of NEPA, and the regulations and policies promulgated thereunder, including, but not limited to the National Environmental Policy Act of 1969, DOE NEPA implementing procedures (10 CFR part 1021), the Amendments to NEPA from the Fiscal Responsibility Act of 2023 (H.R. 3746), DOE Order 451.1B NEPA Compliance Program, and NNSA Policy (NAP) 451.1 NEPA Compliance Program. The PEIS will be prepared pursuant to NEPA and applicable regulations and policies promulgated thereunder. The PEIS will be prepared in the same manner as a draft or final EIS and will provide the public with an analysis of the potential environmental impacts, at a programmatic level, associated with the reasonable alternatives.
Preliminary Alternatives
The PEIS will evaluate NNSA's proposal to produce plutonium pits at required quantities to meet national security requirements and the potential environmental impacts associated with a range of reasonable alternatives for achieving the necessary pit production capabilities and operations at a programmatic level. For analytical purposes, this PEIS will evaluate potential impacts over a 50-year period, through approximately 2075.
In the PEIS, NNSA intends to analyze: (1) site alternatives; and (2) capacity alternatives for the near term (producing pits at the current Congressionally mandated rate) and the long term (to account for potential changes in future national security requirements for pits). With regard to site alternatives, NNSA considers LANL and SRS to be reasonable alternatives because of the available facilities and infrastructure at those sites that is being/could be used to produce pits to meet the mandated schedule and capacity requirements. NNSA will evaluate other potential site alternatives in the PEIS if they are determined to be reasonable. Construction of a new facility (greenfield) is likely to be considered unreasonable because it would not meet the federally mandated pit production rate in the near term and is likely cost prohibitive, however, NNSA has not decided to exclude greenfield alternatives at this time.
The No-Action Alternative will be based on NNSA's prior decision to produce 30 pits per year at LANL with surge efforts to produce up to 80 pits per year (85 FR 54544, September 2, 2020). NNSA welcomes input on alternatives to be analyzed in the PEIS.
Preliminary Environmental Analysis
The following issues have been identified for analysis in the PEIS. The list is tentative and intended to facilitate public comment on the scope of the PEIS. It is not intended to be all-inclusive, nor does it imply any predetermination of potential impacts. NNSA specifically invites suggestions for the addition or deletion of items on this list.
Impacts on land use and applicable plans and policies.
Impacts on visual aesthetics.
Impacts on geology and soil.
Impacts on water resources, including floodplains and wetlands.
Impacts on air quality and noise.
Impacts to plants and animals and their habitat, including species which are federally- or State-listed as threatened or endangered, or of special concern.
Impacts to cultural resources such as those that are historic and paleontological.
Socioeconomic impacts to affected communities.
Impacts from traffic and transportation of radiological and hazardous materials and waste.
Impacts from use of utilities, including water and electricity consumption, fuel use, sewer discharges, and resource conservation.
Impacts on the public and workers from exposures to radiological and hazardous materials during construction and normal operations.
Impacts on the public and workers from exposures to radiological and hazardous materials from reasonably foreseeable accidents, and intentional destructive acts.
Impacts on waste management activities and capacities at on-site and off-site locations.
PEIS Process
The scoping process is intended to involve all interested agencies (Federal, State, Native American Tribes, county, and local), public interest groups, businesses, and members of the public. Interested parties are invited to participate in the PEIS process, both to refine the preliminary alternatives and environmental issues to be analyzed in depth and to eliminate from detailed study those alternatives and environmental issues that are not reasonable or pertinent. Input from the scoping process will assist NNSA in formulating the proposed action, refining the alternatives, and defining the scope of PEIS analyses.
Following the scoping period announced in this Notice, and after consideration of comments received during scoping, NNSA will prepare a draft PEIS for pit production. NNSA will announce the availability of the draft PEIS in the Federal Register and through other means, including media outlets in the areas around planned hearing locations. The comment period on the draft PEIS will be at least 90 days. NNSA will hold public hearings on the draft PEIS in Aiken, South Carolina; Kansas City, Missouri; Livermore, California; Santa Fe, New Mexico; Washington DC; and any other location NNSA deems relevant to the PEIS. Details related to those hearings ( printed page 19708) will be provided in NNSA's public notices. Comments received on the draft PEIS will be considered and addressed in the Final PEIS. NNSA will issue a ROD no sooner than 30 days after publication by the Environmental Protection Agency of a Notice of Availability of the final PEIS.
PEIS Preparation and Schedule
NNSA expects to issue the draft PEIS within approximately one year of this NOI and complete the final PEIS and ROD within approximately 2 years.
Signing Authority
This document of the Department of Energy was signed on April 22, 2025, by Teresa M. Robbins, Acting Under Secretary for Nuclear Security and NNSA Administrator, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register.
Signed in Washington, DC, on May 6, 2025.
Jennifer Hartzell,
Alternate Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2025-08140 Filed 5-8-25; 8:45 am]
BILLING CODE 6450-01-P
Published Document: 2025-08140 (90 FR 19706)
Related changes
Source
Classification
Who this affects
Taxonomy
Browse Categories
Get Energy Regulation alerts
Weekly digest. AI-summarized, no noise.
Free. Unsubscribe anytime.
Get alerts for this source
We'll email you when FR: National Nuclear Security Administration publishes new changes.