Automation tool to create chronological AC power flow cases for large interconnected systems
Assignee
Battelle Memorial Institute
Inventors
Bharat GNVSR Vyakaranam, Tony B. Nguyen, Quan H. Nguyen, Nader A. Samaan, Mallikarjuna R. Vallem, Renke Huang
Abstract
A computer-implemented method includes extending simulation results and input data of a DC production cost model (PCM) of a power grid to an initial AC power flow model (PFM) using a generation distribution mapping and load distribution mapping of a related PFM base example associated with the PCM, and automatically producing a chronological series of converged AC PFM solutions associated with a PCM time series by, for each time step of the PCM time series: (i) updating inputs of an AC PFM using (a) PCM results of the current time step and (b) solution outputs of a converged AC PFM obtained from a previous PCM time step, and (ii) iteratively, reducing nodal loads by a gradual amount configured to account for power grid power flow losses unaccounted for by the PCM and performing AC PFM numerical analyses, until: (a) an AC PFM convergence is obtained and (b) a real power generation slack bus is less than or equal to a predefined tolerance in relation to a slack bus of the PCM results of the current time step.
CPC Classifications
Filing Date
2021-11-03
Application No.
17518478
Claims
22