Changeflow GovPing Transportation Railroad Cost Recovery Procedures - Productivit...
Routine Notice Added Final

Railroad Cost Recovery Procedures - Productivity Adjustment

Favicon for www.federalregister.gov FR: Surface Transportation Board
Published April 3rd, 2026
Detected April 4th, 2026
Email

Summary

The Surface Transportation Board has presented its calculation for the average change in railroad productivity for the 2020-2024 period, proposing a productivity adjustment factor of 1.015 (1.5% per year) under Docket No. EP 290 (Sub-No. 4). The Board issued this decision on March 31, 2026, with an effective date of April 18, 2026. Comments on any perceived data or computational errors may be filed through April 15, 2026.

What changed

The STB announced its proposed productivity adjustment factor of 1.015 (1.5% annually) for the 2020-2024 averaging period in Docket No. EP 290 (Sub-No. 4). This figure represents the geometric mean change in railroad productivity and is used in railroad cost recovery procedures under 49 U.S.C. 10708. The decision was served March 31, 2026, and will take effect April 18, 2026, unless a further order postpones the effective date.

Railroads and interested parties should review the Board's calculation for potential data or computational errors and file any comments by April 15, 2026, via e-filing on the STB website. The adjustment is a routine administrative calculation used in rate proceedings and does not impose new compliance obligations. There are no penalties associated with this notice.

What to do next

  1. Review the STB's proposed productivity adjustment factor of 1.015 for the 2020-2024 period for data or computational errors
  2. File comments addressing any perceived errors by April 15, 2026 via e-filing at www.stb.gov
  3. Ensure comments are served on all parties appearing on the service list

Source document (simplified)

Notice

Railroad Cost Recovery Procedures-Productivity Adjustment

A Notice by the Surface Transportation Board on 04/03/2026

  • This document has a comment period that ends in 11 days.
    (04/15/2026) View Comment Instructions

  • PDF

  • Document Details

  • Document Dates

  • Table of Contents

- Related Documents

  • Public Comments
  • Regulations.gov Data

- Sharing

  • Print
  • Document Statistics
  • Other Formats
  • Public Inspection Published Document: 2026-06555 (91 FR 17054) Document Headings ###### Surface Transportation Board
  1. [Docket No. EP 290 (Sub-No. 4)]

AGENCY:

Surface Transportation Board.

ACTION:

Presentation of the Board's calculation for the change in railroad productivity for the 2020-2024 averaging period.

SUMMARY:

In a decision served on March 31, 2026, the Board proposed to adopt 1.015 (1.5% per year) as the measure of average (geometric mean) change in railroad productivity for the 2020-2024 (five-year) period. The Board's March 31, 2026 decision stated that comments may be filed addressing any perceived data and computational errors in the Board's calculation. The decision also stated that, unless a further order is issued postponing the effective date, the decision will take effect on April 18, 2026.

DATES:

Comments are due by April 15, 2026.

ADDRESSES:

Comments may be filed via e-filing on the Board's website at www.stb.gov. Comments must be served on all parties appearing on the service list.

FOR FURTHER INFORMATION CONTACT:

Pedro Ramirez at (202) 245-0333. If you require accommodation under the Americans with Disabilities Act, please call (202) 245-0245.

SUPPLEMENTARY INFORMATION:

Additional information is contained in the Board's decision, which is available at www.stb.gov under Docket No. EP 290 (Sub-No. 4).

Authority: 49 U.S.C. 10708.

Decided: March 31, 2026.

By the Board, Board Members Fuchs, Hedlund, and Schultz.

Andrea Pope-Matheson,

Clearance Clerk.

[FR Doc. 2026-06555 Filed 4-2-26; 8:45 am]

BILLING CODE 4915-01-P

Published Document: 2026-06555 (91 FR 17054)

Classification

Agency
Surface Transportation Board
Published
April 3rd, 2026
Comment period closes
April 15th, 2026 (11 days)
Compliance deadline
April 15th, 2026 (11 days)
Instrument
Notice
Legal weight
Non-binding
Stage
Final
Change scope
Minor
Document ID
91 FR 17054 / Docket No. EP 290 (Sub-No. 4)
Docket
Docket No. EP 290 (Sub-No. 4)

Who this affects

Applies to
Transportation companies
Industry sector
4821 Rail Transportation
Activity scope
Railroad Cost Recovery Productivity Adjustment Calculations Rate Proceedings
Geographic scope
United States US

Taxonomy

Primary area
Transportation
Operational domain
Compliance
Topics
Railroads Rate Setting

Get Transportation alerts

Weekly digest. AI-summarized, no noise.

Free. Unsubscribe anytime.

Get alerts for this source

We'll email you when FR: Surface Transportation Board publishes new changes.

Optional. Personalizes your daily digest.

Free. Unsubscribe anytime.