Showing 50 of 863 documents (last 30 days)
· Live from FERC eLibrary API, cached 2 hoursLetter order accepting Public Service Company of Colorado's 02/02/2026 filing of an executed Network Integration Transmission Service Agreement with Yampa Valley Electric Association, Inc.; etc. under ER26-1246.
ElectricLetter order accepting Duke Energy Carolinas, LLC's 02/02/2026 filing of an executed Large Load Stability and Power Quality Study Agreement with Central Electric Power Cooperative, Inc., designated as Service Agreement No. 737 etc. under ER26-1245.
ElectricLetter order accepting Public Service Company of Colorado's 02/04/2026 filing of revisions to Appendix 14 of Attachment N of the Xcel Energy Operating Companies Joint Open Access Transmission Tariff, etc. under ER26-1266.
ElectricLetter order accepting Southwest Power Pool, Inc.'s 02/10/2026 filing of a revised Interconnection Agreement with Western Area Power Administration and the City of Pierre, South Dakota under ER26-1324.
ElectricLetter to North Anna Power Station accepting the 03/30/2026 request for an extension of time to submit the 10-year detailed Gate Inspection Report for the North Anna Project under P-6335.
HydroOrder Granting Waiver Request re Rouget Road Solar Farm, LLC under ER26-1307.
ElectricLetter order accepting Selkirk Cogen Partners, L.P's 06/17/2025 filing of a notice of change in status under ER25-2524 et al.
ElectricLetter order accepting Selkirk Cogen Partners LLC's 02/04/2026 filing of a revised market-based rate tariff reflecting the name change etc. under ER26-1260.
ElectricOrder on Notice of Change in Status, Instituting Section 206 Proceeding, and Establishing Refund Effective Date re Tucson Electric Power Company et al. under ER10-2564 et al.
ElectricLetter order accepting Midcontinent Independent System Operator, Inc.'s 02/04/2026 filing of proposed revisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff to include in the Tariff the methodology etc. under ER26-1264.
ElectricLetter to Transwestern Pipeline Company, LLC approving the 03/27/2026 request to use FERC's pre-filing review process for the planned Desert Southwest Expansion Project under PF26-9.
GasLetter to Natural Gas Pipeline Company of America, L.L.C. approving the 04/01/2026 request to adjust temporary workspace and utilize additional temporary workspace at the Gulf Coast Storage Expansion Project under CP25-52.
GasLetter order accepting Amber Energy Services, LLC's 03/09/2026 filing of an application for market-based rate authority with an accompanying tariff under ER26-1680.
ElectricLetter order accepting Big Muddy Solar Project, LLC's 03/10/2026 filing of an application for market-based rate authority with an accompanying tariff under ER26-1695.
ElectricLetter order accepting Louisville Gas and Electric Company's et al. 02/05/2026 filing of revisions to Attachment T in its Open Access Transmission Tariff to establish the actual effective date of the Tariff record as 03/31/2026 etc. under ER22-2305.
ElectricOrder Authorizing Disposition of Jurisdictional Facilities re BIV Generation Company, L.L.C. et al. under EC26-57.
ElectricOrder Authorizing Disposition of Jurisdictional Facilities re SE Athos I, LLC et al. under EC26-60.
ElectricLetter order accepting MidAmerican Energy Company's 01/31/2024 filing of a notice of change in status reporting the commercial operation of additional generation capacity under ER11-2044 et al.
ElectricOrder Authorizing Disposition of Jurisdictional Facilities re Entergy Power, LLC under EC26-36.
ElectricOrder Addressing Arguments Raised on Rehearing re Midcontinent Independent System Operator, Inc. under ER26-203.
ElectricOrder on Updated Market Power Analysis, Instituting Section 206 Proceeding, and Establishing Refund Effective Date re New Brunswick Energy Marketing Corporation under ER14-225 et al.
ElectricLetter order accepting New York Independent System Operator, Inc.'s et al. 02/05/2026 filing of an executed Standard Interconnection Agreement with Yellow Barn Solar, LLC under ER26-1274.
ElectricLetter to the City of South Hill, Virginia, accepting the 04/09/2025 letter reporting a 12.10a safety-related incident at the Whittles Mill Project under P-7630.
HydroLetter to American Electric Power accepting the 04/01/2026 request for an extension time for submittals related to the Site-Specific Probable Maximum Precipitation and Probable Maximum Flood for the Claytor Project et al. under P-739 et al.
HydroNotice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re DCR Transmission, L.L.C. under ER23-2309 et al.
ElectricLetter order accepting the California Independent System Operator Corporation's 02/27/2026 filing of Notice of Cancellation of EIM Implementation Agreement with Avangrid Renewables; etc. under ER26-1535 et al.
ElectricLetter order accepting PJM Interconnection, L.L.C.'s 02/03/2026 filing of an amended Interconnection Service Agreement with Lyons Solar, LLC and Mid-Atlantic Interstate Transmission, LLC, designated as Service Agreement No. 6007 under ER26-1249.
ElectricLetter order accepting PJM Interconnection, L.L.C.'s 02/03/2026, as amended on 03/23/2026, filing of a Generation Interconnection Agreement with Virginia Electric and Power Company, designated as Service Agreement No. 7811 under ER26-1250.
ElectricLetter order accepting ISO New England Inc.'s 02/06/2026 filing of its Capital Projects Report and Unamortized Costs Schedule for the quarter ending 12/31/2025 under ER26-1328.
ElectricOrder Approving Recreation Management Plan Pursuant to Article 407 re Eagle Creek Racine Hydro, LLC's Racine Hydroelectric Project under P-2570.
HydroLetter order accepting Equitrans, L.P.'s 03/19/2026 filing of a revised tariff record to reflect Negotiated Rate Agreements with Antero Resources Corporation under RP26-651.
GasLetter to Pacific Gas and Electric Company accepting the 11/13/2025 plan and schedule for the log boom project design package for Upper Bear Dam, part of the Mokelumne Project under P-137. AI
HydroLetter to Pacific Gas and Electric Company granting the 02/26/2026 request for an extension of time to address Recommendations 3 and 6 from the 2020 Part 12D Safety Inspection for Lower Bucks Dam, part of the Bucks Creek Project under P-619.
HydroLetter to Monterey County Water Resources Agency accepting the 03/12/2025 plan and schedule to address a Follow-up action item from the 2024 Annual Dam Safety Inspection for Nacimiento Dam, part of the Nacimiento Project under P-6378.
HydroLetter order accepting Transcontinental Gas Pipe Line Company, LLC's 03/19/2026 filing of revised tariff records to reflect an adjustment of its fuel retention percentages under Rate Schedules LSS and GSS under RP26-652.
GasLetter to East Tennessee Natural Gas, LLC approving the 03/31/2026 request for an extension of time to file post-construction full power load noise surveys for the Talbott Station etc. at the System Alignment Program Project under CP23-131. kg
GasLetter to Ohio Power and Light, LLC granting the 03/27/2026 request for a 60-day extension of time to provide Supporting Design Report information re the application for the proposed Robert C. Byrd Locks and Dam Project under P-15094.
HydroLetter to Pacific Gas and Electric Company granting the 02/19/2026 request for an extension of time to submit the log boom replacement Final Construction Report at Pit 4 Dam, part of the Pit 3, 4, 5 Project under P-233.
HydroLetter order accepting ISO New England Inc.'s et al. 02/09/2026 filing of revisions to section III.2.7 of its Transmission, Markets and Services Tariff to revise the calculation of load weights etc. under ER26-1298.
ElectricLetter order accepting Arizona Public Service Company's 02/26/2026 filing of revisions to Attachment Q of its Open Access Transmission Tariff to include new charge codes etc. under ER26-1517.
ElectricLetter order accepting Alliance Pipeline L.P.'s 02/27/2026, as amended on 03/10/2026, filing of tariff records to reflect adjustments to existing Negotiated Rate Agreements with various customers under RP26-591.
GasLetter order accepting PJM Interconnection, L.L.C.'s 12/17/2025, as amended on 02/03/2026, filing of a Necessary Studies Agreement with Virginia Electric and Power Company under ER26-801.
ElectricLetter to Tri-Dam accepting the 04/25/2025 plan and schedule for the submittal of an Analysis of Alternatives report by 12/10/2026 for the Beardsley Dam, part of the Beardsley/Donnells Project under P-2005.
HydroLetter to Louisiana LNG Infrastructure LLC granting the 03/06/2026 request to install nozzles and internals for LNG Tank 1 located in Area 107A2 and LNG Tank 2 for the Woodside Louisiana LNG Project under CP17-117.
GasLetter order accepting Holyoke Energy Storage 1 LLC's et al. 02/20/2026 filing of an application for market-based rate authority with accompanying tariffs under ER26-1466 et al.
ElectricOrder Denying Petition re Spitfire LLC v. Bonneville Power Administration under EL26-33 et al.
ElectricOrder Addressing Arguments Raised on Rehearing re PJM Interconnection, L.L.C. under ER26-39.
ElectricLetter order accepting American Transmission Company LLC's 02/06/2026 filing of an Amended Project Acceleration Agreement with Vantage Data Centers Realty Investments 1, LLC under ER26-1289.
ElectricLetter order accepting Southeast Supply Header, LLC's 03/11/2026 filing of a revised tariff record to reflect a Negotiated Rate Agreement with Koch Energy Services, LLC for firm transportation service under Rate Schedule FTS under RP26-637.
GasLetter order accepting Iroquois Gas Transmission System, L.P.'s 03/11/2026 filing of a revised tariff record to reflect a Negotiated Rate Agreement with NRG Business Marketing LLC under RP26-638.