← EPO Patent Bulletin

SYSTEM AND METHOD FOR OPERATING AN INVERTER-BASED RESOURCE IN GRID-FORMING MODE (GFM) FOR ENHANCED STABILITY DURING A TRANSIENT GRID POWER EVENT

Publication EP4627689A1 Kind: A1 Mar 11, 2026

Applicants

General Electric Renovables EspaƱa S.L.

Inventors

BASAK, Rupam, TIWARI, Arvind Kumar, PADMARAO, Veena, ROY, Rabisankar, HOLLIDAY, Cornelius Edward, III, HOWARD, Dustin F.

IPC Classifications

H02J 3/38 20060101AFI20240607BHEP F03D 7/02 20060101ALI20240607BHEP H02J 3/48 20060101ALI20240607BHEP

Designated States

AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, ME, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR